Operational Check of the Manual and Automatic Galley and Bus Shedding
TASK 24-26-00-710-002-A
Operational Check of the Manual and Automatic Galley and Bus Shedding
Refer to the MPD TASK: 242600-02
OPERATIONAL CHECK OF MANUAL AND AUTOMATIC GALLEY AND BUS SHEDDING
Refer to the MPD TASK: 242600-03
OPERATIONAL CHECK OF MANUAL AND AUTOMATIC GALLEY AND BUS SHEDDING
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 24-26-00-861-051-A
Subtask 24-26-00-710-054-C ** ON A/C NOT FOR ALL
Subtask 24-26-00-860-055-A
[Rev.10 from 2021]
2026.03.31 23:22:53 UTC
Operational Check of the Manual and Automatic Galley and Bus Shedding
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 242600-02
OPERATIONAL CHECK OF MANUAL AND AUTOMATIC GALLEY AND BUS SHEDDING
Refer to the MPD TASK: 242600-03
OPERATIONAL CHECK OF MANUAL AND AUTOMATIC GALLEY AND BUS SHEDDING
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| ASM 243203 | |
| ASM 243204 | |
| ASM 245103 | |
| ASM 245601 | |
| ASM 246101 |
Subtask 24-26-00-861-051-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits from the external power or from the APU (Ref. AMM TASK 24-41-00-861-002).
Subtask 24-26-00-865-052-A (1) Energize the aircraft electrical circuits from the external power or from the APU (Ref. AMM TASK 24-41-00-861-002).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 24-26-00-860-054-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | ELEC/GALY & CAB/FAULT/LT CTL | 8XA | S25 |
| 122VU | ELEC/GALY & CAB/GND/FLT/LOGIC | 7XA | S24 |
| 122VU | ELEC/AC SHED BUS/CNTOR | 26XN | U25 |
| 123VU | TR1/SPLY | 2PU1 | AB10 |
| 123VU | TR2/214XP/SPLY | 2PU2 | AB04 |
| 123VU | SHED BUS/218XP/220XP SPLY | 28XN | AC02 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | FWD GALLEY/FEEDER D | 2MC | AE02 |
| ** ON A/C ALL | |||
| 124VU | SHED BUS 210PP/212PP/SPLY | 11PN | BA01 |
C. Aircraft Maintenance Configuration
(1) In all galley areas, make sure that all the circuit breakers are closed.
(2) On AC power center 123VU and on rear circuit-breaker panel 122VU, make sure that all the circuit breakers related to the galley feeder (xxMC) are closed.
(Ref. AMM TASK 31-60-00-860-001).
(4) In the cockpit, on overhead ELEC panel 35VU, make sure that the GALY & CAB pushbutton switch is pushed (OFF legend off).
Subtask 24-26-00-860-054-B ** ON A/C NOT FOR ALL (1) In all galley areas, make sure that all the circuit breakers are closed.
(2) On AC power center 123VU and on rear circuit-breaker panel 122VU, make sure that all the circuit breakers related to the galley feeder (xxMC) are closed.
NOTE: The applicable circuit breakers xxMC are related to the different cabin configurations.
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)(Ref. AMM TASK 31-60-00-860-001).
(4) In the cockpit, on overhead ELEC panel 35VU, make sure that the GALY & CAB pushbutton switch is pushed (OFF legend off).
C. Aircraft Maintenance Configuration
(1) In all galley areas, make sure that all the circuit breakers are closed.
(2) On AC power center 123VU and rear circuit-breaker panel 122VU:
(Ref. AMM TASK 31-60-00-860-001).
(4) In the cockpit, on overhead ELEC panel 35VU:
4. Procedure(1) In all galley areas, make sure that all the circuit breakers are closed.
(2) On AC power center 123VU and rear circuit-breaker panel 122VU:
- Make sure that all the circuit breakers related to the galley feeder (xxMC) are closed.
NOTE: The applicable circuit breakers xxMC are related to the different cabin configurations.
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)(Ref. AMM TASK 31-60-00-860-001).
(4) In the cockpit, on overhead ELEC panel 35VU:
- Make sure that the GALY & CAB pushbutton switch is pushed (OFF legend off).
- Make sure that the COMMERCIAL pushbutton switch is pushed (OFF legend off).
Subtask 24-26-00-710-054-C ** ON A/C NOT FOR ALL
A. Operational Test of the Manual and Automatic Galley and Bus Shedding
Subtask 24-26-00-710-054-D ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM DU:
|
2.On electrical panel 35VU:
| On electrical panel 35VU:
|
| | On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that no item that the DC shed-busbar normal-supply-contactor (10PN) controls is supplied ASM 246101. |
| | Make sure that no item that the AC shed-busbar normal-supply-contactor (27XN) controls is supplied ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that no item that the entertainment contactor (5PU3) controls is supplied ASM 243203. |
3.On electrical panel 35VU:
| On electrical panel 35VU:
|
| | On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that the item(s) that the AC shed-busbar normal-supply-contactor (27XN) controls is(are) supplied with 115VAC/400Hz ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that item(s) that the entertainment contactor (5PU3) controls is supplied with 28VDC ASM 243203. |
| | Make sure that item(s) that the DC shed-busbar normal-supply-contactor (10PN) controls is(are) supplied with 28VDC ASM 246101. |
4.On rear circuit-breaker panel 122VU:
| On the lower ECAM DU, on the ELEC page:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | Make sure that no item that the AC shed-busbar normal-supply-contactor (27XN) controls is supplied ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that no item that the entertainment contactor (5PU3) controls is supplied ASM 243203. |
| | Make sure that no item that the DC shed-busbar normal-supply-contactor (10PN) controls is supplied ASM 246101. |
5.On the ECAM control panel:
| On the lower ECAM DU:
|
6.On rear circuit-breaker panel 122VU:
| |
7.On the ECAM control panel:
| On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that the item(s) that the AC shed-busbar normal-supply-contactor (27XN) controls is(are) supplied with 115VAC/400Hz ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that the item(s) that the entertainment contactor (5PU3) controls is(are) supplied with 28VDC ASM 243203. |
| | Make sure that the item(s) that the DC shed-busbar normal-supply-contactor (10PN) controls is(are) supplied with 28VDC ASM 246101. |
8.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
9.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
10.On AC power-center panel 123VU:
NOTE: This test is for system 1. For the system 2, use the indications between the parentheses. | On the upper ECAM DU:
|
11.On AC power-center panel 123VU:
| On the lower ECAM DU:
|
12.On the MCDU, on the ELEC page:
| On the MCDU:
|
13.On the MCDU:
| On the MCDU, on the TR1(2) page:
|
A. Operational Test of the Manual and Automatic Galley and Bus Shedding
Subtask 24-26-00-710-054-H ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM DU:
|
2.On electrical panel 35VU:
| On electrical panel 35VU:
|
| | On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that no item that the DC shed-busbar normal-supply-contactor (10PN) controls is supplied ASM 246101. |
| | Make sure that no item that the AC shed-busbar normal-supply-contactor (27XN) controls is supplied ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that no item that the entertainment contactor (5PU3) controls is supplied ASM 243204. |
3.On electrical panel 35VU:
| On electrical panel 35VU:
|
| | On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that the item(s) that the AC shed busbar normal-supply-contactor (27XN) controls is(are) supplied with 115VAC/400Hz ASM 245103. |
| | Make sure that item(s) that the DC shed busbar normal-supply-contactor (10PN) controls is(are) supplied with 28VDC ASM 246101. |
| | If TR3 (1PU3) is installed, make sure that the item(s) that the entertainment contactor (5PU3) controls is(are) supplied with 28VDC ASM 243204. |
4.On rear circuit-breaker panel 122VU:
| On the lower ECAM DU, on the ELEC page:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | Make sure that no item that the AC shed-busbar normal-supply-contactor (27XN) controls is supplied ASM 245103. |
| | Make sure that no item that the DC shed busbar normal-supply-contactor (10PN) controls is supplied ASM 246101. |
| | If TR3 (1PU3) is installed, make sure that no item that the entertainment contactor (5PU3) controls is supplied ASM 243204. |
5.On the ECAM control panel:
| On the lower ECAM DU:
|
6.On rear circuit-breaker panel 122VU:
| |
7.On the ECAM control panel:
| On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that the item(s) that the AC shed-busbar normal-supply-contactor (27XN) controls is(are) supplied with 115VAC/400Hz ASM 245103. |
| | Make sure that the item(s) that the DC shed-busbar normal-supply-contact (10PN) controls is(are) supplied with 28VDC ASM 246101. |
| | If TR3 (1PU3) is installed, make sure that the item(s) that the entertainment contactor (5PU3) controls is(are) supplied with 28VDC ASM 243204. |
8.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
9.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
10.On AC power-center panel 123VU:
NOTE: This test is for system 1. For the other system 2, use the indications between the parentheses. | On the upper ECAM DU:
|
11.On AC power-center panel 123VU:
| On the lower ECAM DU:
|
12.On the MCDU, on the ELEC page:
| On the MCDU:
|
13.On the MCDU:
| On the MCDU, on the TR1(2) page:
|
A. Operational Test of the Manual and Automatic Galley and Bus Shedding
5. Close-up| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM DU:
|
2.On electrical panel 35VU:
| On electrical panel 35VU:
|
| | On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that no item that the DC shed-busbar normal-supply-contactor (10PN) controls is supplied ASM 246101. |
| | If TR3 (1PU3) is installed, make sure that no item that the entertainment contactor (5PU3) controls is supplied ASM 245103. |
| | Make sure that no item that the AC shed-busbar normal-supply-contactor (27XN) controls is supplied ASM 245103. |
3.On electrical panel 35VU:
| On electrical panel 35VU:
|
| | On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that item(s) that the AC shed busbar normal-supply-contactor (27XN) controls is(are) supplied with 115VAC/400Hz ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that the item(s) that the entertainment contactor (5PU3) controls is(are) supplied with 28VDC ASM 243203. |
| | Make sure that item(s) that the DC shed-busbar normal-supply-contactor (10PN) controls is(are) supplied with 28VDC ASM 246101. |
4.On rear circuit-breaker panel 122VU:
| On the lower ECAM DU, on the ELEC page:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
|
| | Make sure that no item that the AC shed-busbar normal-supply-contactor (27XN) controls is supplied ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that no item that the entertainment contactor (5PU3) controls is supplied ASM 246101. |
| | Make sure that no item that the DC shed-busbar normal-supply-contactor (10PN) controls is supplied ASM 246101. |
5.On the ECAM control panel:
| On the lower ECAM DU:
|
6.On rear circuit-breaker panel 122VU:
| |
7.On the ECAM control panel:
| On the lower ECAM DU:
|
| | In the forward and aft galleys, if item(s) of equipment is(are) installed:
If the middle galley(s) is(are) installed and has(have) item(s) of equipment:
|
| | Make sure that the item(s) that the AC shed-busbar normal-supply-contactor (27XN) controls is(are) supplied with 115VAC/400Hz ASM 245103. |
| | If TR3 (1PU3) is installed, make sure that the item(s) that the entertainment contactor (5PU3) controls is(are) supplied with 28VDC ASM 243203. |
| | Make sure that the item(s) that the DC shed-busbar normal-supply-contact (10PN) controls is(are) supplied with 28VDC ASM 246101. |
8.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
9.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
10.On AC power-center panel 123VU:
NOTE: This test is for system 1. For the system 2, use the indications between the parentheses. | On the upper ECAM DU:
|
11.On AC power-center panel 123VU:
| On the lower ECAM DU:
|
12.On the MCDU, on the ELEC page:
| On the MCDU:
|
13.On the MCDU:
| On the MCDU, on the TR1(2) page:
|
Subtask 24-26-00-860-055-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits supplied from the external power or from the APU (Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits supplied from the external power or from the APU (Ref. AMM TASK 24-41-00-862-002).