Removal of the DEU A/DEU B - Mount
TASK 23-73-48-000-001-A
Removal of the DEU A/DEU B - Mount
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 23-73-48-861-050-A ** ON A/C NOT FOR ALL
Subtask 23-73-48-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:12:36 UTC
Removal of the DEU A/DEU B - Mount
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| No specific | AR | STEPLADDER 0.5 M (1.6 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-73-46-000-001-A | Removal of the Decoder/Encoder Unit A |
| TASK 23-73-47-000-001-A | Removal of the Decoder/Encoder Unit B |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-23-42-000-001-A | Removal of the Ceiling Panels - Forward Utility Area |
| TASK 25-23-42-000-002-A | Removal of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
Subtask 23-73-48-861-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 23-73-48-865-050-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
B. Open, safety and tag these circuit breakers in this sequence:
Subtask 23-73-48-010-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DIR ESS/2 | 157RH | G02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM DIR ESS/2 | 157RH | G02 |
| 121VU | COM NAV/CIDS/DIR NORM/2 | 156RH | M07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DIR NORM/2 | 156RH | M06 |
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| 121VU | COM/CIDS/DEU A BAT/LINE 1 | 144RH | N13 |
| 121VU | COM/CIDS/DEU A BAT/LINE 2 | 145RH | N14 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| 49VU | COM/CIDS/DEU A ESS/LINE 1 | 154RH | G04 |
| 49VU | COM/CIDS/DEU A ESS/LINE 2 | 155RH | G05 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/L MID | 165RH | M12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/L MID | 165RH | M11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R MID | 166RH | M13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R MID | 166RH | M12 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M13 |
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M14 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS/ DEU A NORM AFT LH | 173RH | C07 |
| 2001VU | CIDS/ DEU A NORM AFT RH | 174RH | C08 |
| 2001VU | CIDS/ DEU A NORM MID 2 LH | 175RH | C05 |
| 2001VU | CIDS/ DEU A NORM MID 2 RH | 176RH | C06 |
C. Get Access
(1) Put a STEPLADDER 0.5 M (1.6 FT) below the related access panel.
(2) Remove the related cove light panel (Ref. AMM TASK 25-23-48-000-001), or the forward utility-area ceiling panel (Ref. AMM TASK 25-23-42-000-001), or the aft utility-area ceiling panel (Ref. AMM TASK 25-23-42-000-002).
4. Procedure(1) Put a STEPLADDER 0.5 M (1.6 FT) below the related access panel.
(2) Remove the related cove light panel (Ref. AMM TASK 25-23-48-000-001), or the forward utility-area ceiling panel (Ref. AMM TASK 25-23-42-000-001), or the aft utility-area ceiling panel (Ref. AMM TASK 25-23-42-000-002).
Subtask 23-73-48-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the DEU A/DEU B -Mount
(1) Disconnect the electrical connector (2) from the DEU mount (1).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove the related DEU A (Ref. AMM TASK 23-73-46-000-001) or DEU B (Ref. AMM TASK 23-73-47-000-001).
(4) Remove the screws (3) and washers (4).
(5) Remove the DEU mount (1).
(1) Disconnect the electrical connector (2) from the DEU mount (1).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove the related DEU A (Ref. AMM TASK 23-73-46-000-001) or DEU B (Ref. AMM TASK 23-73-47-000-001).
(4) Remove the screws (3) and washers (4).
(5) Remove the DEU mount (1).
Mount DEU A / DEU B