Installation of the APU Generator with the Minilift Hoist
TASK 24-23-51-400-001-A-01
Installation of the APU Generator with the Minilift Hoist
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 24-23-51-860-057-A
Subtask 24-23-51-420-055-B
Subtask 24-23-51-410-058-A
[Rev.10 from 2021]
2026.03.31 23:22:32 UTC
Installation of the APU Generator with the Minilift Hoist
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 8XS
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 0.480 and 0.370 m.daN (42.48 and 32.74 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 0.47 and 0.43 m.daN (41.6 and 38.1 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 2.5 and 2.3 m.daN (18.44 and 16.96 lbf.ft ) ![]() | |
| No specific | Torque wrench: range to between 3.3 and 2.6 m.daN (24.34 and 19.17 lbf.ft ) ![]() | |
| No specific | Torque wrench: range to between 3.25 and 2.95 m.daN (23.97 and 21.76 lbf.ft ) ![]() | |
| No specific | Torque wrench: range to between 4.4 and 3.9 m.daN (32.45 and 28.76 lbf.ft ) ![]() | |
| A1-91-265 | 1 | HOIST-MINILIFT |
| FRDH141 | 2 | ADAPTER-TORQUE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03ABA1) | Synthetic base Lubricating Oil-Turbine Engine - - |
| (Material No.03ABB1) | Synthetic base Lubricating Oil-Turbine Engine Low Temp. - |
| (Material No.04SAB2) | Varnish Polyurethane-- Marking Structure |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| No specific | 22swg (0.71 mm (0.028 in) dia) chromium nickel wire |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 7 | SEAL PLATE | AIPC 24-23-04-01-040 |
| 9 | O-RING | AIPC 24-23-51-01-010 |
| 10 | O-RING | AIPC 24-23-51-01-020 |
| 13 | WASHER | AIPC 24-23-51-01-040 |
| 19 | NUTS AND CAPTIVE WASHERS | AIPC 24-23-51-01-080 |
| 7 | SEAL PLATE | AIPC 24-23-84-01-040 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 49-00-00-860-005-A | APU Start by External Power |
| TASK 49-00-00-860-005-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-006-A | APU Shutdown by External Power |
| TASK 49-00-00-860-006-A-01 | APU Shutdown by Batteries |
| TASK 49-00-00-860-008-A | APU Start by External Power |
| TASK 49-00-00-860-008-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 49-90-00-600-004-A | Check Oil Level and Replenish (APS 3200) |
| TASK 49-90-00-600-007-A | Check Oil Level and Replenish (131-9(A)) |
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
Subtask 24-23-51-860-057-A
A. Aircraft Maintenance Configuration
(1) On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.
(2) Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
(3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that ground fire extinguishing equipment is available.
(5) Make sure that the access platform is in position below the APU compartment.
(6) Make sure that the APU access doors are open (Ref. AMM TASK 52-41-00-010-001).
(7) Make sure that the A1-91-265 HOIST-MINILIFT (33) is installed correctly in the APU generator hoist bracket.
4. Procedure(1) On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.
(2) Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
(3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that ground fire extinguishing equipment is available.
(5) Make sure that the access platform is in position below the APU compartment.
(6) Make sure that the APU access doors are open (Ref. AMM TASK 52-41-00-010-001).
(7) Make sure that the A1-91-265 HOIST-MINILIFT (33) is installed correctly in the APU generator hoist bracket.
Subtask 24-23-51-420-055-B
A. Installation of the APU Generator (type 5913667 or type BA03604)
(2) Replace the AIPC 24-23-04-01-040 SEAL PLATE (7) or AIPC 24-23-84-01-040 SEAL PLATE (7) if you find:
(b) Lubricate the seals (8) and (11) of the new seal plate (7) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(c) Put the seal plate (7) on the flange of the APU generator (4).
(d) Make sure that the dowel pin (3) engages correctly with the pilot hole (2).
(e) Lubricate the countersunk screws (1) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(f) Install the countersunk screws (1) to the generator flange and TORQUE to between 0.47 and 0.43 m.daN (41.6 and 38.1 lbf.in )
.
(3) Lubricate the new AIPC 24-23-51-01-020 O-RING (10) and the new AIPC 24-23-51-01-010 O-RING (9) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(4) Install the O-ring (10) on the generator splined drive-shaft (6).
(5) Install the O-ring (9) on the generator mount flange (5).
(6) Remove the lifting eye (31) from the A1-91-265 HOIST-MINILIFT (33) and install it to the lifting boss of the APU generator (4).
(7) Make sure that the threads of the lifting eye (31) and the generator lifting boss are in a good condition.
(8) Lubricate the thread of the lifting eye (31) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(9) Install the shackle with the quick-release pin (32) to the lifting eye (31).
(10) Operate the A1-91-265 HOIST-MINILIFT (33) and lift the APU generator (4) in position to the generator mounting flange.
(11) Lubricate the generator splined drive-shaft (6) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(12) Install the APU generator (4) in its position and turn it clockwise to engage the slots.
(13) Make sure that the dowel pin (3) fully engages in the mounting flange of the accessory drive gearbox.
(14) TORQUE the nuts (15)
(16) Clean the nuts (15) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(17) Make a mark on the nuts (15) with Varnish Polyurethane-- Marking Structure (Material No.04SAB2) .
(18) Install the spacer (27), the clamp (26), the washer (25) and the screw (24).
(19) TORQUE the screw (24) to between 0.480 and 0.370 m.daN (42.48 and 32.74 lbf.in )
.
(20) Remove the CAP-BLANKING from each electrical connector and receptacle.
(21) Connect the electrical connector (12) to the APU generator (4).
(22) Make sure that you connect the electrical cable connections correctly to the APU generator terminal.
(23) Install the washers (23) and the terminal forks (22) on the APU generator (4).
(26) Install the washers (20) and the nuts and captive washers (19).
(27) TORQUE the nuts and captive washers (19) to between 2.5 and 2.3 m.daN (18.44 and 16.96 lbf.ft )
.
(28) Install the cover plate (18) with the washers (16) and the screws (17).
(29) TORQUE the screws (17) to between 0.47 and 0.43 m.daN (41.6 and 38.1 lbf.in )
.
(30) Install the drain plug (14) with the new AIPC 24-23-51-01-040 WASHER (13).
.
Subtask 24-23-51-420-057-B WARNING:
OBEY THE HOISTING SAFETY PROCEDURES.
MAKE SURE THAT THE HOIST IS ASSEMBLED AND ATTACHED CORRECTLY BEFORE YOU PUT A LOAD ON IT. OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE HOIST.
IF THE HOIST IS IN AN INCORRECT CONDITION THE LOAD CAN MOVE ACCIDENTALLY AND KILL PERSONS OR CAUSE INJURY.
WARNING:
DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU REMOVE OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
(1) Examine the seal plate (7) and the seals (8) and (11), which are part of the seal plate (7). (2) Replace the AIPC 24-23-04-01-040 SEAL PLATE (7) or AIPC 24-23-84-01-040 SEAL PLATE (7) if you find:
- Breaks and/or scratches on the seal plate (7),
- Cuts on the seals (8) and/or (11),
- The height of the seals (8) and/or (11) above the seal plate (7) is less than 0.25 mm (0.0098 in.).
(b) Lubricate the seals (8) and (11) of the new seal plate (7) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(c) Put the seal plate (7) on the flange of the APU generator (4).
(d) Make sure that the dowel pin (3) engages correctly with the pilot hole (2).
(e) Lubricate the countersunk screws (1) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(f) Install the countersunk screws (1) to the generator flange and TORQUE to between 0.47 and 0.43 m.daN (41.6 and 38.1 lbf.in )
. (3) Lubricate the new AIPC 24-23-51-01-020 O-RING (10) and the new AIPC 24-23-51-01-010 O-RING (9) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(4) Install the O-ring (10) on the generator splined drive-shaft (6).
(5) Install the O-ring (9) on the generator mount flange (5).
(6) Remove the lifting eye (31) from the A1-91-265 HOIST-MINILIFT (33) and install it to the lifting boss of the APU generator (4).
(7) Make sure that the threads of the lifting eye (31) and the generator lifting boss are in a good condition.
(8) Lubricate the thread of the lifting eye (31) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(9) Install the shackle with the quick-release pin (32) to the lifting eye (31).
(10) Operate the A1-91-265 HOIST-MINILIFT (33) and lift the APU generator (4) in position to the generator mounting flange.
(11) Lubricate the generator splined drive-shaft (6) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(12) Install the APU generator (4) in its position and turn it clockwise to engage the slots.
(13) Make sure that the dowel pin (3) fully engages in the mounting flange of the accessory drive gearbox.
(14) TORQUE the nuts (15)
- P/N NAS1291C6M to between 3.3 and 2.6 m.daN (24.34 and 19.17 lbf.ft )

- P/N MS21043-6 to between 4.4 and 3.9 m.daN (32.45 and 28.76 lbf.ft )
.
(16) Clean the nuts (15) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(17) Make a mark on the nuts (15) with Varnish Polyurethane-- Marking Structure (Material No.04SAB2) .
(18) Install the spacer (27), the clamp (26), the washer (25) and the screw (24).
(19) TORQUE the screw (24) to between 0.480 and 0.370 m.daN (42.48 and 32.74 lbf.in )
.(20) Remove the CAP-BLANKING from each electrical connector and receptacle.
(21) Connect the electrical connector (12) to the APU generator (4).
(22) Make sure that you connect the electrical cable connections correctly to the APU generator terminal.
(23) Install the washers (23) and the terminal forks (22) on the APU generator (4).
CAUTION:
MAKE SURE THAT THE WASHER IS INSTALLED BETWEEN THE PHASE LEADS AND THE TERMINAL BLOCK. IF NOT, THE TERMINAL BLOCK WILL BURN LOCALLY BECAUSE OF RESISTANCE HEATING.
(24) Connect the electrical cables (21) as follows: - Cable 8XS-T1 to generator terminal T1,
- Cable 8XS-T2 to generator terminal T2,
- Cable 8XS-T3 to generator terminal T3, and
- Cable 8XS- N to generator terminal N.
(26) Install the washers (20) and the nuts and captive washers (19).
(27) TORQUE the nuts and captive washers (19) to between 2.5 and 2.3 m.daN (18.44 and 16.96 lbf.ft )
. (28) Install the cover plate (18) with the washers (16) and the screws (17).
(29) TORQUE the screws (17) to between 0.47 and 0.43 m.daN (41.6 and 38.1 lbf.in )
. (30) Install the drain plug (14) with the new AIPC 24-23-51-01-040 WASHER (13).
NOTE: The drain plug (14) has no inscription on the head.
(a) TORQUE the drain plug (14) to between 3.25 and 2.95 m.daN (23.97 and 21.76 lbf.ft )
. WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(b) Safety the drain plug (14): - Safety the drain plug (14) with 22swg (0.71 mm (0.028 in) dia) chromium nickel wire.
B. Installation of the APU Generator (type BA16501)
(2) Replace the AIPC 24-23-04-01-040 SEAL PLATE (7) if you find:
(b) Lubricate the seals (8) and (11) of the new seal plate (7) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(c) Put the seal plate (7) on the flange of the APU generator (4).
(d) Make sure that the dowel pin (3) engages correctly with the pilot hole (2).
(e) Lubricate the countersunk screws (1) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(f) Install the countersunk screws (1) to the generator flange and TORQUE to between 0.47 and 0.43 m.daN (41.59 and 38.05 lbf.in )
.
(3) Lubricate the new AIPC 24-23-51-01-020 O-RING (10) and the new AIPC 24-23-51-01-010 O-RING (9) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(4) Install the O-ring (10) on the generator splined drive-shaft (6).
(5) Install the O-ring (9) on the generator mount flange (5).
(6) Remove the lifting eye (31) from the A1-91-265 HOIST-MINILIFT (33) and install it to the lifting boss of the APU generator (4).
(7) Make sure that the threads of the lifting eye (31) and the generator lifting boss are in a good condition.
(8) Lubricate the thread of the lifting eye (31) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(9) Install the shackle with the quick-release pin (32) to the lifting eye (31).
(10) Operate the A1-91-265 HOIST-MINILIFT (33) and lift the APU generator (4) in position to the generator mounting flange.
(11) Lubricate the generator splined drive-shaft (6) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(12) Install the APU generator (4) in its position and turn it clockwise to engage the slots.
(13) Make sure that the dowel pin (3) fully engages in the mounting flange of the accessory drive gearbox.
(14) TORQUE the nuts (15)
(16) Clean the nuts (15) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(17) Make a mark on the nuts (15) with Varnish Polyurethane-- Marking Structure (Material No.04SAB2) .
(18) Install the spacer (27), the clamp (26), the washer (25) and the screw (24).
(19) TORQUE the screw (24) to between 0.480 and 0.370 m.daN (42.48 and 32.74 lbf.in )
.
(20) Remove the CAP-BLANKING from each electrical connector and receptacle.
(21) Connect the electrical connector (12) to the APU generator (4).
(22) Make sure that you connect the electrical cable connections correctly to the APU generator terminal.
(23) Install the washers (23) and the terminal forks (22) on the APU generator (4).
(26) TORQUE the nuts and captive washers (19) to between 2.5 and 2.3 m.daN (18.44 and 16.96 lbf.ft )
.
(27) Install the cover plate (18) with the washers (16) and the screws (17).
(28) TORQUE the screws (17) to between 0.47 and 0.43 m.daN (41.59 and 38.05 lbf.in )
.
(29) Install the drain plug (14) with the new AIPC 24-23-51-01-040 WASHER (13).
.
Subtask 24-23-51-210-064-A WARNING:
OBEY THE HOISTING SAFETY PROCEDURES.
MAKE SURE THAT THE HOIST IS ASSEMBLED AND ATTACHED CORRECTLY BEFORE YOU PUT A LOAD ON IT. OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE HOIST.
IF THE HOIST IS IN AN INCORRECT CONDITION THE LOAD CAN MOVE ACCIDENTALLY AND KILL PERSONS OR CAUSE INJURY.
WARNING:
DO NOT CAUSE DAMAGE TO THE THREADS OF THE SET SCREWS WHEN YOU REMOVE OR INSTALL THE GENERATOR.
THE GENERATOR WEIGHS APPROXIMATELY 23kg (50.7lb).
(1) Examine the seal plate (7) and the seals (8) and (11), which are part of the seal plate (7). (2) Replace the AIPC 24-23-04-01-040 SEAL PLATE (7) if you find:
- Breaks and/or scratches on the seal plate (7),
- Cuts on the seals (8) and/or (11),
- The height of the seals (8) and/or (11) above the seal plate (7) is less than 0.25 mm (0.0098 in.).
(b) Lubricate the seals (8) and (11) of the new seal plate (7) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(c) Put the seal plate (7) on the flange of the APU generator (4).
(d) Make sure that the dowel pin (3) engages correctly with the pilot hole (2).
(e) Lubricate the countersunk screws (1) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(f) Install the countersunk screws (1) to the generator flange and TORQUE to between 0.47 and 0.43 m.daN (41.59 and 38.05 lbf.in )
.(3) Lubricate the new AIPC 24-23-51-01-020 O-RING (10) and the new AIPC 24-23-51-01-010 O-RING (9) with a thin layer of Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(4) Install the O-ring (10) on the generator splined drive-shaft (6).
(5) Install the O-ring (9) on the generator mount flange (5).
(6) Remove the lifting eye (31) from the A1-91-265 HOIST-MINILIFT (33) and install it to the lifting boss of the APU generator (4).
(7) Make sure that the threads of the lifting eye (31) and the generator lifting boss are in a good condition.
(8) Lubricate the thread of the lifting eye (31) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(9) Install the shackle with the quick-release pin (32) to the lifting eye (31).
(10) Operate the A1-91-265 HOIST-MINILIFT (33) and lift the APU generator (4) in position to the generator mounting flange.
(11) Lubricate the generator splined drive-shaft (6) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) or Synthetic base Lubricating Oil-Turbine Engine Low Temp. - (Material No.03ABB1) .
(12) Install the APU generator (4) in its position and turn it clockwise to engage the slots.
(13) Make sure that the dowel pin (3) fully engages in the mounting flange of the accessory drive gearbox.
(14) TORQUE the nuts (15)
- P/N NAS1291C6M to between 3.3 and 2.6 m.daN (24.34 and 19.17 lbf.ft )

- P/N MS21043-6 to between 4.4 and 3.9 m.daN (32.45 and 28.76 lbf.ft )
.
(16) Clean the nuts (15) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(17) Make a mark on the nuts (15) with Varnish Polyurethane-- Marking Structure (Material No.04SAB2) .
(18) Install the spacer (27), the clamp (26), the washer (25) and the screw (24).
(19) TORQUE the screw (24) to between 0.480 and 0.370 m.daN (42.48 and 32.74 lbf.in )
. (20) Remove the CAP-BLANKING from each electrical connector and receptacle.
(21) Connect the electrical connector (12) to the APU generator (4).
(22) Make sure that you connect the electrical cable connections correctly to the APU generator terminal.
(23) Install the washers (23) and the terminal forks (22) on the APU generator (4).
CAUTION:
MAKE SURE THAT THE WASHER IS INSTALLED BETWEEN THE PHASE LEADS AND THE TERMINAL BLOCK. IF NOT, THE TERMINAL BLOCK WILL BURN LOCALLY BECAUSE OF RESISTANCE HEATING.
(24) Connect the electrical cables (21) as follows: - Cable 8XS-T1 to generator terminal T1,
- Cable 8XS-T2 to generator terminal T2,
- Cable 8XS-T3 to generator terminal T3, and
- Cable 8XS- N to generator terminal N.
(26) TORQUE the nuts and captive washers (19) to between 2.5 and 2.3 m.daN (18.44 and 16.96 lbf.ft )
. (27) Install the cover plate (18) with the washers (16) and the screws (17).
(28) TORQUE the screws (17) to between 0.47 and 0.43 m.daN (41.59 and 38.05 lbf.in )
. (29) Install the drain plug (14) with the new AIPC 24-23-51-01-040 WASHER (13).
NOTE: The drain plug (14) has the inscription "OIL DRAIN" on the head.
(a) TORQUE the drain plug (14) to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in )
. C. Visual Check
Subtask 24-23-51-865-063-A CAUTION:
USE ONLY APPROVED TYPES/BRANDS OF LUBRICANTS. DO NOT MIX TYPES//BRANDS OF LUBRICANTS.
(1) Do a visual check of the oil quantity on the APU oil level. Add oil if the oil level is on or less than the ADD mark on the sight glass - for APU GTCP 36-300
(Ref. AMM D/O 49-90-00-60) - for APU APS 3200
(Ref. AMM TASK 49-90-00-600-004) - for APU 131-9(A)
(Ref. AMM TASK 49-90-00-600-007)
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-23-51-710-056-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
E. Start and Operate the APU
(1) Start the APU
(3) Check at 95 % speed of the APU that the generator energizes and begins to indicate voltage and frequency (without the selection of electrical loads).
(4) An 'AVAIL' message on top of the APU page shows that you can select an electric/pneumatic load.
(5) Shutdown the APU
(7) Do a leak check of the APU Oil System.
5. Close-up(1) Start the APU
- for APU GTCP 36-300
(Ref. AMM D/O 49-00-00-86) - for APU APS 3200
(Ref. AMM TASK 49-00-00-860-005) - for APU 131-9(A)
(Ref. AMM TASK 49-00-00-860-008)
(3) Check at 95 % speed of the APU that the generator energizes and begins to indicate voltage and frequency (without the selection of electrical loads).
(4) An 'AVAIL' message on top of the APU page shows that you can select an electric/pneumatic load.
(5) Shutdown the APU
- for APU GTCP 36-300
(Ref. AMM D/O 49-00-00-86) - for APU APS 3200
(Ref. AMM TASK 49-00-00-860-006) - for APU 131-9(A)
(Ref. AMM TASK 49-00-00-860-009)
(7) Do a leak check of the APU Oil System.
NOTE: No leaks are permitted.
Subtask 24-23-51-410-058-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the APU access doors 315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
APU Generator 8XS (type 5913667 or type BA03604)