Removal of the CSM/G Control Unit
TASK 24-24-34-000-001-A
Removal of the CSM/G Control Unit
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-24-34-860-050-A
Subtask 24-24-34-020-050-A
[Rev.10 from 2021]
2026.03.31 23:22:38 UTC
Removal of the CSM/G Control Unit
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 125 | LATERAL AVIONIC COMPARTMENT |
| 812, 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
Subtask 24-24-34-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) In the cockpit, on the EMER ELEC PWR section of the overhead panel 21VU, put a WARNING NOTICE(S) to tell persons not to operate the pushbutton switches.
Subtask 24-24-34-010-050-A (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) In the cockpit, on the EMER ELEC PWR section of the overhead panel 21VU, put a WARNING NOTICE(S) to tell persons not to operate the pushbutton switches.
B. Get access to the avionics compartment.
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812 and 822 of the avionics compartment.
(2) Open the access doors 812 and 822.
Subtask 24-24-34-865-050-A (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812 and 822 of the avionics compartment.
(2) Open the access doors 812 and 822.
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/CSM/G /EV AUTO/SPLY | 7XE | C01 |
| 106VU | CSM/G /EV/MAN/SPLY | 6XE | B04 |
Subtask 24-24-34-020-050-A
A. Removal of the GCU
(1) Disconnect the electrical connector (4).
(2) Loosen the 4 screws (3).
(3) Hold the CSM/G control unit (1).
(4) Remove the screws (3) and the washers (2).
(5) Remove the CSM/G control unit (1).
(6) Put CAP - BLANKING on the electrical connector (4) and the electrical receptacle (5).
(1) Disconnect the electrical connector (4).
(2) Loosen the 4 screws (3).
(3) Hold the CSM/G control unit (1).
(4) Remove the screws (3) and the washers (2).
(5) Remove the CSM/G control unit (1).
(6) Put CAP - BLANKING on the electrical connector (4) and the electrical receptacle (5).
CSM/G Control Unit