Replacement of the On-Board Replaceable Module
TASK 23-73-21-960-001-A
Replacement of the On-Board Replaceable Module
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 23-73-21-861-052-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 23-73-21-960-050-A ** ON A/C NOT FOR ALL
(1) On the Flight Attendant Panel (FAP), push the FAP Set-Up key.
(5) Push the quick-release button (3) carefully with a PIN - NON METALLIC to unlock the OBRM (4) from the OBRM slot (5).
(6) Pull the old OBRM (4) carefully out of the OBRM slot (5).
(7) Clean the component interfaces and the adjacent area.
(8) Do an inspection of the component interfaces and the adjacent area.
(9) Push the new OBRM (4) carefully into the respective slot, the OBRM slot (5), until it locks in position.
(11) Close the cover (2) and the quick-release fastener (1).
(12) On the FAP Set-Up page, touch the OK button.
Subtask 23-73-21-740-051-A ** ON A/C NOT FOR ALL
Subtask 23-73-21-862-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:18:06 UTC
Replacement of the On-Board Replaceable Module
FIN: 116RH ** ON A/C NOT FOR ALL
1. Reason for the JobSelf Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | PIN - NON METALLIC |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-73-00-740-005-B | Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS |
| TASK 23-73-00-869-001-A | OBRM - Download Procedure |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 26-10-00-710-801-A | Smoke Detection Function Cabin Assignment Module (SDF CAM) Layout Loading |
| TASK 26-10-00-740-801-A | BITE Test of the Smoke Detection Function - System Test |
Subtask 23-73-21-861-052-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 23-73-21-960-050-A ** ON A/C NOT FOR ALL
CAUTION:
MAKE SURE THAT YOU USE WRIST STRAPS WHEN YOU REMOVE AND INSTALL AN ONBOARD REPLACEABLE MODULE (OBRM).
WRIST STRAPS WILL PREVENT POSSIBLE ELECTROSTATIC DISCHARGES, WHICH CAN CAUSE DAMAGE TO THE OBRM'S.
A. Replacement of the On-Board Replaceable Module (116RH) (1) On the Flight Attendant Panel (FAP), push the FAP Set-Up key.
- The indicator light in the FAP Set-Up key comes on.
- The FAP Set-Up page shows.
NOTE: The IN SLOT status indication for CAM and OBRM always shows on the display.
The IN SLOT indication for I-PRAM is optional.
(2) Touch the REMOVE button. The IN SLOT indication for I-PRAM is optional.
- The message DO YOU REALLY WANT TO REMOVE THE OBRM shows.
- The message with the steps that you must do to replace the OBRM shows.
(5) Push the quick-release button (3) carefully with a PIN - NON METALLIC to unlock the OBRM (4) from the OBRM slot (5).
(6) Pull the old OBRM (4) carefully out of the OBRM slot (5).
(7) Clean the component interfaces and the adjacent area.
(8) Do an inspection of the component interfaces and the adjacent area.
(9) Push the new OBRM (4) carefully into the respective slot, the OBRM slot (5), until it locks in position.
NOTE: The I-PRAM, CAM and OBRM slots all have the same dimensions. Thus it is mandatory to push the memory card into the correct slot.
(10) Make sure that the work area is clean and clear of tools and other items.(11) Close the cover (2) and the quick-release fastener (1).
(12) On the FAP Set-Up page, touch the OK button.
- The message INSTALLATION OF THE OBRM WAS SUCCESSFUL shows.
- The OBRM status indication shows the installed OBRM part number.
B. OBRM - Software Loading, Configuration Test, Interface and Power-Up Test
(1) On the FAP, push the SW Load key.
(Ref. AMM TASK 23-73-00-740-005)
Subtask 23-73-21-740-051-B ** ON A/C NOT FOR ALL (1) On the FAP, push the SW Load key.
- The indicator light in the SW Load key comes on.
- The SOFTWARE LOADING page shows.
- The message WAIT UNTIL ALL CIDS COMPONENTS HAVE SENT THEIR CONFIGURATION shows.
- Wait approx. 2 minutes, then the message goes out of view.
- Do the OBRM download procedure.
(Ref. AMM TASK 23-73-00-869-001)
NOTE: If no component with an amber background shows on the SOFTWARE LOADING page, no OBRM software download is required.
NOTE: You can ignore the message CHANGE CAM NOW IF NECESSARY.
(3) Do the Interface and Power-Up test of the Cabin Intercommunication Data System (CIDS). (Ref. AMM TASK 23-73-00-740-005)
B. OBRM - Software Loading, Configuration Test, Interface and Power-Up Test
(1) On the FAP, push the SW Load key.
(Ref. AMM TASK 23-73-00-740-005)
(4) Do the BITE test of the Smoke Detection Function (SDF).
(Ref. AMM TASK 26-10-00-740-801)
Subtask 23-73-21-740-051-C ** ON A/C NOT FOR ALL (1) On the FAP, push the SW Load key.
- The indicator light in the SW Load key comes on.
- The SOFTWARE LOADING page shows.
- The message WAIT UNTIL ALL CIDS COMPONENTS HAVE SENT THEIR CONFIGURATION shows.
- Wait approx. 2 minutes, then the message goes out of view.
- Do the OBRM download procedure.
(Ref. AMM TASK 23-73-00-869-001)
NOTE: If no component with an amber background shows on the SOFTWARE LOADING page, no OBRM software download is required.
NOTE: You can ignore the message CHANGE CAM NOW IF NECESSARY.
(3) Do the Interface and Power-Up test of the Cabin Intercommunication Data System (CIDS). (Ref. AMM TASK 23-73-00-740-005)
(4) Do the BITE test of the Smoke Detection Function (SDF).
(Ref. AMM TASK 26-10-00-740-801)
B. OBRM - Software Loading, Configuration Test, Interface and Power-Up Test
(1) On the FAP, push the SW Load key.
(4) Do the Interface and Power-Up test of the Cabin Intercommunication Data System (CIDS).
(Ref. AMM TASK 23-73-00-740-005)
(5) Do the BITE test of the Smoke Detection Function (SDF).
(Ref. AMM TASK 26-10-00-740-801)
5. Close-up(1) On the FAP, push the SW Load key.
- The indicator light in the SW Load key comes on.
- The SOFTWARE LOADING page shows.
- The message WAIT UNTIL ALL CIDS COMPONENTS HAVE SENT THEIR CONFIGURATION shows.
- Wait approx. 2 minutes, then the message goes out of view.
- Do the OBRM download procedure.
(Ref. AMM TASK 23-73-00-869-001)
NOTE: If no component with an amber background shows on the SOFTWARE LOADING page, no OBRM software download is required.
NOTE: You can ignore the message CHANGE CAM NOW IF NECESSARY.
(3) Load the SMOKE LAYOUT into SDF1 and SDF2 (Ref. AMM TASK 26-10-00-710-801). (4) Do the Interface and Power-Up test of the Cabin Intercommunication Data System (CIDS).
(Ref. AMM TASK 23-73-00-740-005)
(5) Do the BITE test of the Smoke Detection Function (SDF).
(Ref. AMM TASK 26-10-00-740-801)
Subtask 23-73-21-862-051-A ** ON A/C NOT FOR ALL
On-Board Replaceable Module