Installation of the 115/26VAC Autotransformer
TASK 24-51-51-400-001-A
Installation of the 115/26VAC Autotransformer
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-51-51-860-051-A
Subtask 24-51-51-420-050-A
Subtask 24-51-51-862-050-A Subtask 24-51-51-410-050-A
[Rev.10 from 2021]
2026.03.31 23:24:50 UTC
Installation of the 115/26VAC Autotransformer
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 212 | COCKPIT |
| 121AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| FOR [15XN1] (A/XFMR-115/26VAC, 1) | |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 24-51-51-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position at the access door 121AL.
(2) Make sure that the access door 121AL is open.
(3) Make sure that the external power connector is not connected to the aircraft receptacle.
(4) Make sure that, on the access door 121AL, there is a WARNING NOTICE(S) to tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead ELEC panel 35VU, make sure that these pushbutton switches are released:
(8) In the cockpit, make sure that the panel (6) which gives access to the panel 122VU is removed.
Subtask 24-51-51-865-051-A (1) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position at the access door 121AL.
(2) Make sure that the access door 121AL is open.
(3) Make sure that the external power connector is not connected to the aircraft receptacle.
(4) Make sure that, on the access door 121AL, there is a WARNING NOTICE(S) to tell persons not to connect the external power connector.
(5) In the cockpit, on the overhead ELEC panel 35VU, make sure that these pushbutton switches are released:
- BAT 1, BAT 2,
- APU GEN,
- GEN 1, GEN 2,
- EXT PWR.
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(8) In the cockpit, make sure that the panel (6) which gives access to the panel 122VU is removed.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 15XN1 (A/XFMR115/26VAC, 1) | |||
| 123VU | BUS 1/131XP-A/SPLY | 5XN1 | AB12 |
| FOR FIN: 15XN2 (A/XFMR115/26VAC, 2) | |||
| 123VU | BUS 2/231XP-A/SPLY | 5XN2 | AB01 |
Subtask 24-51-51-420-050-A
A. Installation of the Autotransformer
(1) Put the transformer (2) in position.
(2) Install the washers (3) and the screws (4) and then tighten the screws.
(3) Remove the blanking caps from the electrical connectors (1) and (5).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (1).
Subtask 24-51-51-865-052-A (1) Put the transformer (2) in position.
(2) Install the washers (3) and the screws (4) and then tighten the screws.
(3) Remove the blanking caps from the electrical connectors (1) and (5).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (1).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-51-51-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 15XN1 (A/XFMR115/26VAC, 1) | |||
| 123VU | BUS 1/131XP-A/SPLY | 5XN1 | AB12 |
| FOR FIN: 15XN2 (A/XFMR115/26VAC, 2) | |||
| 123VU | BUS 2/231XP-A/SPLY | 5XN2 | AB01 |
C. Operational Test of the Autotransformer
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) FOR [15XN1] (A/XFMR-115/26VAC, 1)
(a) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(b) Get the HYD page.
(c) Make sure that there is no cross on the HYDRAULIC quantity indications.
(d) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) FOR [15XN2] (A/XFMR-115/26VAC, 2)
(a) On the ADIRS CDU, put the OFF/NAV/ATT selector switch of the ADIRU 2 in NAV position.
(b) Make sure that the FAULT legend on the ADR 2 pushbutton switch does not remain on.
Subtask 24-51-51-710-050-B ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) FOR [15XN1] (A/XFMR-115/26VAC, 1)
(a) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(b) Get the HYD page.
(c) Make sure that there is no cross on the HYDRAULIC quantity indications.
(d) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) FOR [15XN2] (A/XFMR-115/26VAC, 2)
(a) On the ADIRS CDU, put the OFF/NAV/ATT selector switch of the ADIRU 2 in NAV position.
(b) Make sure that the FAULT legend on the ADR 2 pushbutton switch does not remain on.
C. Operational Test of the Autotransformer
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) FOR [15XN1] (A/XFMR-115/26VAC, 1)
(a) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(b) Get the HYD page.
(c) Make sure that there is no cross on the HYDRAULIC quantity indications.
(d) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) FOR [15XN2] (A/XFMR-115/26VAC, 2)
(a) On the ADIRS MSU panel 41VU, set the OFF/NAV/ATT selector switch of the ADIRU 2 to the NAV position.
(b) On the ADR 2 pushbutton switch, make sure that the FAULT legend does not stay on.
5. Close-up(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) FOR [15XN1] (A/XFMR-115/26VAC, 1)
(a) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(b) Get the HYD page.
(c) Make sure that there is no cross on the HYDRAULIC quantity indications.
(d) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) FOR [15XN2] (A/XFMR-115/26VAC, 2)
(a) On the ADIRS MSU panel 41VU, set the OFF/NAV/ATT selector switch of the ADIRU 2 to the NAV position.
(b) On the ADR 2 pushbutton switch, make sure that the FAULT legend does not stay on.
Subtask 24-51-51-862-050-A Subtask 24-51-51-410-050-A
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Install the panel (6) which gives access to panel 122VU.
(4) Close the access door 121AL.
(5) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Install the panel (6) which gives access to panel 122VU.
(4) Close the access door 121AL.
(5) Remove the access platform(s).
Autotransformers