W DOC AIRBUS | AMM A320F

Removal of the Control Unit


TASK 25-27-34-000-002-A
Removal of the Control Unit


FIN: 60DS ** ON A/C NOT FOR ALL
FIN: 66DS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
STEPLADDER 2.0 M (6.6 FT)
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
3. Job Set-up
Subtask 25-27-34-861-051-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-27-34-010-053-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Get access to the avionics compartment:
     (a) Put a STEPLADDER 2.0 M (6.6 FT) in position.
     (b) Open the avionics compartment door 811 (Ref. AMM TASK 52-41-00-010-002).
Subtask 25-27-34-865-056-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUDOOR AREA HTG PANELS-CTL54DSA07
2000VUDR AREA HTG PNLS-DR1-FPH-RH52DSA06
2000VUDR AREA HTG PNLS-DR1-FPH-LH51DSA05
** ON A/C NOT FOR ALL
2000VUDR AREA HTG PNLS-DOOR1-FPH-RH52DSF06
2000VUDR AREA HTG PNLS-DOOR1-FPH LH51DSF05
4. Procedure
Subtask 25-27-34-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the Control Unit 60DS and 66DS.
F Control Unit 60DS, 66DS ** ON A/C NOT FOR ALL
NOTE: The procedure for the control units are the same.
   (1) Release the spring latches (3) , loosen the screws (4) and disconnect the electrical connectors (1) and (2).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Push the locking catch (5) and carefully move the control unit (6) out of the adapter assembly (7).