Deactivation of the Heated Floor Panels (HFP)
TASK 25-27-00-040-801-A
Deactivation of the Heated Floor Panels (HFP)
This procedure tells you how to manually isolate a defective HFP.
To do this procedure, refer to the FAA Reference: MMEL TASK: 252701 - Heating Function of HFPs (Passenger/Crew Doors, Emergency Exits and Galley Areas) (FAA only).
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-27-00-861-053-A ** ON A/C NOT FOR ALL
Subtask 25-27-00-865-060-A ** ON A/C NOT FOR ALL
Subtask 25-27-00-862-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:32:49 UTC
Deactivation of the Heated Floor Panels (HFP)
ZONE: 100
ZONE: 200
FIN: 15DS ** ON A/C NOT FOR ALL
FIN: 16DS ** ON A/C NOT FOR ALL
FIN: 30DS ** ON A/C NOT FOR ALL
FIN: 31DS ** ON A/C NOT FOR ALL
FIN: 32DS ** ON A/C NOT FOR ALL
FIN: 33DS ** ON A/C NOT FOR ALL
FIN: 5DS ** ON A/C NOT FOR ALL
FIN: 6DS ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 200
FIN: 15DS ** ON A/C NOT FOR ALL
FIN: 16DS ** ON A/C NOT FOR ALL
FIN: 30DS ** ON A/C NOT FOR ALL
FIN: 31DS ** ON A/C NOT FOR ALL
FIN: 32DS ** ON A/C NOT FOR ALL
FIN: 33DS ** ON A/C NOT FOR ALL
FIN: 5DS ** ON A/C NOT FOR ALL
FIN: 6DS ** ON A/C NOT FOR ALL
This procedure tells you how to manually isolate a defective HFP.
To do this procedure, refer to the FAA Reference: MMEL TASK: 252701 - Heating Function of HFPs (Passenger/Crew Doors, Emergency Exits and Galley Areas) (FAA only).
NOTE: This deactivation task is not related to an AFM-CDL/MMEL item for all aircraft under EASA or CAAC regulation.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 100 | LOWER HALF FUSELAGE INCLUDING RADOME |
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-27-00-00 | ANCILLARY EQUIPMENT - DESCRIPTION AND OPERATION |
Subtask 25-27-00-861-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-41-00-861-002).
(2) For the location of this component, refer to Para. Component Location (Ref. AMM D/O 25-27-00-00).
4. Procedure(1) Energize the ground service network
(Ref. AMM TASK 24-41-00-861-002).
(2) For the location of this component, refer to Para. Component Location (Ref. AMM D/O 25-27-00-00).
Subtask 25-27-00-865-060-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 25-27-00-040-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DOOR AREA HTG PANELS-CTL | 54DS | A07 |
| 2000VU | DR AREA HTG PNLS-DR1-FPH-RH | 52DS | A06 |
| 2000VU | DR AREA HTG PNLS-DR1-FPH-LH | 51DS | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DR AREA HTG PNLS-CTL | 3DS | F08 |
| 2000VU | DR AREA HTG PANELS-DR2-FPH | 1DS | F07 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DR AREA HTG PNLS-DOOR1-FPH-RH | 52DS | F06 |
| 2000VU | DR AREA HTG PNLS-DOOR1-FPH LH | 51DS | F05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DR AREA HTG PANELS-DR2-HTR | 1DS | A08 |
| 2000VU | DR AREA HTG PANELS-DR2-CTL | 3DS | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | DOOR AREA HTG PNL-DOOR3-HTR | 11DS | F05 |
| 2001VU | DR AREA HTG PNLS-DOOR 3-CTL | 13DS | F03 |
B. Deactivation of the HFP at Door 1
(1) Remove the related fuse from the applicable control unit:
(3) Install a grey Inoperative (INOP) label adjacent to the related LED light/fuse on the control unit.
(4) Make an entry in the logbook that the related HFP is isolated.
Subtask 25-27-00-040-051-A ** ON A/C NOT FOR ALL (1) Remove the related fuse from the applicable control unit:
- HFP 30DS (RH-A) / Control Unit 66DS - Heater 1
- HFP 31DS (LH-A) / Control Unit 60DS - Heater 1
- HFP 32DS (RH-B) / Control Unit 66DS - Heater 2
- HFP 33DS (LH-B) / Control Unit 60DS - Heater 2.
(3) Install a grey Inoperative (INOP) label adjacent to the related LED light/fuse on the control unit.
(4) Make an entry in the logbook that the related HFP is isolated.
C. Deactivation of the HFP at the Emergency Exit Doors
(1) Remove the related fuse from the applicable control unit:
(a) For Door 2 Area:
(3) Install a grey Inoperative (INOP) label adjacent to the related LED light/fuse on the control unit.
(4) Make an entry in the logbook that the related HFP is isolated.
Subtask 25-27-00-040-051-B ** ON A/C NOT FOR ALL (1) Remove the related fuse from the applicable control unit:
(a) For Door 2 Area:
- HFP 5DS (LH) / Control Unit 4DS - Heater 1
- HFP 6DS (RH) / Control Unit 4DS - Heater 2.
- HFP 15DS (LH) / Control Unit 14DS - Heater 1
- HFP 16DS (RH) / Control Unit 14DS - Heater 2.
(3) Install a grey Inoperative (INOP) label adjacent to the related LED light/fuse on the control unit.
(4) Make an entry in the logbook that the related HFP is isolated.
C. Deactivation of the HFP at the Emergency Exit Doors
(1) Remove the related fuse from the applicable control unit:
(3) Install a grey Inoperative (INOP) label adjacent to the related LED light/fuse on the control unit.
(4) Make an entry in the logbook that the related HFP is isolated.
Subtask 25-27-00-865-062-A ** ON A/C NOT FOR ALL (1) Remove the related fuse from the applicable control unit:
- HFP 15DS (LH) / Control Unit 14DS - Heater 1
- HFP 16DS (RH) / Control Unit 14DS - Heater 2.
(3) Install a grey Inoperative (INOP) label adjacent to the related LED light/fuse on the control unit.
(4) Make an entry in the logbook that the related HFP is isolated.
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DOOR AREA HTG PANELS-CTL | 54DS | A07 |
| 2000VU | DR AREA HTG PNLS-DR1-FPH-RH | 52DS | A06 |
| 2000VU | DR AREA HTG PNLS-DR1-FPH-LH | 51DS | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DR AREA HTG PNLS-CTL | 3DS | F08 |
| 2000VU | DR AREA HTG PANELS-DR2-FPH | 1DS | F07 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DR AREA HTG PNLS-DOOR1-FPH-RH | 52DS | F06 |
| 2000VU | DR AREA HTG PNLS-DOOR1-FPH LH | 51DS | F05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | DR AREA HTG PANELS-DR2-HTR | 1DS | A08 |
| 2000VU | DR AREA HTG PANELS-DR2-CTL | 3DS | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | DOOR AREA HTG PNL-DOOR3-HTR | 11DS | F05 |
| 2001VU | DR AREA HTG PNLS-DOOR 3-CTL | 13DS | F03 |
Subtask 25-27-00-862-053-A ** ON A/C NOT FOR ALL