Deactivation of the Galley Supply System
TASK 24-51-00-040-001-A
Deactivation of the Galley Supply System
1. Reason for the Job
MMEL 24-26-02B
GALY & CAB MANUAL LOAD SHED SYSTEM (GALY & CAB PB-SW)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 24-51-00-861-051-B ** ON A/C NOT FOR ALL Subtask 24-51-00-865-052-A ** ON A/C NOT FOR ALL
Subtask 24-51-00-040-050-B ** ON A/C NOT FOR ALL
Subtask 24-51-00-860-053-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:24:45 UTC
Deactivation of the Galley Supply System
1. Reason for the Job
MMEL 24-26-02B
GALY & CAB MANUAL LOAD SHED SYSTEM (GALY & CAB PB-SW)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | PLACARD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 24-51-00-861-051-B ** ON A/C NOT FOR ALL Subtask 24-51-00-865-052-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 24-51-00-860-058-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | ELEC/GALY & CAB/FAULT/LT CTL | 8XA | S25 |
| 122VU | ELEC/GALY & CAB/GND/FLT/LOGIC | 7XA | S24 |
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 307LG | H08 |
| 2000VU | CAB LIGHT PWR-CEILING-AFT | 304LG | H07 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 306LG | H06 |
| 2000VU | CAB LIGHT PWR-CEILING-FWD | 305LG | H05 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 302LG | H04 |
| 2000VU | CAB LIGHT PWR-WINDOW-AFT | 301LG | H03 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 303LG | H02 |
| 2000VU | CAB LIGHT PWR-WINDOW-FWD | 300LG | H01 |
C. In the forward and aft galleys, make sure that all the circuit breakers are closed.
Subtask 24-51-00-860-052-G ** ON A/C NOT FOR ALL D. Aircraft Maintenance Configuration
(1) On the overhead ELEC panel 35VU, make sure that the GALY & CAB pushbutton switch is pushed (OFF legend is off).
(2) On this panel, make sure that the ELEC/COMMERCIAL pushbutton switch is released (OFF legend is on).
(3) On the FWD Attendant Panel (FAP), make sure that the MAIN ON pushbutton switch is set to ON (the green lights of the CABIN WDO and CABIN CLG pushbutton switches are on).
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 24-51-00-860-052-I ** ON A/C NOT FOR ALL (1) On the overhead ELEC panel 35VU, make sure that the GALY & CAB pushbutton switch is pushed (OFF legend is off).
(2) On this panel, make sure that the ELEC/COMMERCIAL pushbutton switch is released (OFF legend is on).
(3) On the FWD Attendant Panel (FAP), make sure that the MAIN ON pushbutton switch is set to ON (the green lights of the CABIN WDO and CABIN CLG pushbutton switches are on).
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
D. Aircraft Maintenance Configuration
(1) On the overhead ELEC panel 35VU, make sure that the GALY & CAB pushbutton switch is pushed (OFF legend is off).
(2) On this panel, make sure that the ELEC/COMMERCIAL pushbutton switch is released (OFF legend is on).
(3) On the Flight Attendant Panel (FAP), select the CABIN LIGHTING page:
(Ref. AMM TASK 31-60-00-860-001).
4. Procedure(1) On the overhead ELEC panel 35VU, make sure that the GALY & CAB pushbutton switch is pushed (OFF legend is off).
(2) On this panel, make sure that the ELEC/COMMERCIAL pushbutton switch is released (OFF legend is on).
(3) On the Flight Attendant Panel (FAP), select the CABIN LIGHTING page:
- Push the hard key LIGHT MAIN ON/OFF to get the lights on, and
- On the CABIN LIGHTING page make sure that AISLE and WDO buttons are green.
(Ref. AMM TASK 31-60-00-860-001).
Subtask 24-51-00-040-050-B ** ON A/C NOT FOR ALL
A. Deactivation of the Galley Supply System
(1) Test of the Commercial Electrical Load-Shedding
5. Close-up(1) Test of the Commercial Electrical Load-Shedding
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower display unit of the ECAM system:
|
2.On the ELEC panel 35VU:
| On the panel 35VU:
|
| | On the lower display unit of the ECAM system:
|
| | In the forward and aft galleys:
|
| | In the passenger cabin:
|
3.On the ELEC panel 35VU:
| On the panel 35VU:
|
| | On the lower display unit of the ECAM system:
|
| | In the forward and aft galleys:
|
| | In the passenger cabin:
|
Subtask 24-51-00-860-053-B ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) On the overhead ELEC panel 35VU:
(Ref. AMM TASK 31-60-00-860-002).
(3) Make an entry in the logbook.
(4) Put a PLACARD in the cockpit to tell persons that the galley supply system is deactivated.
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) On the overhead ELEC panel 35VU:
- Push the ELEC/COMMERCIAL pushbutton switch (OFF legend is off), and
- Push the GALY & CAB pushbutton switch (OFF legend is off).
(Ref. AMM TASK 31-60-00-860-002).
(3) Make an entry in the logbook.
(4) Put a PLACARD in the cockpit to tell persons that the galley supply system is deactivated.
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).