W DOC AIRBUS | AMM A320F

Removal of the Essential 115/26VAC Autotransformer


TASK 24-52-51-000-001-A
Removal of the Essential 115/26VAC Autotransformer


ZONE: 125
FIN: 5XH
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
125
LATERAL AVIONIC COMPARTMENT
812
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 24-52-51-861-051-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 24-52-51-010-050-A
B. Get access to the avionics compartment.
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access door 812 to get access to the avionics compartment.
   (2) Open the access door 812.
   (3) Open the access panel of the AC/DC emergency power center 106VU.
Subtask 24-52-51-865-050-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
106VU26VAC/ESS BUS/SPLY4XHB06
4. Procedure
Subtask 24-52-51-020-050-A
A. Removal of the Autotransformer
   (1) Disconnect the electrical connector (3).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Loosen the 4 screws (4).
   (4) Hold the transformer (1).
   (5) Remove the screws (4) and the washers (5).
   (6) Remove the transformer (1).