Installation of the Static Inverter
TASK 24-28-51-400-001-A
Installation of the Static Inverter
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-28-51-860-050-A
Subtask 24-28-51-420-050-A
Subtask 24-28-51-410-050-A
[Rev.10 from 2021]
2026.03.31 23:23:03 UTC
Installation of the Static Inverter
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 126 | LATERAL AVIONIC COMPARTMENT |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-28-00-710-001-A | Operational Test of the Static Inverter when the Aircraft Electrical Circuits are Energized from the External Power |
| TASK 24-28-00-710-001-A-01 | Operational Test of the Static Inverter when the Aircraft Electrical Circuits are Energized from the APU |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 24-28-51-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
(3) Make sure that the access door 822 is open.
Subtask 24-28-51-865-051-A (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 822.
(3) Make sure that the access door 822 is open.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/STAT INV/CNTOR/CTL | 14XB | G02 |
Subtask 24-28-51-420-050-A
A. Installation of the Static Inverter
(1) Put the static inverter (1) in position on its support (4).
(2) Install the washers (5) and the screws (6) and then tighten the screws.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (3).
Subtask 24-28-51-865-052-A (1) Put the static inverter (1) in position on its support (4).
(2) Install the washers (5) and the screws (6) and then tighten the screws.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the electrical connector (3).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-28-51-710-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/STAT INV/CNTOR/CTL | 14XB | G02 |
Subtask 24-28-51-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 822.
(3) Remove the access platform(s).
Subtask 24-28-51-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 822.
(3) Remove the access platform(s).
Static Inverter