Operational Test of the Battery Charge Limiter (BCL), (without the CFDS)


TASK 24-38-00-710-001-A-01
Operational Test of the Battery Charge Limiter (BCL), (without the CFDS)


ZONE: 210
1. Reason for the Job
Refer to the MPD TASK: 243800-01
OPERATIONAL CHECK OF BATTERY CHARGE LIMITER NO 1 AND NO 2 VIA CFDS
Test of the BCL when the CFDS is not operational
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-30-00-040-001-A
Do a Charging Cycle of the Battery Connected with the Battery Charge Limiter (BCL) or Replacement of the Battery
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
3. Job Set-up
Subtask 24-38-00-860-052-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) In the cockpit, on the overhead panel 35VU, make sure that the BAT 1 and BAT 2 pushbutton switches are released (the OFF legends are on).
   (3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 24-38-00-010-052-A
B. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the avionics compartment door 822.
   (2) Open the access door 822.
   (3) Open the access panel of the BATTERY power center 105VU.
Subtask 24-38-00-865-054-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
105VUELEC/HOT BUS/702PP SPLY5PB2D02
105VUELEC/HOT BUS/701PP SPLY5PB1D01
105VUELEC/BAT REF/BCL29PB2F02
105VUELEC/BAT REF/BCL19PB1F01
105VUELEC/BAT BUS/REF/BCL18PB1G01
105VUELEC/BAT BUS/REF/BCL28PB2J02
125VUBAT BUS/301PP/SPLY11PBCC01
4. Procedure
Subtask 24-38-00-710-052-A
A. Operational Test of the BCL (without the CFDS)
   (1) Do this test:
ACTION
RESULT
1.On the ECAM control panel:
  • get the ELEC page.
On the lower ECAM display unit:
  • the usual configuration comes into view,
  • the BAT 1(2) indication is white,
  • the white OFF indication is in view,
  • the amber crosses are in view at the DC BAT busbar indication.
2.On the panel 35VU:
  • push the BAT 1(2) pushbutton switch.
On the panel 35VU:
  • the OFF legend of the BAT 1(2) pushbutton switch goes off.

On the lower ECAM display unit:
  • the green DC BAT busbar indication comes into view,
  • the green line between the BAT 1(2) indication and the DC BAT busbar indication comes into view. The arrow points to the BAT 1(2) indication,
  • the related parameter indications (voltage and current) come into view in green.

After approximately 12 seconds, the green line between the BAT 1(2) indication and the DC BAT busbar indication:
  • goes out of view if the battery charge is correct and it is not necessary to charge the battery.
  • stays in view if it is necessary to charge the battery.
3.On the panel 35VU:
  • release the BAT 1(2) pushbutton switch.
On the panel 35VU:
  • the OFF legend of the BAT 1(2) pushbutton switch comes on.

On the lower ECAM display unit:
  • the green line between the BAT 1(2) indication and the DC BAT busbar indication goes out of view (if it was in view).

NOTE: If the BAT 1 and BAT 2 pushbutton switches are released simultaneously:
  • the white OFF indication comes into view,
  • the amber crosses come into view at the DC BAT busbar indication.
   (2) If necessary, charge the battery (Ref. AMM TASK 24-30-00-040-001).
5. Close-up
Subtask 24-38-00-410-052-A
A. Close Access
   (1) Close the access panel of the BATTERY power center 105VU.
   (2) Close the access door 822.
   (3) Remove the access platform(s).
Subtask 24-38-00-860-053-A
B. Put the aircraft back to its initial configuration.
   (1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).