1. Reason for the Job
Refer to the MPD TASK: 242400-02
OPERATIONAL CHECK OF EMERGENCY GCU VIA CFDS
Make sure that the protection modules (overvoltage, undervoltage, overfrequency, underfrequency) of the emergency GCU operate correctly, with the CFDS.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
812, 822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-32-00-860-004-A
Procedure to Get Access to the SYSTEM REPORT/TEST/ELEC Page
3. Job Set-up
Subtask 24-24-00-010-052-A
A. Get access to the avionics compartment.
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812 and 822 of the avionics compartments.
   (2) Open the access doors 812 and 822.
Subtask 24-24-00-865-056-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
105VUELEC/CSM/G /EV AUTO/SPLY7XEC01
106VUCSM/G /EV/MAN/SPLY6XEB04
Subtask 24-24-00-860-052-A
C. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Do the procedure to get the SYSTEM REPORT/TEST ELEC page. (Ref. AMM TASK 31-32-00-860-004).
4. Procedure
Subtask 24-24-00-710-051-A
A. Operational Test of the GCU EMER from the CFDS
ACTION
RESULT
1.On the MCDU, on the SYSTEM REPORT/TEST ELEC page:
  • push the line key adjacent to the GCU EMER indication.
On the MCDU:
  • the GCU EMER page comes into view.
2.On the MCDU, on the GCU EMER page:
  • push the line key adjacent to the TEST indication.
On the MCDU, on the GCU EMER page:
  • the TEST OK message comes into view.

On the CSM/G GCU:
  • the red LED goes off after 10 seconds.
5. Close-up
Subtask 24-24-00-860-053-A
A. Put the aircraft back to its initial configuration.
   (1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
   (2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 24-24-00-410-052-A
B. Close Access
   (1) Close the access doors 812 and 822.
   (2) Remove the access platform(s).