Installation of the Tapping Unit (TU)
TASK 23-36-44-400-001-A
Installation of the Tapping Unit (TU)
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 23-36-44-860-050-A ** ON A/C NOT FOR ALL
Subtask 23-36-44-420-050-D ** ON A/C NOT FOR ALL
Subtask 23-36-44-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:12:11 UTC
Installation of the Tapping Unit (TU)
ZONE: 230
ZONE: 240
ZONE: 250
FIN: 50MH1 ** ON A/C NOT FOR ALL
FIN: 50MH10 ** ON A/C NOT FOR ALL
FIN: 50MH11 ** ON A/C NOT FOR ALL
FIN: 50MH12 ** ON A/C NOT FOR ALL
FIN: 50MH13 ** ON A/C NOT FOR ALL
FIN: 50MH14 ** ON A/C NOT FOR ALL
FIN: 50MH15 ** ON A/C NOT FOR ALL
FIN: 50MH16 ** ON A/C NOT FOR ALL
FIN: 50MH17 ** ON A/C NOT FOR ALL
FIN: 50MH18 ** ON A/C NOT FOR ALL
FIN: 50MH19 ** ON A/C NOT FOR ALL
FIN: 50MH2 ** ON A/C NOT FOR ALL
FIN: 50MH20 ** ON A/C NOT FOR ALL
FIN: 50MH3 ** ON A/C NOT FOR ALL
FIN: 50MH4 ** ON A/C NOT FOR ALL
FIN: 50MH5 ** ON A/C NOT FOR ALL
FIN: 50MH6 ** ON A/C NOT FOR ALL
FIN: 50MH7 ** ON A/C NOT FOR ALL
FIN: 50MH8 ** ON A/C NOT FOR ALL
FIN: 50MH9 ** ON A/C NOT FOR ALL
1. Reason for the JobZONE: 240
ZONE: 250
FIN: 50MH1 ** ON A/C NOT FOR ALL
FIN: 50MH10 ** ON A/C NOT FOR ALL
FIN: 50MH11 ** ON A/C NOT FOR ALL
FIN: 50MH12 ** ON A/C NOT FOR ALL
FIN: 50MH13 ** ON A/C NOT FOR ALL
FIN: 50MH14 ** ON A/C NOT FOR ALL
FIN: 50MH15 ** ON A/C NOT FOR ALL
FIN: 50MH16 ** ON A/C NOT FOR ALL
FIN: 50MH17 ** ON A/C NOT FOR ALL
FIN: 50MH18 ** ON A/C NOT FOR ALL
FIN: 50MH19 ** ON A/C NOT FOR ALL
FIN: 50MH2 ** ON A/C NOT FOR ALL
FIN: 50MH20 ** ON A/C NOT FOR ALL
FIN: 50MH3 ** ON A/C NOT FOR ALL
FIN: 50MH4 ** ON A/C NOT FOR ALL
FIN: 50MH5 ** ON A/C NOT FOR ALL
FIN: 50MH6 ** ON A/C NOT FOR ALL
FIN: 50MH7 ** ON A/C NOT FOR ALL
FIN: 50MH8 ** ON A/C NOT FOR ALL
FIN: 50MH9 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 230 | FWD PASSENGER COMPARTMENT |
| 240 | MID PASSENGER COMPARTMENT |
| 250 | AFT PASSENGER COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-33-00-710-005-A | Operational Test of the Integrated In-Flight Entertainment (IFE) System |
| TASK 23-36-00-600-002-A | Configuration of the Passenger Entertainment (Video) with the Programmable System Control Unit |
| TASK 23-36-00-710-001-A | Operational Test of the Passenger Entertainment (Video) |
| TASK 23-73-00-861-001-A | Energize the Cabin Intercommunication Data System (CIDS) |
| TASK 23-73-00-862-001-A | De-energize the Cabin Intercommunication Data System (CIDS) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
| TASK 23-33-00-00-01 | PASSENGER ENTERTAINMENT - DESCRIPTION AND OPERATION |
Subtask 23-36-44-860-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Make sure that the applicable cove light panels are removed (Ref. AMM TASK 25-23-48-000-001).
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an Inspection of the Insulation Mats
Subtask 23-36-44-860-050-B ** ON A/C NOT FOR ALL (1) Make sure that the applicable cove light panels are removed (Ref. AMM TASK 25-23-48-000-001).
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an Inspection of the Insulation Mats
CAUTION:
MAKE SURE THAT THE INSULATION MATS ARE NOT DAMAGED. DAMAGED INSULATION MATS CAN CAUSE WATER TO GO INTO THE TAPPING UNIT. WATER CAN CAUSE DAMAGE TO THE TAPPING UNIT.
(a) Make sure that the insulation mats adjacent to the tapping unit are clean and in the correct condition. A. Preparation for Installation
(1) Make sure that the aircraft electrical circuits are energized.
(Ref. AMM TASK 24-41-00-861-002).
(2) For the location of this component refer to (Ref. AMM D/O 23-33-00-00).
(3) Make sure that the applicable cove light panels are removed (Ref. AMM TASK 25-23-48-000-001).
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 23-36-44-865-057-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized.
(Ref. AMM TASK 24-41-00-861-002).
(2) For the location of this component refer to (Ref. AMM D/O 23-33-00-00).
(3) Make sure that the applicable cove light panels are removed (Ref. AMM TASK 25-23-48-000-001).
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CABIN-RH AFT | 25MH | C06 |
| 2000VU | PES-VIDEO-CABIN-LH | 23MH | C05 |
| 2000VU | PES-VIDEO-CABIN-RH FWD | 24MH | C04 |
| 2000VU | PES-VIDEO-CABIN-LH FWD | 22MH | C03 |
| 2000VU | PES-VIDEO-CONTROL-VCC | 21MH | C02 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CONTROL-MAIN | 20MH | C01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CABIN AFT-RH | 25MH | C06 |
| 2000VU | PES-VIDEO-CABIN AFT-LH | 23MH | C05 |
| 2000VU | PES-VIDEO-CABIN FWD-RH | 24MH | C04 |
| 2000VU | PES-VIDEO-CABIN FWD-LH | 22MH | C03 |
| 2000VU | PES-VIDEO-CONTROL-VCC-DS/C | 21MH | C02 |
Subtask 23-36-44-420-050-D ** ON A/C NOT FOR ALL
A. Installation of the Tapping Unit (TU)
(1) Carefully install the tapping unit (4) and lock the nylatches (1).
(3) Make sure that all the electrical connections are clean and in the correct condition.
Subtask 23-36-44-420-050-K ** ON A/C NOT FOR ALL (1) Carefully install the tapping unit (4) and lock the nylatches (1).
NOTE: At the end of the tapping unit lines the tapping unit must end with a termination plug. If a related tapping unit is installed, connect the termination plug to the tapping unit connector J3.
(2) Remove the blanking caps from the electrical connectors (2). (3) Make sure that all the electrical connections are clean and in the correct condition.
CAUTION:
MAKE SURE THAT THE CABLE CONNECTIONS OF THE TAPPING UNIT ARE INSTALLED CORRECTLY AND HAVE A LOW-POINT LOOP. IF YOU DO NOT HAVE A LOW-POINT LOOP IN THE CABLES, WATER CAN GO INTO THE TAPPING UNIT. WATER CAN CAUSE DAMAGE TO THE TAPPING UNIT.
(4) Connect the Electrical Connectors NOTE: You can find the instruction to install cables with a low-point loop in the ESPM 20-33-11 fig. 018.
(a) Connect the electrical connectors (2) to the tapping unit (4) and safety with the spring latches (3). A. Installation of the Tapping Unit
(1) Carefully install the tapping unit (4) and lock the nylatches (1).
(3) Make sure that all the electrical connections are clean and in the correct condition.
(4) Install a cover on the receptacle of the electrical connector J4 of TUs 50MH7 thru 50MH20.
(5) Connect the electrical connectors (2) to the tapping unit and safety with the spring latches (3).
Subtask 23-36-44-865-058-A ** ON A/C NOT FOR ALL (1) Carefully install the tapping unit (4) and lock the nylatches (1).
NOTE: At the end of the tapping unit lines the tapping unit has to be ended with a termination plug. If a related tapping unit is installed, connect the termination plug to the tapping unit connector J3.
(2) Remove the blanking caps from the electrical connectors (2). (3) Make sure that all the electrical connections are clean and in the correct condition.
(4) Install a cover on the receptacle of the electrical connector J4 of TUs 50MH7 thru 50MH20.
(5) Connect the electrical connectors (2) to the tapping unit and safety with the spring latches (3).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 23-36-44-860-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CABIN-RH AFT | 25MH | C06 |
| 2000VU | PES-VIDEO-CABIN-LH | 23MH | C05 |
| 2000VU | PES-VIDEO-CABIN-RH FWD | 24MH | C04 |
| 2000VU | PES-VIDEO-CABIN-LH FWD | 22MH | C03 |
| 2000VU | PES-VIDEO-CONTROL-VCC | 21MH | C02 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CONTROL-MAIN | 20MH | C01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | PES-VIDEO-CABIN AFT-RH | 25MH | C06 |
| 2000VU | PES-VIDEO-CABIN AFT-LH | 23MH | C05 |
| 2000VU | PES-VIDEO-CABIN FWD-RH | 24MH | C04 |
| 2000VU | PES-VIDEO-CABIN FWD-LH | 22MH | C03 |
| 2000VU | PES-VIDEO-CONTROL-VCC-DS/C | 21MH | C02 |
C. Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
Subtask 23-36-44-970-051-A ** ON A/C NOT FOR ALL Subtask 23-36-44-710-051-A ** ON A/C NOT FOR ALL (Ref. AMM TASK 23-73-00-861-001).
E. Do the operational test of the passenger entertainment (Video) (Ref. AMM TASK 23-36-00-710-001) system.
Subtask 23-36-44-710-051-E ** ON A/C NOT FOR ALL E. Do the operational test of the integrated In-Flight Entertainment (IFE) system (Ref. AMM TASK 23-33-00-710-005).
5. Close-upSubtask 23-36-44-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable cove light panel (Ref. AMM TASK 25-23-48-400-001).
Subtask 23-36-44-410-050-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable cove light panel (Ref. AMM TASK 25-23-48-400-001).
A. Close Access
(1) De-energize the CIDS (Ref. AMM TASK 23-73-00-862-001)
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the applicable cove light panels (Ref. AMM TASK 25-23-48-400-001).
Subtask 23-36-44-862-050-A ** ON A/C NOT FOR ALL (1) De-energize the CIDS (Ref. AMM TASK 23-73-00-862-001)
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the applicable cove light panels (Ref. AMM TASK 25-23-48-400-001).
Tapping Unit (TU)