Installation of the AC Current Transformers
TASK 24-22-17-400-002-A
Installation of the AC Current Transformers
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-22-17-010-060-A ** ON A/C NOT FOR ALL
Subtask 24-22-17-420-055-A
Subtask 24-22-17-410-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:22:01 UTC
Installation of the AC Current Transformers
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121AL, 825AR | |
| 131MC, 131NC, 131PC | |
| 131AC, 131BC, 131CC |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-740-002-B | Operational Check of the GAPCU via the CFDS |
| TASK 24-41-00-740-004-A | Operational Check of the GPCU via the CFDS |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-54-12-000-002-A | Removal of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-002-A | Installation of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 24-22-17-010-060-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Make sure that the cargo-compartment door 825AR is open (Ref. AMM TASK 52-30-00-860-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the cargo-compartment door 825AR.
(3) In the zone 131, make sure that the ceiling panels 131AC 131BC 131CC are removed (Ref. AMM TASK 25-54-12-000-002).
Subtask 24-22-17-010-060-C ** ON A/C NOT FOR ALL (1) Make sure that the cargo-compartment door 825AR is open (Ref. AMM TASK 52-30-00-860-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the cargo-compartment door 825AR.
(3) In the zone 131, make sure that the ceiling panels 131AC 131BC 131CC are removed (Ref. AMM TASK 25-54-12-000-002).
A. Get Access
(1) Make sure that the cargo-compartment door 825AR is open (Ref. AMM TASK 52-30-00-860-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the cargo-compartment door 825AR.
(3) In the zone 130, make sure that the ceiling panels 131MC 131NC 131PC are removed (Ref. AMM TASK 25-54-12-000-002).
Subtask 24-22-17-860-064-A (1) Make sure that the cargo-compartment door 825AR is open (Ref. AMM TASK 52-30-00-860-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the cargo-compartment door 825AR.
(3) In the zone 130, make sure that the ceiling panels 131MC 131NC 131PC are removed (Ref. AMM TASK 25-54-12-000-002).
B. Aircraft Maintenance Configuration
(1) Make sure that the external power connector is not connected to the aircraft EXT PWR receptacle.
(2) Make sure that a WARNING NOTICE(S) is (are) in position on the access door 121AL to tell persons not to connect the external power connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these pushbutton switches are released:
4. Procedure(1) Make sure that the external power connector is not connected to the aircraft EXT PWR receptacle.
(2) Make sure that a WARNING NOTICE(S) is (are) in position on the access door 121AL to tell persons not to connect the external power connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these pushbutton switches are released:
- BAT1, BAT2,
- APU GEN,
- GEN1, GEN2,
- EXT PWR.
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-22-17-420-055-A
A. Installation of the AC Current Transformer
(1) Put the disconnected cables (3) and (4) through the current transformer (10).
(3) Install the washers (9) and the screws (8) on the current transformer (10) and tighten them.
(4) Remove the blanking caps from the electrical connectors.
(5) Make sure that the electrical connectors are clean and in the correct condition.
(6) Connect the electrical connector (11) to the current transformer (10).
(7) Install the cables (3) and (4), the washers (2) and the nuts (1) on the studs of the terminal block (5) and tighten them.
(9) Tighten the screws (6).
Subtask 24-22-17-860-065-A (1) Put the disconnected cables (3) and (4) through the current transformer (10).
NOTE: Make sure that the location of the cables agrees with that you recorded at the removal.
(2) Move the current transformer (10) along the cables. (3) Install the washers (9) and the screws (8) on the current transformer (10) and tighten them.
(4) Remove the blanking caps from the electrical connectors.
(5) Make sure that the electrical connectors are clean and in the correct condition.
(6) Connect the electrical connector (11) to the current transformer (10).
(7) Install the cables (3) and (4), the washers (2) and the nuts (1) on the studs of the terminal block (5) and tighten them.
NOTE: Make sure that the location of the cables agrees with that you recorded at the removal.
(8) Install the cover (7) and the screws (6) on the terminal block (5). (9) Tighten the screws (6).
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits from the engine 1(2) (Ref. AMM TASK 24-41-00-861-002).
Subtask 24-22-17-865-052-A (1) Energize the aircraft electrical circuits from the engine 1(2) (Ref. AMM TASK 24-41-00-861-002).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 24-22-17-710-054-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| ** ON A/C ALL | |||
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | FWD GALLEY/FEEDER D | 2MC | AE02 |
D. Operational Test
(1) Do the operational test that follows:
Subtask 24-22-17-710-054-C ** ON A/C NOT FOR ALL (1) Do the operational test that follows:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM display unit:
|
2.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
3.In the FWD and/or AFT galleys:
| On the lower ECAM display unit:
|
4.On the MCDU:
| On the MCDU, on the "AC GEN" page:
|
D. Operational Test
(1) Do the operational test that follows:
Subtask 24-22-17-860-066-A (1) Do the operational test that follows:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM display unit:
|
2.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
3.In the FWD and/or AFT galleys:
| On the lower ECAM display unit:
|
4.On the MCDU:
| On the MCDU, on the "AC GEN" page:
|
E. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits supplied from the engine 1(2) (Ref. AMM TASK 24-41-00-862-002).
5. Close-up(1) De-energize the aircraft electrical circuits supplied from the engine 1(2) (Ref. AMM TASK 24-41-00-862-002).
Subtask 24-22-17-410-055-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) In the zone 131, install the ceiling panels 131AC 131BC 131CC (Ref. AMM TASK 25-54-12-400-002).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(5) Close the access door 825AR (Ref. AMM TASK 52-30-00-860-002).
Subtask 24-22-17-410-055-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) In the zone 131, install the ceiling panels 131AC 131BC 131CC (Ref. AMM TASK 25-54-12-400-002).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(5) Close the access door 825AR (Ref. AMM TASK 52-30-00-860-002).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) In the zone 130, install the ceiling panels 131MC 131NC 131PC (Ref. AMM TASK 25-54-12-400-002).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(5) Close the access door 825AR (Ref. AMM TASK 52-30-00-860-002).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) In the zone 130, install the ceiling panels 131MC 131NC 131PC (Ref. AMM TASK 25-54-12-400-002).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(5) Close the access door 825AR (Ref. AMM TASK 52-30-00-860-002).
AC Current Transformer (41XU1, 41XU2)