W DOC AIRBUS | AMM A320F

Installation of the Constant Speed Motor/Generator (CSM/G)


TASK 24-24-51-400-001-A
Installation of the Constant Speed Motor/Generator (CSM/G)


WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: DO NOT WALK ON A CLOSED LANDING GEAR DOOR.
CAUTION: USE HIGH-PRESSURE SPRAYING EQUIPMENT FOR SPECIFIED AREAS ONLY. DO NOT USE HIGH-PRESSURE SPRAYING EQUIPMENT TO CLEAN THE AREAS AROUND SENSORS, PROBES, ANTENNAS, ETC. YOU MUST CLEAN THESE AREAS BY HAND. MAKE SURE THAT YOU ADJUST THE HIGH-PRESSURE SPRAYING EQUIPMENT TO, AND USE IT AT, THE SPECIFIED VALUES. IF YOU DO NOT OBEY THESE PRECAUTIONS, YOU CAN CAUSE DAMAGE TO THE SURFACE OR TO PARTS. HIGH-PRESSURE SPRAYING EQUIPMENT CAN PUSH LIQUIDS INTO BEARINGS, JOINTS, PROBES, BRAKES, ELECTRICAL CONNECTORS AND OTHER SEALED COMPONENTS. LIQUIDS THAT GO INTO THESE AREAS CAN FREEZE DURING AIRCRAFT FLIGHT, REMOVE LUBRICANTS, CAUSE CORROSION AND ELECTRICAL FAULTS.
FIN: 8XE
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
STEPLADDER 2.0 M (6.6 FT)
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
No specific
Torque wrench: range to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft ) T
No specific
Torque wrench: range to between 8.3 and 7.5 m.daN (61.21 and 55.31 lbf.ft ) T
 B. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
8
LOCKWASHERS
AIPC 24-24-03-01-110
8
LOCKWASHERS
AIPC 24-24-83-01-110
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-24-00-710-001-A
Operational Check of Emergency Generating System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-10-00-863-003-A
Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-003-A-01
Pressurize the Blue Hydraulic System with the Blue Electric Pump
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 24-24-51-860-052-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the blue hydraulic system is depressurized (Ref. AMM TASK 29-00-00-864-001).
   (2) Make sure that the reservoir of the blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (3) Make sure that the LH and RH Main Landing Gear (MLG) is opened (Ref. AMM TASK 32-12-00-010-001).
   (4) Make sure that the STEPLADDER 2.0 M (6.6 FT) is in position at the MLG bay.
Subtask 24-24-51-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
105VUELEC/CSM/G /EV AUTO/SPLY7XEC01
106VUCSM/G /EV/MAN/SPLY6XEB04
122VUELEC/EMER GEN AUTO/29XEZ26
122VUELEC/EMER GEN AUTO/111XEZ25
4. Procedure
Subtask 24-24-51-420-051-A Subtask 24-24-51-865-055-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
105VUELEC/CSM/G /EV AUTO/SPLY7XEC01
106VUCSM/G /EV/MAN/SPLY6XEB04
122VUELEC/EMER GEN AUTO/29XEZ26
122VUELEC/EMER GEN AUTO/111XEZ25
Subtask 24-24-51-860-051-A
C. Preparation for Test
   (1) Energize the aircraft electrical circuits
(
Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
   (3) Pressurize the Blue Hydraulic System
     (a) Pressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-002).
     (b) Pressurize the Blue hydraulic system either with the electric pump or a ground hydraulic cart (Ref. AMM TASK 29-10-00-863-003).
Subtask 24-24-51-710-051-A
D. Test
   (1) Do the operational test of the Emergency Generation System (Ref. AMM TASK 24-24-00-710-001).
5. Close-up
Subtask 24-24-51-410-052-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the stepladder.
   (3) Close the LH and RH MLG door (Ref. AMM TASK 32-12-00-410-001).
   (4) Put the system back to a serviceable condition
   (5) Remove the warning notices from the cockpit and from the ground service panel of the Blue hydraulic system.
   (6) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 24-24-51-860-053-A
B. Put the aircraft back to its initial configuration.
   (1) De-pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).
   (2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).