W DOC AIRBUS | AMM A320F

Removal of the Essential Transformer Rectifier


TASK 24-34-51-000-001-A
Removal of the Essential Transformer Rectifier


ZONE: 125
FIN: 1PE
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
SLEEVE - INSULATING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
125
LATERAL AVIONIC COMPARTMENT
812
 C. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 24-34-51-010-050-A
A. Aircraft Maintenance Configuration
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the avionics compartment door 812.
   (2) Open the access door 812.
   (3) Open the access panel of the AC/DC emergency power center 106VU.
Subtask 24-34-51-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
106VUESS TR/SPLY4PEC01
4. Procedure
Subtask 24-34-51-020-050-A
A. Removal of the Essential Transformer Rectifier
   (1) Remove the protective caps from the output terminals (8).
   (2) Remove the nuts (5), (10) and the washers (6), (9).
   (3) Disengage the lugs (7) from the output terminals.
   (4) Put an SLEEVE - INSULATING on the lugs.
   (5) Disconnect the connectors (4).
   (6) Put CAP - BLANKING on the connectors.
   (7) Remove the screws (3) and the washers (2).
   (8) Remove the transformer rectifier (1).
[Rev.10 from 2021] 2026.03.31 23:23:31 UTC