Reactivation of the RAT Extension Control
TASK 24-20-00-440-002-A
Reactivation of the RAT Extension Control
1. Reason for the Job
MMEL 24-24-02A
RAT EXTENSION AUTOMATIC CONTROL
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 24-20-00-860-056-A
Subtask 24-20-00-710-055-B 5. Close-up
Subtask 24-20-00-860-055-A
[Rev.10 from 2021]
2026.03.31 23:19:27 UTC
Reactivation of the RAT Extension Control
1. Reason for the Job
MMEL 24-24-02A
RAT EXTENSION AUTOMATIC CONTROL
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-22-00-710-006-A | Operational Check of Ram Air Turbine (RAT) Automatic Deployment |
Subtask 24-20-00-860-056-A
A. Not Applicable
4. ProcedureSubtask 24-20-00-710-055-B 5. Close-up
Subtask 24-20-00-860-055-A
A. Make sure that the work area is clean and clear of tools and other items.