Installation of the Emergency Generator Line Contactor (EMER GLC)
TASK 24-24-55-400-001-A
Installation of the Emergency Generator Line Contactor (EMER GLC)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-24-55-860-052-A
Subtask 24-24-55-420-050-A
Subtask 24-24-55-410-050-A
[Rev.10 from 2021]
2026.03.31 23:22:44 UTC
Installation of the Emergency Generator Line Contactor (EMER GLC)
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 125 | LATERAL AVIONIC COMPARTMENT |
| 812, 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-24-00-710-001-A | Operational Check of Emergency Generating System |
| ESPM 204524 | |
Subtask 24-24-55-860-052-A
A. Aircraft Maintenance Configuration
(1) In the cockpit, on the overhead panel 35VU, make sure that these pushbutton switches are realeased:
(4) Make sure that there is a WARNING NOTICE(S) on the access door 121AL to tell persons not to connect the external power connector.
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE are in position at the access doors 812 and 822.
(6) Make sure that the access doors 812 and 822 are open.
(7) In the avionics compartment, make sure that the access panel (1) from the AC/DC emergency power center 106VU is open.
Subtask 24-24-55-865-051-A (1) In the cockpit, on the overhead panel 35VU, make sure that these pushbutton switches are realeased:
- BAT 1, BAT 2,
- GEN 1(2), APU GEN,
- EXT PWR.
- 21VU (EMER ELEC PWR),
- 35VU (ELEC).
(4) Make sure that there is a WARNING NOTICE(S) on the access door 121AL to tell persons not to connect the external power connector.
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE are in position at the access doors 812 and 822.
(6) Make sure that the access doors 812 and 822 are open.
(7) In the avionics compartment, make sure that the access panel (1) from the AC/DC emergency power center 106VU is open.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/CSM/G /EV AUTO/SPLY | 7XE | C01 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| 122VU | ELEC/CNTOR/ESS/DC BUS/TIE | 3PC | W26 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AC ESS/BUS ON/BUS 2 | 2XC | AC01 |
Subtask 24-24-55-420-050-A
A. Installation of the Contactor
(2) Install the nuts (2) and tighten them.
(3) Install the power supply wires (3).
(4) Install the 6 washers (4) and screws (5). Tighten the screws (5) ESPM 204524.
(5) Connect the wires (6) to the contactor (7).
Subtask 24-24-55-865-052-A CAUTION:
REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU CONNECT THE ELECTRICAL WIRES.
INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
(1) Put the contactor (7) in position. (2) Install the nuts (2) and tighten them.
(3) Install the power supply wires (3).
(4) Install the 6 washers (4) and screws (5). Tighten the screws (5) ESPM 204524.
(5) Connect the wires (6) to the contactor (7).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-24-55-710-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/CSM/G /EV AUTO/SPLY | 7XE | C01 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| 122VU | ELEC/CNTOR/ESS/DC BUS/TIE | 3PC | W26 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AC ESS/BUS ON/BUS 2 | 2XC | AC01 |
Subtask 24-24-55-410-050-A
Contactor