Installation of the Transformer Rectifier
TASK 24-32-51-400-001-A
Installation of the Transformer Rectifier
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-32-51-865-051-A
Subtask 24-32-51-420-050-A
Subtask 24-32-51-410-050-A
[Rev.10 from 2021]
2026.03.31 23:23:23 UTC
Installation of the Transformer Rectifier
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 126 | LATERAL AVIONIC COMPARTMENT |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-32-00-710-001-A | Operational Test of the DC Generation Switching |
Subtask 24-32-51-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 24-32-51-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 1PU1 (TR1) | |||
| 123VU | TR1/SPLY | 2PU1 | AB10 |
| FOR FIN: 1PU2 (TR2) | |||
| 123VU | TR2/SVCE/BUS 2/SPLY | 1XX | AB08 |
| 123VU | TR2/214XP/SPLY | 2PU2 | AB04 |
B. Get access to the avionics compartment.
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in positon at the access door 822.
(2) Make sure that the access door 822 is open.
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in positon at the access door 822.
(2) Make sure that the access door 822 is open.
Subtask 24-32-51-420-050-A
A. Installation of the Transformer Rectifier
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Engage the transformer rectifier (1) on the centering pins to put it in position.
(4) Install the washers (10) and the screws (11) and then tighten the screws.
(5) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Make sure that all the electrical connections are clean and in the correct condition.
(7) Connect the connectors (6) to the transformer rectifier.
(8) Remove the insulating sleeves from the lugs (3).
(9) Connect the lugs (3) to the output terminals (2) of the transformer rectifier.
(10) Install the washer (4) and the nut (5) and TORQUE it to between 1.6 and 1.5 m.daN (11.80 and 11.06 lbf.ft )
.
(11) Install the washer (9) and the nut (8) and TORQUE it to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in )
.
(12) Install the protective caps (7) on the output terminals (2).
Subtask 24-32-51-865-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Engage the transformer rectifier (1) on the centering pins to put it in position.
(4) Install the washers (10) and the screws (11) and then tighten the screws.
(5) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Make sure that all the electrical connections are clean and in the correct condition.
(7) Connect the connectors (6) to the transformer rectifier.
(8) Remove the insulating sleeves from the lugs (3).
(9) Connect the lugs (3) to the output terminals (2) of the transformer rectifier.
(10) Install the washer (4) and the nut (5) and TORQUE it to between 1.6 and 1.5 m.daN (11.80 and 11.06 lbf.ft )
. (11) Install the washer (9) and the nut (8) and TORQUE it to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in )
. (12) Install the protective caps (7) on the output terminals (2).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-32-51-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 1PU1 (TR1) | |||
| 123VU | TR1/SPLY | 2PU1 | AB10 |
| FOR FIN: 1PU2 (TR2) | |||
| 123VU | TR2/SVCE/BUS 2/SPLY | 1XX | AB08 |
| 123VU | TR2/214XP/SPLY | 2PU2 | AB04 |
C. Do an operational test of DC Generation Switching (Ref. AMM TASK 24-32-00-710-001)
5. Close-upNOTE: Before you start the operational test, you must reset the transformer rectifier from the CFDS.
Subtask 24-32-51-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 822.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 822.
(3) Remove the access platform(s).
Transformer Rectifier