3. Job Set-up
Subtask 24-22-17-010-053-A ** ON A/C NOT FOR ALL
Subtask 24-22-17-420-051-A ** ON A/C NOT FOR ALL
Subtask 24-22-17-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:21:59 UTC
Installation of the AC Current Transformers
WARNING:
MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS.
THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
ZONE: 131
ZONE: 133
ZONE: 212
FIN: 42XU1 ** ON A/C NOT FOR ALL
FIN: 42XU2 ** ON A/C NOT FOR ALL
FIN: 42XU3 ** ON A/C NOT FOR ALL
FIN: 42XU4 ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 133
ZONE: 212
FIN: 42XU1 ** ON A/C NOT FOR ALL
FIN: 42XU2 ** ON A/C NOT FOR ALL
FIN: 42XU3 ** ON A/C NOT FOR ALL
FIN: 42XU4 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| FOR [42XU1] (CT-AC, 1) | ||
| No specific | Torque wrench: range to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in ) ![]() | |
| FOR [42XU1] (CT-AC, 1) | ||
| FOR [42XU2] (CT-AC, 2) | ||
| FOR [42XU3] (CT-AC, 1) | ||
| FOR [42XU4] (CT-AC, 2) | ||
| No specific | AR | WARNING NOTICE(S) |
| FOR [42XU2] (CT-AC, 2) | ||
| No specific | Torque wrench: range to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in ) ![]() | |
| FOR [42XU3] (CT-AC, 1) | ||
| No specific | AR | TIE WRAP |
| No specific | Torque wrench: range to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.1 and 0.90 m.daN (97.35 and 79.65 lbf.in ) ![]() | |
| FOR [42XU4] (CT-AC, 2) | ||
| No specific | AR | TIE WRAP |
| No specific | Torque wrench: range to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.1 and 0.90 m.daN (97.35 and 79.65 lbf.in ) ![]() | |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 131 | FORWARD CARGO COMPARTMENT |
| 133 | BAY UNDER FWD CAR COMPT FLOOR |
| 212 | COCKPIT |
| 121AL | |
| FOR [42XU1] (CT-AC, 1) | |
| FOR [42XU2] (CT-AC, 2) | |
| FOR [42XU3] (CT-AC, 1) | |
| FOR [42XU4] (CT-AC, 2) | |
| 121AL | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-740-002-B | Operational Check of the GAPCU via the CFDS |
| TASK 24-41-00-740-004-A | Operational Check of the GPCU via the CFDS |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-11-41-000-001-A | Removal of the Third Occupant Seat |
| TASK 25-11-41-400-001-A | Installation of the Third Occupant Seat |
| FOR [42XU1] (CT-AC, 1) | |
| TASK 24-22-55-400-002-A | Installation of the Contactors |
| TASK 24-23-55-400-001-A | Installation of the APU GLC |
| FOR [42XU1] (CT-AC, 1) | |
| FOR [42XU2] (CT-AC, 2) | |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| FOR [42XU1] (CT-AC, 1) | |
| FOR [42XU2] (CT-AC, 2) | |
| FOR [42XU3] (CT-AC, 1) | |
| FOR [42XU4] (CT-AC, 2) | |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| FOR [42XU2] (CT-AC, 2) | |
| TASK 24-22-55-400-002-A | Installation of the Contactors |
| TASK 24-23-55-400-001-A | Installation of the APU GLC |
| FOR [42XU3] (CT-AC, 1) | |
| TASK 21-26-00-710-002-A | Operational Check of Override Function (BLOWER and EXTRACT) |
| TASK 24-22-55-400-002-A | Installation of the Contactors |
| TASK 24-24-00-710-001-A | Operational Check of Emergency Generating System |
| TASK 24-26-00-710-002-A | Operational Check of the Manual and Automatic Galley and Bus Shedding |
| TASK 24-32-00-710-001-A | Operational Test of the DC Generation Switching |
| TASK 28-21-00-710-001-A | Operational Test of the Wing-Tank Fuel Control |
| TASK 29-12-00-710-001-A | Functional Check of Blue Electrical Pump Pressure by Reading ECAM Indication |
| TASK 29-31-00-710-001-A | Functional Check of Reservoir Low Level Warning |
| TASK 30-31-00-710-001-A | Operational Test of the Probe Ice Protection |
| TASK 30-42-00-710-001-A | Operational Test of the Windshield Anti-Icing and Defogging |
| TASK 33-25-00-710-001-A | Operational Test of the Passenger Reading Light System |
| TASK 33-51-00-710-001-A | Operational Check of Emergency Power Supply Units by BITE-Check |
| FOR [42XU4] (CT-AC, 2) | |
| TASK 21-26-00-710-002-A | Operational Check of Override Function (BLOWER and EXTRACT) |
| TASK 24-22-55-400-002-A | Installation of the Contactors |
| TASK 24-24-00-710-001-A | Operational Check of Emergency Generating System |
| TASK 24-26-00-710-002-A | Operational Check of the Manual and Automatic Galley and Bus Shedding |
| TASK 24-32-00-710-001-A | Operational Test of the DC Generation Switching |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 28-21-00-710-001-A | Operational Test of the Wing-Tank Fuel Control |
| TASK 30-31-00-710-001-A | Operational Test of the Probe Ice Protection |
| TASK 30-42-00-710-001-A | Operational Test of the Windshield Anti-Icing and Defogging |
| TASK 33-21-00-710-001-A | Operational Test of the General Illumination |
| TASK 33-25-00-710-001-A | Operational Test of the Passenger Reading Light System |
| TASK 34-11-00-710-001-A | Test of the Monitoring of the ADR/AOA 26VAC Power Supply |
Subtask 24-22-17-010-053-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Make sure that the Third Occupant seat is removed (Ref. AMM TASK 25-11-41-000-001).
(2) On the left lower side of the rear panel 120VU, make sure that the access door (4) is removed.
(3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position at the access door 121AL.
(4) Make sure that the access door 121AL is open.
Subtask 24-22-17-860-050-A ** ON A/C NOT FOR ALL (1) Make sure that the Third Occupant seat is removed (Ref. AMM TASK 25-11-41-000-001).
(2) On the left lower side of the rear panel 120VU, make sure that the access door (4) is removed.
(3) Make sure that the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE is in position at the access door 121AL.
(4) Make sure that the access door 121AL is open.
B. Aircraft Maintenance Configuration
(1) Make sure that the external power connector is not connected to the aircraft EXT PWR receptacle.
(2) FOR [42XU1] (CT-AC, 1), [42XU2] (CT-AC, 2), [42XU3] (CT-AC, 1), [42XU4] (CT-AC, 2)
(a) Make sure that the WARNING NOTICE(S) is (are) in position on the access door 121AL to tell persons not to connect the external power connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these pushbutton switches are released:
4. Procedure(1) Make sure that the external power connector is not connected to the aircraft EXT PWR receptacle.
(2) FOR [42XU1] (CT-AC, 1), [42XU2] (CT-AC, 2), [42XU3] (CT-AC, 1), [42XU4] (CT-AC, 2)
(a) Make sure that the WARNING NOTICE(S) is (are) in position on the access door 121AL to tell persons not to connect the external power connector to the aircraft EXT PWR receptacle.
(3) In the cockpit, on the ELEC panel 35VU, make sure that these pushbutton switches are released:
- BAT1, BAT2,
- APU GEN,
- GEN1, GEN2,
- EXT PWR.
- 21VU (EMER ELEC PWR section),
- 25VU (APU section),
- 35VU (ELEC).
Subtask 24-22-17-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the AC Current Transformer
(1) FOR [42XU1] (CT-AC, 1)
(a) Install the AC current transformer 1 (5) in correct position.
(b) Install the four washers (7) and screws (6) on the AC current transformer 1 (5) and tighten them.
(c) Remove the blanking cap from the electrical connector (8).
1 Make sure that the electrical connector (8) and electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 1 (5).
(d) Connect the bars (3) to the contactor bases.
1 Install the six washers (2) and nuts (1) on the contactor bases and tighten them.
2 TORQUE the six nuts to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
.
(e) Install the BTC1 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
(2) FOR [42XU2] (CT-AC, 2)
(a) Install the AC current transformer 2 (5) in correct position.
(b) Install the four washers (7) and screws (6) on the AC current transformer 2 (5) and tighten them.
(c) Remove the blanking cap from the electrical connector (8).
1 Make sure that the electrical connector (8) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 2 (5).
(d) Connect the bars (3) to the contactor bases.
1 Install the six washers (2) and nuts (1) on the contactor bases and tighten them.
2 TORQUE the six nuts to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
.
(e) Install the BTC2 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
Subtask 24-22-17-420-052-A ** ON A/C NOT FOR ALL (1) FOR [42XU1] (CT-AC, 1)
(a) Install the AC current transformer 1 (5) in correct position.
(b) Install the four washers (7) and screws (6) on the AC current transformer 1 (5) and tighten them.
(c) Remove the blanking cap from the electrical connector (8).
1 Make sure that the electrical connector (8) and electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 1 (5).
(d) Connect the bars (3) to the contactor bases.
1 Install the six washers (2) and nuts (1) on the contactor bases and tighten them.
2 TORQUE the six nuts to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
. (e) Install the BTC1 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
(2) FOR [42XU2] (CT-AC, 2)
(a) Install the AC current transformer 2 (5) in correct position.
(b) Install the four washers (7) and screws (6) on the AC current transformer 2 (5) and tighten them.
(c) Remove the blanking cap from the electrical connector (8).
1 Make sure that the electrical connector (8) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 2 (5).
(d) Connect the bars (3) to the contactor bases.
1 Install the six washers (2) and nuts (1) on the contactor bases and tighten them.
2 TORQUE the six nuts to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
. (e) Install the BTC2 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
B. Installation of the AC Current Transformer
(1) FOR [42XU3] (CT-AC, 1)
(a) Put the disconnected cables through the AC current transformer 1 (5).
(c) Install the two washers (6) and screws (7) on the AC current transformer 1 (5) and tighten them.
(d) Remove the blanking caps from the electrical connectors (8) and the electrical receptacle.
1 Make sure that the electrical connector (8) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 1 (5).
(e) Install new TIE WRAP.
(f) Connect the three electrical cables (3) to the studs of the contactor base.
1 Install the three washers (2) and nuts (1) on the studs of the contactor base and tighten them.
2 TORQUE the three nuts (1) to between 1.1 and 0.90 m.daN (97.35 and 79.65 lbf.in )
.
In the rear panel 120VU, connect the related cables to the pin 2 of the circuit breakers connected to the AC BUS 1 busbar 1XP.
(g) In the AC power center 123VU, connect the related cables to the pin 2 of the circuit breakers 11QA and 12QA.
(2) FOR [42XU4] (CT-AC, 2)
(a) Put the disconnected cables through the AC current transformer 2 (5).
(c) Install the two washers (6) and screws (7) on the AC current transformer 2 (5) and tighten them.
(d) Remove the blanking caps from the electrical connectors (8) and the electrical receptacle.
1 Make sure that the electrical connector (8) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 2 (5).
(e) Install new TIE WRAP.
(f) Connect the three electrical cables (3) to the studs of the contactor base.
1 Install the three washers (2) and nuts (1) on the studs of the contactor base and tighten them.
2 TORQUE the three nuts (1) to between 1.1 and 0.90 m.daN (97.35 and 79.65 lbf.in )
.
In the rear panel 120VU, connect the related cables to the pin 2 of the circuit breakers connected to the AC BUS 2 busbar 2XP.
(g) In the AC power center 123VU, connect the related cables to the pin 2 of the circuit breakers 11QA and 12QA.
Subtask 24-22-17-420-051-B ** ON A/C NOT FOR ALL (1) FOR [42XU3] (CT-AC, 1)
(a) Put the disconnected cables through the AC current transformer 1 (5).
NOTE: Make sure that the location and the color of the cables of each bundle agree with those you recorded at the removal.
(b) Move the AC current transformer 1 (5) along the cable bundles. (c) Install the two washers (6) and screws (7) on the AC current transformer 1 (5) and tighten them.
(d) Remove the blanking caps from the electrical connectors (8) and the electrical receptacle.
1 Make sure that the electrical connector (8) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 1 (5).
(e) Install new TIE WRAP.
(f) Connect the three electrical cables (3) to the studs of the contactor base.
1 Install the three washers (2) and nuts (1) on the studs of the contactor base and tighten them.
2 TORQUE the three nuts (1) to between 1.1 and 0.90 m.daN (97.35 and 79.65 lbf.in )
. In the rear panel 120VU, connect the related cables to the pin 2 of the circuit breakers connected to the AC BUS 1 busbar 1XP.
(g) In the AC power center 123VU, connect the related cables to the pin 2 of the circuit breakers 11QA and 12QA.
NOTE: Make sure that the location and the color of the cables agree with those you recorded at the removal.
(h) Install the GLC1 (Ref. AMM TASK 24-22-55-400-002). (2) FOR [42XU4] (CT-AC, 2)
(a) Put the disconnected cables through the AC current transformer 2 (5).
NOTE: Make sure that the location and the color of the cables of each bundle agree with those you recorded at the removal.
(b) Move the AC current transformer 2 (5) along the cable bundles. (c) Install the two washers (6) and screws (7) on the AC current transformer 2 (5) and tighten them.
(d) Remove the blanking caps from the electrical connectors (8) and the electrical receptacle.
1 Make sure that the electrical connector (8) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (8) to the AC current transformer 2 (5).
(e) Install new TIE WRAP.
(f) Connect the three electrical cables (3) to the studs of the contactor base.
1 Install the three washers (2) and nuts (1) on the studs of the contactor base and tighten them.
2 TORQUE the three nuts (1) to between 1.1 and 0.90 m.daN (97.35 and 79.65 lbf.in )
. In the rear panel 120VU, connect the related cables to the pin 2 of the circuit breakers connected to the AC BUS 2 busbar 2XP.
(g) In the AC power center 123VU, connect the related cables to the pin 2 of the circuit breakers 11QA and 12QA.
NOTE: Make sure that the location and the color of the cables agree with those you recorded at the removal.
(h) Install the GLC2 (Ref. AMM TASK 24-22-55-400-002). C. Installation of the AC Current Transformer
(1) FOR [42XU1] (CT-AC, 1)
(a) Install the AC current transformer 1 (5) in correct position.
(b) Install the four washers (7), screws (6), washers (8) and nuts (9) on the AC current transformer 1 (5) and tighten them.
(c) Remove the blanking caps from the electrical connector (10) and the electrical receptacle.
1 Make sure that the electrical connector (10) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (10) to the AC current transformer 1 (5).
(d) Connect the bars (3) to the APU/EXT power-contactor module and the generator 1 contactor-module.
(e) Install the six washers (2) and screws (1) on the APU/EXT power-contactor module and the generator 1 contactor-module.
1 TORQUE the screws (1) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
.
(f) Install the BTC1 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
(2) FOR [42XU2] (CT-AC, 2)
(a) Install the AC current transformer 2 (5) in correct position.
(b) Install the four washers (7), screws (6), washers (8) and nuts (9) on the AC current transformer 2 (5) and tighten them.
(c) Remove the blanking caps from the electrical connector (10) and the electrical receptacle.
1 Make sure that the electrical connector (10) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (10) to the AC current transformer 2 (5).
(d) Connect the bars (3) to the APU/EXT power-contactor module and the generator 2 contactor-module.
(e) Install the six washers (2) and screws (1) on the APU/EXT power-contactor module and the generator 2 contactor-module.
1 TORQUE the screws (1) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
.
(f) Install the BTC2 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
Subtask 24-22-17-420-052-B ** ON A/C NOT FOR ALL (1) FOR [42XU1] (CT-AC, 1)
(a) Install the AC current transformer 1 (5) in correct position.
(b) Install the four washers (7), screws (6), washers (8) and nuts (9) on the AC current transformer 1 (5) and tighten them.
(c) Remove the blanking caps from the electrical connector (10) and the electrical receptacle.
1 Make sure that the electrical connector (10) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (10) to the AC current transformer 1 (5).
(d) Connect the bars (3) to the APU/EXT power-contactor module and the generator 1 contactor-module.
(e) Install the six washers (2) and screws (1) on the APU/EXT power-contactor module and the generator 1 contactor-module.
1 TORQUE the screws (1) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
. (f) Install the BTC1 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
(2) FOR [42XU2] (CT-AC, 2)
(a) Install the AC current transformer 2 (5) in correct position.
(b) Install the four washers (7), screws (6), washers (8) and nuts (9) on the AC current transformer 2 (5) and tighten them.
(c) Remove the blanking caps from the electrical connector (10) and the electrical receptacle.
1 Make sure that the electrical connector (10) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (10) to the AC current transformer 2 (5).
(d) Connect the bars (3) to the APU/EXT power-contactor module and the generator 2 contactor-module.
(e) Install the six washers (2) and screws (1) on the APU/EXT power-contactor module and the generator 2 contactor-module.
1 TORQUE the screws (1) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
. (f) Install the BTC2 (Ref. AMM TASK 24-22-55-400-002) and the APU GLC (Ref. AMM TASK 24-23-55-400-001).
D. Installation of the AC Current Transformer
(1) FOR [42XU3] (CT-AC, 1)
(a) Put the disconnected cables through the AC current transformer 1 (1).
(c) Install the two washers (2) and screws (3) on the AC current transformer 1 (1) and tighten them.
(d) Remove the blanking caps from the electrical connector (5) and the electrical receptacle.
1 Make sure that the electrical connector (5) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (5) to the AC current transformer 1 (1).
(e) Install new TIE WRAP.
(f) Make sure that the three electrical cables (7) and (6) are clean and in the correct condition.
1 Connect the three electrical cables (7) and (6) to the generator 1 contactor-module.
2 Install the three washers (8) and screws (9) on the generator 1 contactor-module.
3 TORQUE the three screws (9) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
.
In the rear panel 120VU, connect the related wires to pin 2 of the circuit breakers connected to the AC BUS 1 busbar 1XP.
(g) In the AC power center 123VU, connect the related wires to pin 2 of the circuit breakers 11QA and 12QA.
(a) Put the disconnected cables through the AC current transformer 2 (1).
(c) Install the two washers (2) and screws (3) on the AC current transformer 2 (1) and tighten them.
(d) Remove the blanking caps from the electrical connector (5) and the electrical receptacle.
1 Make sure that the electrical connector (5) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (5) to the AC current transformer 2 (1).
(e) Install new TIE WRAP.
(f) Make sure that the three electrical cables (7) and (6) are clean and in the correct condition.
1 Connect the three electrical cables (7) and (6) to the generator 2 contactor-module.
2 Install the three washers (8) and screws (9) on the generator 2 contactor-module.
3 TORQUE the three screws (9) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
.
In the rear panel 120VU, connect the related wires to pin 2 of the circuit breakers connected to the AC BUS 2 busbar 2XP.
(g) In the AC power center 123VU, connect the related wires to pin 2 of the circuit breakers 11QA and 12QA.
Subtask 24-22-17-860-054-A ** ON A/C NOT FOR ALL (1) FOR [42XU3] (CT-AC, 1)
(a) Put the disconnected cables through the AC current transformer 1 (1).
NOTE: Make sure that the location and the color of the cables of each bundle agree with those you recorded at the removal.
(b) Move the AC current transformer 1 (1) along the cable bundles. (c) Install the two washers (2) and screws (3) on the AC current transformer 1 (1) and tighten them.
(d) Remove the blanking caps from the electrical connector (5) and the electrical receptacle.
1 Make sure that the electrical connector (5) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (5) to the AC current transformer 1 (1).
(e) Install new TIE WRAP.
(f) Make sure that the three electrical cables (7) and (6) are clean and in the correct condition.
1 Connect the three electrical cables (7) and (6) to the generator 1 contactor-module.
2 Install the three washers (8) and screws (9) on the generator 1 contactor-module.
3 TORQUE the three screws (9) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
. In the rear panel 120VU, connect the related wires to pin 2 of the circuit breakers connected to the AC BUS 1 busbar 1XP.
(g) In the AC power center 123VU, connect the related wires to pin 2 of the circuit breakers 11QA and 12QA.
NOTE: Make sure that the location and the color of the cables agree with those you recorded at the removal.
(2) FOR [42XU4] (CT-AC, 2)(a) Put the disconnected cables through the AC current transformer 2 (1).
NOTE: Make sure that the location and the color of the cables of each bundle agree with those you recorded at the removal.
(b) Move the AC current transformer 2 (1) along the cable bundles. (c) Install the two washers (2) and screws (3) on the AC current transformer 2 (1) and tighten them.
(d) Remove the blanking caps from the electrical connector (5) and the electrical receptacle.
1 Make sure that the electrical connector (5) and the electrical receptacle are clean and in the correct condition.
2 Connect the electrical connector (5) to the AC current transformer 2 (1).
(e) Install new TIE WRAP.
(f) Make sure that the three electrical cables (7) and (6) are clean and in the correct condition.
1 Connect the three electrical cables (7) and (6) to the generator 2 contactor-module.
2 Install the three washers (8) and screws (9) on the generator 2 contactor-module.
3 TORQUE the three screws (9) to between 0.70 and 0.52 m.daN (61.95 and 46.02 lbf.in )
. In the rear panel 120VU, connect the related wires to pin 2 of the circuit breakers connected to the AC BUS 2 busbar 2XP.
(g) In the AC power center 123VU, connect the related wires to pin 2 of the circuit breakers 11QA and 12QA.
NOTE: Make sure that the location and the color of the cables agree with those you recorded at the removal.
E. Aircraft Maintenance Configuration
(1) FOR [42XU1] (CT-AC, 1), [42XU2] (CT-AC, 2)
Energize the aircraft electrical circuits from the external power (Ref. AMM TASK 24-41-00-861-002).
Subtask 24-22-17-860-057-B ** ON A/C NOT FOR ALL (1) FOR [42XU1] (CT-AC, 1), [42XU2] (CT-AC, 2)
Energize the aircraft electrical circuits from the external power (Ref. AMM TASK 24-41-00-861-002).
F. Aircraft Maintenance Configuration
(1) FOR [42XU3] (CT-AC, 1)
Do these tests:
Subtask 24-22-17-860-058-B ** ON A/C NOT FOR ALL (1) FOR [42XU3] (CT-AC, 1)
Do these tests:
- (Ref. AMM TASK 24-26-00-710-002),
- (Ref. AMM TASK 29-12-00-710-001),
- (Ref. AMM TASK 21-26-00-710-002),
- (Ref. AMM TASK 30-42-00-710-001),
- (Ref. AMM TASK 28-21-00-710-001),
- (Ref. AMM TASK 33-51-00-710-001),
- (Ref. AMM TASK 29-31-00-710-001),
- (Ref. AMM TASK 33-25-00-710-001),
- (Ref. AMM TASK 24-24-00-710-001),
- (Ref. AMM TASK 30-31-00-710-001),
- (Ref. AMM TASK 24-32-00-710-001).
G. Aircraft Maintenance Configuration
(1) FOR [42XU4] (CT-AC, 2)
(a) Do these tests:
Subtask 24-22-17-865-050-A ** ON A/C NOT FOR ALL (1) FOR [42XU4] (CT-AC, 2)
(a) Do these tests:
- (Ref. AMM TASK 24-26-00-710-002),
- (Ref. AMM TASK 21-26-00-710-002),
- (Ref. AMM TASK 30-42-00-710-001),
- (Ref. AMM TASK 33-25-00-710-001),
- (Ref. AMM TASK 28-21-00-710-001),
- (Ref. AMM TASK 30-31-00-710-001),
- (Ref. AMM TASK 34-11-00-710-001),
- (Ref. AMM TASK 33-21-00-710-001),
- (Ref. AMM TASK 24-24-00-710-001),
- (Ref. AMM TASK 24-32-00-710-001).
H. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 24-22-17-710-050-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
I. Operational Test
(1) Do this test:
Subtask 24-22-17-710-050-D ** ON A/C NOT FOR ALL (1) Do this test:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM display unit:
|
2.On the ELEC panel 35VU:
| On the panel 35VU:
|
3.In the FWD and/or AFT galleys:
| On the lower ECAM display unit:
|
4.On the MCDU:
| On the MCDU, on the AC GEN page:
|
I. Operational Test
(1) Do this test:
Subtask 24-22-17-860-056-A ** ON A/C NOT FOR ALL (1) Do this test:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the lower ECAM display unit:
|
2.On the ELEC panel 35VU:
| On the panel 35VU:
|
3.In the FWD and/or AFT galleys:
| On the lower ECAM display unit:
|
4.On the MCDU:
| On the MCDU, on the AC GEN page:
|
J. Aircraft Maintenance Configuration
(1) FOR [42XU1] (CT-AC, 1), [42XU2] (CT-AC, 2), [42XU3] (CT-AC, 1), [42XU4] (CT-AC, 2)
De-energize the aircraft electrical circuits supplied from the external power (Ref. AMM TASK 24-41-00-862-002).
5. Close-up(1) FOR [42XU1] (CT-AC, 1), [42XU2] (CT-AC, 2), [42XU3] (CT-AC, 1), [42XU4] (CT-AC, 2)
De-energize the aircraft electrical circuits supplied from the external power (Ref. AMM TASK 24-41-00-862-002).
Subtask 24-22-17-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Install the access panel (4) on the rear panel 120VU.
(4) Install the third occupant seat (Ref. AMM TASK 25-11-41-400-001).
(5) Close the access door 121AL.
(6) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Install the access panel (4) on the rear panel 120VU.
(4) Install the third occupant seat (Ref. AMM TASK 25-11-41-400-001).
(5) Close the access door 121AL.
(6) Remove the access platform(s).
AC Current Transformer (42XU1, 42XU2)