W DOC AIRBUS | AMM A320F

Installation of the Video Tape Reproducer (VTR)


TASK 23-36-52-400-001-A
Installation of the Video Tape Reproducer (VTR)


ZONE: 220
ZONE: 230
FIN: 12MH ** ON A/C NOT FOR ALL
FIN: 13MH ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
220
FWD CAB UTILITY AREAS
230
FWD PASSENGER COMPARTMENT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 23-36-00-710-001-A
Operational Test of the Passenger Entertainment (Video)
TASK 23-73-00-861-001-A
Energize the Cabin Intercommunication Data System (CIDS)
TASK 23-73-00-862-001-A
De-energize the Cabin Intercommunication Data System (CIDS)
3. Job Set-up
Subtask 23-36-52-865-069-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CABIN-RH AFT25MHC06
2000VUPES-VIDEO-CABIN-LH23MHC05
2000VUPES-VIDEO-CABIN-RH FWD24MHC04
2000VUPES-VIDEO-CABIN-LH FWD22MHC03
2000VUPES-VIDEO-CONTROL-VCC21MHC02
2000VUPES-VIDEO-CONTROL-MAIN20MHC01
4. Procedure
Subtask 23-36-52-420-050-N ** ON A/C NOT FOR ALL
A. Installation of the Video Tape Reproducers (VTR) 12MH and 13MH
F Video Tape Reproducer ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Installation of the VTR 12MH
     (a) Put the VTR 12MH (3) in position in the special rack (8).
     (b) Push the VTR 12MH (3) on the spring pins (7).
     (c) Lift the knurled nuts (5) and engage them on the lugs (6).
     (d) Tighten the knurled nuts (5) until the lugs (4) are engaged in the brackets (1).
     (e) Install the cover (2).
   (6) Installation of the VTR 13MH
     (a) Put the VTR 13MH (10) in position in the rack (14).
     (b) Push the VTR 13MH (10) on the pins (13).
     (c) Lift the knurled nuts (12) and engage them on the lugs (11).
     (d) Tighten the knurled nuts (12).
Subtask 23-36-52-865-070-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUPES-VIDEO-CABIN-RH AFT25MHC06
2000VUPES-VIDEO-CABIN-LH23MHC05
2000VUPES-VIDEO-CABIN-RH FWD24MHC04
2000VUPES-VIDEO-CABIN-LH FWD22MHC03
2000VUPES-VIDEO-CONTROL-VCC21MHC02
2000VUPES-VIDEO-CONTROL-MAIN20MHC01
Subtask 23-36-52-860-050-A ** ON A/C NOT FOR ALL
C. Energize the Cabin Intercommunication Data System (CIDS) (Ref. AMM TASK 23-73-00-861-001).
Subtask 23-36-52-710-051-A ** ON A/C NOT FOR ALL
D. Do the Operational Test of the Passenger Entertainment (Video) (Ref. AMM TASK 23-36-00-710-001) System.
5. Close-up
Subtask 23-36-52-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) De-energize the CIDS (Ref. AMM TASK 23-73-00-862-001).
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Close the access doors of the left forward overhead stowage compartment between FR20 and FR23.
   (4) Close the front door of the left forward overhead stowage compartment.
[Rev.10 from 2021] 2026.04.02 06:12:11 UTC