Installation of the Contactor
TASK 24-35-55-400-002-A
Installation of the Contactor
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-35-55-010-054-A
Subtask 24-35-55-420-051-A
Subtask 24-35-55-410-052-A
[Rev.10 from 2021]
2026.03.31 23:23:41 UTC
Installation of the Contactor
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | Torque wrench: range to between 0.30 and 0.27 m.daN (26.55 and 23.89 lbf.in ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 125 | LATERAL AVIONIC COMPARTMENT |
| 812, 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-32-00-710-001-A | Operational Test of the DC Generation Switching |
Subtask 24-35-55-010-054-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access doors 812 and 822.
(2) Make sure that the access doors 812 and 822 are open.
(3) In the avionics compartment, make sure that the access panels of the AC/DC emergency power center 106VU and BATTERY power center 105VU are open.
Subtask 24-35-55-865-051-A (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access doors 812 and 822.
(2) Make sure that the access doors 812 and 822 are open.
(3) In the avionics compartment, make sure that the access panels of the AC/DC emergency power center 106VU and BATTERY power center 105VU are open.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/CSM/G /EV AUTO/SPLY | 7XE | C01 |
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| 122VU | ELEC/CNTOR/ESS/DC BUS/TIE | 3PC | W26 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AC ESS/BUS ON/BUS 2 | 2XC | AC01 |
Subtask 24-35-55-420-051-A
A. Installation of the Contactor
(1) Install the contactor (5) in position on the tapped barrels (6) of the contactor base (1).
(2) TORQUE the captive screws (3) to between 0.30 and 0.27 m.daN (26.55 and 23.89 lbf.in )
.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (4) to the contactor (5).
Subtask 24-35-55-865-052-A (1) Install the contactor (5) in position on the tapped barrels (6) of the contactor base (1).
(2) TORQUE the captive screws (3) to between 0.30 and 0.27 m.daN (26.55 and 23.89 lbf.in )
. (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (4) to the contactor (5).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-35-55-710-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/CSM/G /EV AUTO/SPLY | 7XE | C01 |
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| 122VU | ELEC/CNTOR/ESS/DC BUS/TIE | 3PC | W26 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AC ESS/BUS ON/BUS 2 | 2XC | AC01 |
C. Operational Test of the DC Generation Control
(1) Do an operational test of the DC Generation Switching (Ref. AMM TASK 24-32-00-710-001).
5. Close-up(1) Do an operational test of the DC Generation Switching (Ref. AMM TASK 24-32-00-710-001).
Subtask 24-35-55-410-052-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) In the avionics compartment, close the access panels of the AC/DC emergency power center 106VU and the BATTERY power center 105VU.
(3) Close the access doors 812 and 822.
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) In the avionics compartment, close the access panels of the AC/DC emergency power center 106VU and the BATTERY power center 105VU.
(3) Close the access doors 812 and 822.
(4) Remove the access platform(s).
Contactor