Installation of the Contactor Located in the Panel 200VU
TASK 24-56-55-400-002-A
Installation of the Contactor Located in the Panel 200VU
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 24-56-55-860-053-B
Subtask 24-56-55-420-051-A
Subtask 24-56-55-865-055-A
[Rev.10 from 2021]
2026.03.31 23:25:14 UTC
Installation of the Contactor Located in the Panel 200VU
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 1.76 and 1.47 m.N (15.58 and 13.01 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-42-400-001-A | Installation of the Ceiling Panels - Forward Utility Area |
Subtask 24-56-55-860-053-B
A. Safety Precautions
(1) On the overhead panel, on the ELEC section of panel 35VU:
(a) Make sure that the GALY & CAB pushbutton switch is released (the OFF legend is on).
(b) Make sure that the WARNING NOTICE(S) is (are) in posittion to tell persons not to operate the GALY & CAB pushbutton switch.
Subtask 24-56-55-865-054-A (1) On the overhead panel, on the ELEC section of panel 35VU:
(a) Make sure that the GALY & CAB pushbutton switch is released (the OFF legend is on).
(b) Make sure that the WARNING NOTICE(S) is (are) in posittion to tell persons not to operate the GALY & CAB pushbutton switch.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| ** ON A/C ALL | |||
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | FWD GALLEY/FEEDER D | 2MC | AE02 |
Subtask 24-56-55-420-051-A
A. Installation of the Contactor
(2) TORQUE the captive screws (5) to between 1.76 and 1.47 m.N (15.58 and 13.01 lbf.in )
.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (4) to the contactor (3).
5. Close-upCAUTION:
MAKE SURE THAT THE CONTACTOR LOCATING PIN IS CORRECTLY ENGAGED IN ITS RECESS LOCATED IN ONE POWER TERMINAL.
THIS PREVENTS DAMAGE TO THE LOCATING PIN WHEN YOU APPLY THE TORQUE.
(1) Install the contactor (3) on the tapped barrels (2) of the contactor base (1). (2) TORQUE the captive screws (5) to between 1.76 and 1.47 m.N (15.58 and 13.01 lbf.in )
.(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (4) to the contactor (3).
Subtask 24-56-55-865-055-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-56-55-410-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| ** ON A/C ALL | |||
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | FWD GALLEY/FEEDER D | 2MC | AE02 |
B. Installation of the Ceiling Panels
(1) Install the ceiling panels (Ref. AMM TASK 25-23-41-400-001).
(2) Install the forward utility-area ceiling-panels (Ref. AMM TASK 25-23-42-400-001).
Subtask 24-56-55-942-051-A (1) Install the ceiling panels (Ref. AMM TASK 25-23-41-400-001).
(2) Install the forward utility-area ceiling-panels (Ref. AMM TASK 25-23-42-400-001).
C. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
Contactor Located in the Panel 200VU