Installation of the Mechanic Call Horn
TASK 23-42-21-400-001-A
Installation of the Mechanic Call Horn
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 23-42-21-860-051-A
Subtask 23-42-21-410-050-A
[Rev.10 from 2021]
2026.04.05 10:34:37 UTC
Installation of the Mechanic Call Horn
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 700 | LANDING GEAR AND LANDING GEAR DOORS |
| 713, 714 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-42-00-710-001-A | Operational Test of the Mechanic Call |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
| ESPM 2043130 | |
| ESPM 2048250 | |
| ASM 234201 | |
| AWM 234202 | |
Subtask 23-42-21-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that you put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the landing gear.
(2) Make sure that the main doors 713 and 714 of the nose landing gear well (Ref. AMM TASK 32-22-00-010-001) are open.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position under the nose landing gear well.
Subtask 23-42-21-865-051-A (1) Make sure that you put a WARNING NOTICE(S) in the cockpit to tell persons not to operate the landing gear.
(2) Make sure that the main doors 713 and 714 of the nose landing gear well (Ref. AMM TASK 32-22-00-010-001) are open.
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position under the nose landing gear well.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | EIS/HORN/SPLY | 2WC | P09 |
CAUTION:
DO NOT APPLY TOO MUCH PRESSURE ON THE MOBILE PART OF THE HORN. TOO MUCH PRESSURE WILL CAUSE DAMAGE TO THE HORN (WILL DECREASE THE CLEARANCE BETWEEN THE MOBILE AND FIXED PARTS).
Subtask 23-42-21-420-050-B A. Installation of the Mechanic Call Horn
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the mechanic call horn (11) on the support (12).
(4) Put the three washers (9) and the screws (8) in position.
(5) Tighten the screws (8).
(6) Put the support (12) on the cover (2).
(7) Put the four washers (6) and the screws (5) in position.
(8) Tighten the screws (5).
(9) Use the applicable tool ASM 234201 AWM 234202 ESPM 2048250 ESPM 2043130 to connect the power supply wires (4).
(10) Slowly close the cover (2) of the box (3).
(11) Hold the cover (2) of the box (3) and tighten the three quick-release fasteners (1) by a quarter turn.
Subtask 23-42-21-865-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the mechanic call horn (11) on the support (12).
(4) Put the three washers (9) and the screws (8) in position.
(5) Tighten the screws (8).
(6) Put the support (12) on the cover (2).
(7) Put the four washers (6) and the screws (5) in position.
(8) Tighten the screws (5).
(9) Use the applicable tool ASM 234201 AWM 234202 ESPM 2048250 ESPM 2043130 to connect the power supply wires (4).
(10) Slowly close the cover (2) of the box (3).
(11) Hold the cover (2) of the box (3) and tighten the three quick-release fasteners (1) by a quarter turn.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 23-42-21-710-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | EIS/HORN/SPLY | 2WC | P09 |
C. Do the operational test of the mechanic call (Cockpit-to-Ground Crew Call only) (Ref. AMM TASK 23-42-00-710-001).
5. Close-upSubtask 23-42-21-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Close the main doors 713 and 714 of the nose landing gear well (Ref. AMM TASK 32-22-00-410-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Close the main doors 713 and 714 of the nose landing gear well (Ref. AMM TASK 32-22-00-410-001).
Mechanic Call Horn