W DOC AIRBUS | AMM A320F

Repair of the Flight-Compartment Ceiling Panels


TASK 25-10-00-330-001-A
Repair of the Flight-Compartment Ceiling Panels


ZONE: 211
ZONE: 212
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
212
COCKPIT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 25-00-00-330-002-A
Repairs of Non-structural Components (not in the Cargo Compartments)
TASK 25-00-00-330-003-A
Repairs of Surface Damage of Composite Components (not in the Cargo Compartments)
TASK 25-13-41-000-001-A
Removal of the Ceiling Panels
TASK 25-13-41-400-001-A
Installation of the Ceiling Panels
3. Job Set-up
Subtask 25-10-00-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C ALL
122VULIGHTING/CKPT/DOME3LEY06
Subtask 25-10-00-010-050-A
B. Removal of the Ceiling Panels
   (1) If necessary remove the panel from the aircraft (Ref. AMM TASK 25-13-41-000-001).
   (2) List of the ceiling panels.
ITEM
PANEL IDENT
DESCRIPTION
MATERIAL
IPC CROSS REF.
REMARKS
1
211GC
COVER ASSY
Laminate
25130103
Non repairable
2
211HC
PANEL ASSY
Sandwich
25130103

3
211JC
PANEL ASSY
Sandwich
25130101

4
211FC
212FC
PANEL ASSY
PANEL ASSY
Sandwich
Sandwich
25130101
25130102

5
211DC
212DC
DOOR ASSY
DOOR ASSY
Laminate
Laminate
25130101
25130102
Non repairable
Non repairable
6
211EC
212EC
PANEL ASSY
PANEL ASSY
Joggling
Joggling
25130101
25130102

7
211CC
212CC
PANEL ASSY
PANEL ASSY
Joggling
Joggling
25130101
25130102

8
211BC
212BC
PANEL ASSY
PANEL ASSY
Sandwich
Sandwich
25130101
25130102

9
211AC
212AC
PANEL ASSY
PANEL ASSY
Sandwich
Sandwich
25130101
25130102

4. Procedure
Subtask 25-10-00-330-050-A
A. Damage to the Lining Panel
   (1) Superficial Damage
     (a) If the damage diameter is less than or equal to 50 mm (1.9685 in.) and if the honeycomb core is not damaged, do the repair of the panel (Ref. AMM TASK 25-00-00-330-003).
   (2) Significant Damage
     (a) If the honeycomb core is damaged and/or if the damage diameter is more than 50 mm (1.9685 in.) or if the honeycomb structure is debonded, do the repair of the panel (Ref. AMM TASK 25-00-00-330-002).
5. Close-up
Subtask 25-10-00-410-050-A
A. Installation of the Ceiling Panels
   (1) If necessary, install the panel in the aircraft (Ref. AMM TASK 25-13-41-400-001).
Subtask 25-10-00-865-051-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH08
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CKPT/DOME1LEH06
** ON A/C ALL
122VULIGHTING/CKPT/DOME3LEY06
[Rev.10 from 2021] 2026.03.31 23:27:39 UTC