W DOC AIRBUS | AMM A320F

Removal of the Battery Shunt


TASK 24-38-54-000-001-A
Removal of the Battery Shunt


ZONE: 126
FIN: 3PB1
FIN: 3PB2
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
126
LATERAL AVIONIC COMPARTMENT
812, 822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 24-38-54-861-050-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 24-38-54-941-050-A
B. Safety Precautions
   (1) In the cockpit, on the ELEC panel 35VU, release these pushbutton switches:
  • BAT 1,
  • BAT 2.
   (2) In the cockpit, on the ELEC panel 35VU, put a WARNING NOTICE(S) in position to tell persons not to operate the batteries.
Subtask 24-38-54-010-050-A
C. Get access to the avionics compartment.
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the avionics compartment doors 812 and 822.
   (2) Open the access doors 812 and 822.
   (3) Open the access panels of the AC/DC emergency power center 106VU and the battery power center 105VU.
Subtask 24-38-54-865-050-A
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 3PB1 (SHUNTBAT 1)
105VUELEC/HOT BUS/701PP SPLY5PB1D01
105VUELEC/HOT BUS/701PP SPLY12PB1E01
106VUCSM/G /EV/MAN/SPLY6XEB04
122VUELEC/REFLNG/ON/BAT1PRU28
FOR FIN: 3PB2 (SHUNTBAT 2)
105VUELEC/HOT BUS/702PP SPLY5PB2D02
105VUELEC/HOT BUS/702PP SPLY12PB2E02
106VUCSM/G /EV/MAN/SPLY6XEB04
122VUELEC/REFLNG/ON/BAT1PRU28
4. Procedure
Subtask 24-38-54-020-050-A
A. Removal of the Battery Shunt
   (1) Remove the bolts (5).
   (2) Remove and discard the lockwashers (6).
   (3) Remove the washers (7) and the ground cables (8).
   (4) Remove the bolts (2).
   (5) Remove and discard the lockwashers (3).
   (6) Remove the electrical wires (4).
   (7) Remove the bolts (9) and the washers (10).
   (8) Remove the battery shunt (1).
[Rev.10 from 2021] 2026.03.31 23:23:58 UTC