W DOC AIRBUS | AMM A320F

Installation of the Static Inverter


TASK 24-28-51-400-001-A
Installation of the Static Inverter


ZONE: 126
FIN: 3XB
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
126
LATERAL AVIONIC COMPARTMENT
822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-28-00-710-001-A
Operational Test of the Static Inverter when the Aircraft Electrical Circuits are Energized from the External Power
TASK 24-28-00-710-001-A-01
Operational Test of the Static Inverter when the Aircraft Electrical Circuits are Energized from the APU
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 24-28-51-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
   (3) Make sure that the access door 822 is open.
Subtask 24-28-51-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
105VUELEC/STAT INV/CNTOR/CTL14XBG02
4. Procedure
Subtask 24-28-51-420-050-A
A. Installation of the Static Inverter
   (1) Put the static inverter (1) in position on its support (4).
   (2) Install the washers (5) and the screws (6) and then tighten the screws.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Connect the electrical connector (3).
Subtask 24-28-51-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
105VUELEC/STAT INV/CNTOR/CTL14XBG02
Subtask 24-28-51-710-050-A
C. Do an operational test of the static inverter (Ref. AMM TASK 24-28-00-710-001).
5. Close-up
Subtask 24-28-51-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 822.
   (3) Remove the access platform(s).
Subtask 24-28-51-862-050-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).