Servicing of the Integrated Drive Generator (IDG) after Oil Chemical Contamination
TASK 24-21-00-612-044-A
Servicing of the Integrated Drive Generator (IDG) after Oil Chemical Contamination
You must do this procedure to clean the IDG and the external lines.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 24-21-00-861-061-A ** ON A/C NOT FOR ALL Subtask 24-21-00-941-061-A ** ON A/C NOT FOR ALL
Subtask 24-21-00-864-052-A ** ON A/C NOT FOR ALL
(2) Connect the pressure fill hose (10) of the FILLING EQUIPMENT - TANK OIL to the pressure fill half-coupling (6).
(a) Use a pump to fill the IDG (7) with filtered Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) until:
Subtask 24-21-00-640-054-A ** ON A/C NOT FOR ALL
Subtask 24-21-00-410-067-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:19:49 UTC
Servicing of the Integrated Drive Generator (IDG) after Oil Chemical Contamination
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
WEAR GOGGLES, INSULATED GLOVES AND OTHER PROTECTIVE CLOTHES.
HOT OIL CAN BURN YOUR EYES AND SKIN.
IF OIL TOUCHES YOUR EYES OR SKIN, GET MEDICAL AID.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT OPERATE THE IDG:
- IF IT CONTAINS TOO MUCH OIL
- IF IT DOES NOT CONTAIN ENOUGH OIL
CAUTION:
USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO THE IDG.
THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
CAUTION:
DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT (PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
CAUTION:
DO NOT DO THE SERVICING OF A DISCONNECTED IDG. CONTINUED OPERATION OF A DEFECTIVE IDG CAN CAUSE DAMAGE.
CAUTION:
DO NOT LET ENGINE OIL FALL ON THE ENGINE. UNWANTED OIL MUST BE REMOVED IMMEDIATELY. THE OIL CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
NOTE: Airbus recommends that you do not do the servicing for more than one IDG at a time.
1. Reason for the JobYou must do this procedure to clean the IDG and the external lines.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V02-119) | corrosion resistant steel lockwire |
| (Material No.03ABA1) | Synthetic base Lubricating Oil-Turbine Engine - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 435 | FAN AND ACCESSORY GEARBOX |
| 436 | FAN AND ACCESSORY GEARBOX |
| 445 | FAN AND ACCESSORY GEARBOX |
| 446 | FAN AND ACCESSORY GEARBOX |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 438AL, 447AL, 448AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | O-RING | AIPC 24-21-51-81-020 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-13-24-612-011-A | Integrated Drive Generator (IDG) Servicing - Filling of the IDG with Oil or Addition of Oil after a Level Check |
| TASK 24-21-51-000-011-A | Removal of the IDG Oil Filter(s) |
| TASK 24-21-51-400-011-A | Installation of the IDG Oil Filter(s) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 71-00-00-710-018-A | Discontinued Start, Restart and Shutdown Procedures |
| TASK 71-00-00-710-043-A | Normal Engine Automatic-Start Procedure |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 20-34-00-00 | LIST OF MATERIALS REQUIRED FOR IDG SERVICE AND MAINTENANCE - DESCRIPTION AND OPERATION |
Subtask 24-21-00-861-061-A ** ON A/C NOT FOR ALL Subtask 24-21-00-941-061-A ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
Subtask 24-21-00-010-067-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
C. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-010):
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR,
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR,
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
Subtask 24-21-00-864-052-A ** ON A/C NOT FOR ALL
A. Depressurization of the IDG Case
(1) Let the IDG temperature decreases to 120 DEG.F (49 DEG.C) or less before you drain the oil.
(3) Remove the dust cap (3) from the overflow drain half-coupling (5).
(4) Put the end of the HOSE - DRAIN (8) of the FILLING EQUIPMENT - TANK OIL in the CONTAINER 10 L(2 1/2 USGAL) (9).
(5) Do this step to depressurize the IDG case:
(a) Connect the overflow drain hose (8) of the FILLING EQUIPMENT - TANK OIL to the overflow drain half-coupling (5).
Subtask 24-21-00-680-053-D ** ON A/C NOT FOR ALL (1) Let the IDG temperature decreases to 120 DEG.F (49 DEG.C) or less before you drain the oil.
WARNING:
POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES AND SKIN.
CAUTION:
DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE DAMAGE TO THE OVERFLOW DRAIN HALF-COUPLING SEAT.
CAUTION:
MAKE SURE YOU CONNECT THE HOSE OF THE OVERFLOW DRAIN HALF- COUPLING CORRECTLY. THIS HOSE LETS THE OIL IN THE IDG DRAIN TO THE CORRECT LEVEL. IF THERE IS TOO MUCH OIL IN THE IDG THE IDG WILL BECOME TOO HOT.
(2) Put the CONTAINER 10 L(2 1/2 USGAL) (9) below the IDG (7). (3) Remove the dust cap (3) from the overflow drain half-coupling (5).
(4) Put the end of the HOSE - DRAIN (8) of the FILLING EQUIPMENT - TANK OIL in the CONTAINER 10 L(2 1/2 USGAL) (9).
(5) Do this step to depressurize the IDG case:
(a) Connect the overflow drain hose (8) of the FILLING EQUIPMENT - TANK OIL to the overflow drain half-coupling (5).
NOTE: Some oil can come out of the overflow drain hose (8) of the FILLING EQUIPMENT - TANK OIL when you connect it.
B. Draining of the IDG Oil
(3) Remove and discard the O-ring (2).
(4) Drain the oil.
(5) Remove the dust cap (4) from the pressure fill half-coupling (6).
(6) Connect the pressure fill hose (10) of the FILLING EQUIPMENT - TANK OIL to the pressure fill half-coupling (6).
(7) Use the FILLING EQUIPMENT - TANK OIL to fill the IDG (7) with new Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) and drain the used oil:
(a) Make sure that the filling pressure is not more than 2.41 bar (34.95 psi).
(8) Continue to fill the IDG (7) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) until 1.85 l (0.49 USgal) of oil flows out of the case drain.
(9) Stop the FILLING EQUIPMENT - TANK OIL.
(10) Let the oil drain from the case drain until the flow of oil decreases to drops.
(11) Disconnect the pressure fill hose (10) of the FILLING EQUIPMENT - TANK OIL from the pressure fill half-coupling (6).
(12) Install the dust cap (4) on the pressure fill half-coupling (6).
Subtask 24-21-00-920-054-B ** ON A/C NOT FOR ALL WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Cut and discard the lockwire from the case drain plug (1).NOTE: Approximately 5.72 l (1.5111 USgal) of oil will flow into the CONTAINER 10 L(2 1/2 USGAL).
(2) Remove the case drain plug (1).(3) Remove and discard the O-ring (2).
(4) Drain the oil.
(5) Remove the dust cap (4) from the pressure fill half-coupling (6).
(6) Connect the pressure fill hose (10) of the FILLING EQUIPMENT - TANK OIL to the pressure fill half-coupling (6).
(7) Use the FILLING EQUIPMENT - TANK OIL to fill the IDG (7) with new Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) and drain the used oil:
(a) Make sure that the filling pressure is not more than 2.41 bar (34.95 psi).
(8) Continue to fill the IDG (7) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) until 1.85 l (0.49 USgal) of oil flows out of the case drain.
(9) Stop the FILLING EQUIPMENT - TANK OIL.
(10) Let the oil drain from the case drain until the flow of oil decreases to drops.
(11) Disconnect the pressure fill hose (10) of the FILLING EQUIPMENT - TANK OIL from the pressure fill half-coupling (6).
(12) Install the dust cap (4) on the pressure fill half-coupling (6).
C. Removal of the IDG Oil Charge and Scavenge Filter Elements
(1) Replace the IDG oil scavenge-filter-element (Ref. AMM TASK 24-21-51-000-011) and (Ref. AMM TASK 24-21-51-400-011).
(2) Remove and discard the IDG oil charge-filter-element (Ref. AMM TASK 24-21-51-000-011) and install the filter cover with a new O-ring (Ref. AMM TASK 24-21-51-400-011).
Subtask 24-21-00-612-106-A ** ON A/C NOT FOR ALL (1) Replace the IDG oil scavenge-filter-element (Ref. AMM TASK 24-21-51-000-011) and (Ref. AMM TASK 24-21-51-400-011).
(2) Remove and discard the IDG oil charge-filter-element (Ref. AMM TASK 24-21-51-000-011) and install the filter cover with a new O-ring (Ref. AMM TASK 24-21-51-400-011).
CAUTION:
USE ONLY APPROVED TYPES/BRANDS OF LUBRICANTS. DO NOT MIX TYPES//BRANDS OF LUBRICANTS.
D. Flushing of the IDG NOTE: Approximately 3.8 l (1.00 USgal) of oil will flow in the CONTAINER 10 L(2 1/2 USGAL).
NOTE: This procedure gives a list of approved oil-brand names for the IDG (Ref. AMM D/O 20-34-00-00).
(1) Remove the dust cap (4) from the pressure fill half-coupling (6). (2) Connect the pressure fill hose (10) of the FILLING EQUIPMENT - TANK OIL to the pressure fill half-coupling (6).
(a) Use a pump to fill the IDG (7) with filtered Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) until:
- The color of the oil that flows from the case drain is the same as the color of the oil that you put in the IDG (7), or
- You collect approximately 3.8 l (1.00 USgal) of oil from the case drain.
E. Lubricate the new AIPC 24-21-51-81-020 O-RING (2) with Synthetic base Lubricating Oil-Turbine Engine - - (Material No.03ABA1) .
Subtask 24-21-00-420-058-A ** ON A/C NOT FOR ALL F. Installation of the Case Drain Plug
(1) Install the new O-ring (2) on the case drain plug (1).
(2) Install the case drain plug (1).
(3) TORQUE the case drain plug (1) to between 75 and 55 lbf.in (0.85 and 0.62 m.daN )
.
(4) Safety the case drain plug (1) with corrosion resistant steel lockwire (Material No.V02-119) .
Subtask 24-21-00-612-054-A ** ON A/C NOT FOR ALL Subtask 24-21-00-410-144-A ** ON A/C NOT FOR ALL (1) Install the new O-ring (2) on the case drain plug (1).
(2) Install the case drain plug (1).
(3) TORQUE the case drain plug (1) to between 75 and 55 lbf.in (0.85 and 0.62 m.daN )
. (4) Safety the case drain plug (1) with corrosion resistant steel lockwire (Material No.V02-119) .
H. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL and 438AR
(b) FOR [1000EM2] (ENGINE-2)
438AL and 448AR.
Subtask 24-21-00-710-057-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL and 438AR
(b) FOR [1000EM2] (ENGINE-2)
438AL and 448AR.
I. Operation of the Engine
(1) Start the related engine (Ref. AMM TASK 71-00-00-710-043) until the oil temperature of the IDG is 175 deg.F (80 deg.C).
Subtask 24-21-00-410-145-A ** ON A/C NOT FOR ALL (1) Start the related engine (Ref. AMM TASK 71-00-00-710-043) until the oil temperature of the IDG is 175 deg.F (80 deg.C).
NOTE: You can read the oil temperature on the ELEC page of the lower ECAM DU.
(2) Stop the engine (Ref. AMM TASK 71-00-00-710-018). J. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-010):
(1) FOR [1000EM1] (ENGINE-1)
437AL and 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL and 448AR.
Subtask 24-21-00-680-054-B ** ON A/C NOT FOR ALL (1) FOR [1000EM1] (ENGINE-1)
437AL and 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL and 448AR.
K. Do steps 4.A again.
(1) Replace the IDG oil scavenge-filter-element (Ref. AMM TASK 24-21-51-000-011) and (Ref. AMM TASK 24-21-51-400-011).
(2) Install the new IDG oil charge-filter-element, the new O-ring and the filter cover (Ref. AMM TASK 24-21-51-400-011).
(3) Do steps 4.E and 4.F again.
Subtask 24-21-00-612-062-A ** ON A/C NOT FOR ALL (1) Replace the IDG oil scavenge-filter-element (Ref. AMM TASK 24-21-51-000-011) and (Ref. AMM TASK 24-21-51-400-011).
(2) Install the new IDG oil charge-filter-element, the new O-ring and the filter cover (Ref. AMM TASK 24-21-51-400-011).
(3) Do steps 4.E and 4.F again.
L. Fill the IDG with oil or add oil to the IDG after a level check (Ref. AMM TASK 12-13-24-612-011).
5. Close-upSubtask 24-21-00-410-067-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR,
(b) FOR [1000EM2] (ENGINE-2)
438AL 448AR.
(3) Remove the WARNING NOTICE(S).
Subtask 24-21-00-862-060-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR,
(b) FOR [1000EM2] (ENGINE-2)
438AL 448AR.
(3) Remove the WARNING NOTICE(S).
Servicing of IDG after Oil Chemical Contamination