Installation of the Termination Box
TASK 23-73-43-400-001-A
Installation of the Termination Box
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 23-73-43-860-050-C ** ON A/C NOT FOR ALL
Subtask 23-73-43-420-050-A ** ON A/C NOT FOR ALL
Subtask 23-73-43-410-050-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:12:34 UTC
Installation of the Termination Box
FIN: 209RH1 ** ON A/C NOT FOR ALL
FIN: 209RH2 ** ON A/C NOT FOR ALL
FIN: 309RH1 ** ON A/C NOT FOR ALL
FIN: 309RH2 ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 209RH2 ** ON A/C NOT FOR ALL
FIN: 309RH1 ** ON A/C NOT FOR ALL
FIN: 309RH2 ** ON A/C NOT FOR ALL
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | STEPLADDER 0.5 M (1.6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [209RH1] (DEU TERMINATION BOX) | |
| FOR [209RH2] (DEU TERMINATION BOX) | |
| 251ZW, 252ZW | |
| FOR [309RH1] (DEU TERMINATION BOX) | |
| FOR [309RH2] (DEU TERMINATION BOX) | |
| 261DF | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-73-00-740-005-B | Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS |
| TASK 23-73-00-861-001-A | Energize the Cabin Intercommunication Data System (CIDS) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 26-10-00-740-801-A | BITE Test of the Smoke Detection Function - System Test |
| ASM 237305 | |
| ASM 237321 | |
| FOR [209RH1] (DEU TERMINATION BOX) | |
| FOR [209RH2] (DEU TERMINATION BOX) | |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
| FOR [309RH1] (DEU TERMINATION BOX) | |
| FOR [309RH2] (DEU TERMINATION BOX) | |
| TASK 25-23-42-000-002-A | Removal of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-42-400-002-A | Installation of the Ceiling Panels - Aft Utility Area |
Subtask 23-73-43-860-050-C ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002)
(1) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(2) FOR [209RH1] (DEU TERMINATION BOX), [209RH2] (DEU TERMINATION BOX)
Make sure that the cove light panels 251ZW and 252ZW (Ref. AMM TASK 25-23-48-000-001) are removed.
(3) FOR [309RH1] (DEU TERMINATION BOX), [309RH2] (DEU TERMINATION BOX)
Make sure that the aft utility area - ceiling panel 261DF (Ref. AMM TASK 25-23-42-000-002) is removed.
Subtask 23-73-43-860-050-D ** ON A/C NOT FOR ALL (Ref. AMM TASK 24-41-00-861-002)
(1) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(2) FOR [209RH1] (DEU TERMINATION BOX), [209RH2] (DEU TERMINATION BOX)
Make sure that the cove light panels 251ZW and 252ZW (Ref. AMM TASK 25-23-48-000-001) are removed.
(3) FOR [309RH1] (DEU TERMINATION BOX), [309RH2] (DEU TERMINATION BOX)
Make sure that the aft utility area - ceiling panel 261DF (Ref. AMM TASK 25-23-42-000-002) is removed.
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-42-00-861-001)
(1) Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU is in the OFF position.
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) FOR [209RH1] (DEU TERMINATION BOX), [209RH2] (DEU TERMINATION BOX)
Make sure that the cove light panels 251ZW and 252ZW (Ref. AMM TASK 25-23-48-000-001) are removed.
(4) FOR [309RH1] (DEU TERMINATION BOX), [309RH2] (DEU TERMINATION BOX)
Make sure that the aft utility area - ceiling panel 261DF (Ref. AMM TASK 25-23-42-000-002) is removed.
Subtask 23-73-43-865-051-A ** ON A/C NOT FOR ALL (Ref. AMM TASK 24-42-00-861-001)
(1) Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU is in the OFF position.
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) FOR [209RH1] (DEU TERMINATION BOX), [209RH2] (DEU TERMINATION BOX)
Make sure that the cove light panels 251ZW and 252ZW (Ref. AMM TASK 25-23-48-000-001) are removed.
(4) FOR [309RH1] (DEU TERMINATION BOX), [309RH2] (DEU TERMINATION BOX)
Make sure that the aft utility area - ceiling panel 261DF (Ref. AMM TASK 25-23-42-000-002) is removed.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| 49VU | COM/CIDS/DEU A ESS/AFT R | 172RH | HA12 |
| 49VU | COM/CIDS/DEU A ESS/AFT L | 179RH | HA11 |
| 49VU | COM/CIDS/DEU A ESS/FWD R | 158RH | HA10 |
| 49VU | COM/CIDS/DEU A ESS/FWD L | 159RH | HA09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM / CIDS / DEU A ESS / MID R | 196RH | G05 |
| 49VU | COM / CIDS / DEU A ESS / MID L | 195RH | G04 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B ESS/R | 420RH | G05 |
| 49VU | COM/CIDS/DEU B ESS/L | 419RH | G04 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M12 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M11 |
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M10 |
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M09 |
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M11 |
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M10 |
| 121VU | COM / CIDS / DEU B / NORM FWD | 193RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B NORM/R | 620RH | M08 |
| 121VU | COM NAV/CIDS/DEU B NORM/L | 619RH | M07 |
| 121VU | COM/CIDS/DEU B BAT/R | 720RH | Q11 |
| 121VU | COM/CIDS/DEU B BAT/L | 719RH | Q10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU A BAT/FWD R | 258RH | N14 |
| 121VU | COM/CIDS/DEU A BAT/L FWD | 259RH | N13 |
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| 121VU | COM/CIDS/DEU A BAT/AFT R | 272RH | Q11 |
| 121VU | COM/CIDS/DEU A BAT/AFT L | 279RH | Q10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | DEU A BAT MID R | 296RH | M13 |
| 121VU | DEU A BAT MID L | 295RH | M12 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS-DEU B-NORM-AFT | 194RH | C08 |
| 2001VU | CIDS-DEU A NORM-AFT-RH | 174RH | C07 |
| 2001VU | CIDS-DEU A NORM-AFT-LH | 173RH | C06 |
| 2001VU | CIDS-DEU A NORM-MID-RH | 198RH | C05 |
| 2001VU | CIDS-DEU A NORM-MID-LH | 197RH | C04 |
Subtask 23-73-43-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Termination Box
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Connect the termination box (3) to the DEU (1) and tighten the nylatches (4).
(4) Remove the CAP-BLANKING from each electrical connector and receptacle.
(5) Make sure that all the electrical connections are clean and in the correct condition.
(6) Make sure that the coding switches are in the positions recorded during the removal procedure. For the correct position of the DEU coding switches, please refer to ASM 237305 ASM 237321.
(8) Safety the electrical connector (2).
Subtask 23-73-43-865-052-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Connect the termination box (3) to the DEU (1) and tighten the nylatches (4).
(4) Remove the CAP-BLANKING from each electrical connector and receptacle.
(5) Make sure that all the electrical connections are clean and in the correct condition.
(6) Make sure that the coding switches are in the positions recorded during the removal procedure. For the correct position of the DEU coding switches, please refer to ASM 237305 ASM 237321.
NOTE: It is mandatory to set the position of the coding switches correctly. An incorrect position of the coding switches causes incorrect CIDS operation. Because of this, there can be fault messages related to the CIDS and/or the related DEU. When there are no fault messages you cannot be sure that all coding switches are in the correct position.
(7) Connect the electrical connector (2) to the termination box (3). (8) Safety the electrical connector (2).
CAUTION:
MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
(a) Safety the electrical connector (2) with the spring latches (5). B. Remove the safety clips and tags and close these circuit breakers in this sequence:
Subtask 23-73-43-869-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS-DEU A NORM-MID-RH | 198RH | C05 |
| 2001VU | CIDS-DEU A NORM-MID-LH | 197RH | C04 |
| 2001VU | CIDS-DEU B-NORM-AFT | 194RH | C08 |
| 121VU | COM / CIDS / DEU B / NORM FWD | 193RH | M09 |
| 2001VU | CIDS-DEU A NORM-AFT-RH | 174RH | C07 |
| 2001VU | CIDS-DEU A NORM-AFT-LH | 173RH | C06 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M12 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R FWD | 164RH | M10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/L FWD | 163RH | M09 |
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B NORM/L | 619RH | M07 |
| 121VU | COM NAV/CIDS/DEU B NORM/R | 620RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM / CIDS / DEU A ESS / MID R | 196RH | G05 |
| 49VU | COM / CIDS / DEU A ESS / MID L | 195RH | G04 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU A ESS/AFT L | 179RH | HA11 |
| 49VU | COM/CIDS/DEU A ESS/AFT R | 172RH | HA12 |
| 49VU | COM/CIDS/DEU A ESS/FWD L | 159RH | HA09 |
| 49VU | COM/CIDS/DEU A ESS/FWD R | 158RH | HA10 |
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B ESS/L | 419RH | G04 |
| 49VU | COM/CIDS/DEU B ESS/R | 420RH | G05 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | DEU A BAT MID R | 296RH | M13 |
| 121VU | DEU A BAT MID L | 295RH | M12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU A BAT/AFT L | 279RH | Q10 |
| 121VU | COM/CIDS/DEU A BAT/AFT R | 272RH | Q11 |
| 121VU | COM/CIDS/DEU A BAT/L FWD | 259RH | N13 |
| 121VU | COM/CIDS/DEU A BAT/FWD R | 258RH | N14 |
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU B BAT/L | 719RH | Q10 |
| 121VU | COM/CIDS/DEU B BAT/R | 720RH | Q11 |
C. Aircraft Maintenance Configuration
(1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(2) Do the BITE test of the Cabin Intercommunication Data System (CIDS) through the CFDS
(Ref. AMM TASK 23-73-00-740-005).
Subtask 23-73-43-740-050-A ** ON A/C NOT FOR ALL 5. Close-up(1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(2) Do the BITE test of the Cabin Intercommunication Data System (CIDS) through the CFDS
(Ref. AMM TASK 23-73-00-740-005).
Subtask 23-73-43-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [209RH1] (DEU TERMINATION BOX), [209RH2] (DEU TERMINATION BOX)
Install the cove light panels 251ZW and 252ZW (Ref. AMM TASK 25-23-48-400-001).
(3) FOR [309RH1] (DEU TERMINATION BOX), [309RH2] (DEU TERMINATION BOX)
Install the aft utility area - ceiling panel 261DF (Ref. AMM TASK 25-23-42-400-002).
(4) Remove the STEPLADDER 0.5 M (1.6 FT).
Subtask 23-73-43-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [209RH1] (DEU TERMINATION BOX), [209RH2] (DEU TERMINATION BOX)
Install the cove light panels 251ZW and 252ZW (Ref. AMM TASK 25-23-48-400-001).
(3) FOR [309RH1] (DEU TERMINATION BOX), [309RH2] (DEU TERMINATION BOX)
Install the aft utility area - ceiling panel 261DF (Ref. AMM TASK 25-23-42-400-002).
(4) Remove the STEPLADDER 0.5 M (1.6 FT).
Termination Box DEU Type A/B - Component Location