W DOC AIRBUS | AMM A320F

Operational Check of IFES Power Isolation Function using PAX SYS Switch(es)


TASK 23-33-00-710-006-A
Operational Check of IFES Power Isolation Function using PAX SYS Switch(es)


ZONE: 221
1. Reason for the Job
Refer to the MPD TASK: 233300-02
OPERATIONAL CHECK OF IFES POWER ISOLATION FUNCTION USING PAX-SYS SWITCH(ES)
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
221
FWD CAB UTILITY AREA
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 23-73-00-861-001-A
Energize the Cabin Intercommunication Data System (CIDS)
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 23-33-00-861-073-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
   (2) Open the applicable access door(s) to get access to Video Control Center (VCC) 10MH.
Subtask 23-33-00-865-222-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUIFE-IFEC-AC22MKC04
** ON A/C NOT FOR ALL
2000VUINSEAT POWER-MCU 259HPB08
2000VUINSEAT POWER-MCU 158HPB05
2000VUIFE-VCC-AC21MHC02
2000VUIFE-VCC-DC20MHC01
2000VUIFE/SEAT-POWER-PAX SYS20MKD08
2000VUWAP27MHD07
** ON A/C NOT FOR ALL
2000VUIFE-IFEC-AC22MKC06
Subtask 23-33-00-860-097-J ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized (Ref. AMM TASK 23-73-00-861-001).
   (2) Make sure that the PAX SYS switch on VCC 10MH is set to the OFF position.
4. Procedure
Subtask 23-33-00-710-083-AE ** ON A/C NOT FOR ALL
A. Operational Test of the IFE Power Isolation Function with the PAX SYS Switch
ACTION
RESULT
1.On Video Control Center (VCC) 10MH:
On VCC 10MH:
  • Set the PAX SYS switch to the ON position.
  • The internal light of the PAX SYS switch comes on.
  • Wait until integrated In-Flight Entertainment (IFE) system boot sequence is completed.

NOTE: Approximately five minutes are necessary to complete the boot sequence.

On removable DU 11MH:

  • The "Login/Welcome" screen shows.
2.On VCC 10MH:
On VCC 10MH:
  • Set the PAX SYS switch to the OFF position.
  • The internal light of the PAX SYS switch goes off.

On removable DU 11MH:
  • The display of removable DU 11MH goes off.
3.After two minutes on VCC 10MH:
On VCC 10MH:
  • Set the PAX SYS switch to the ON position.
  • The internal light of the PAX SYS switch comes on.

  • Wait until the integrated In-Flight Entertainment (IFE) system boot sequence is completed.

NOTE: Approximately five minutes are necessary to complete the boot sequence.

On removable DU 11MH:

  • The "Login/Welcome" screen comes on.
5. Close-up
Subtask 23-33-00-410-062-D ** ON A/C NOT FOR ALL
A. Close Access
   (1) As necessary, remove the headsets connected to the seat audio jacks.
   (2) Close the applicable access door(s) of VCC 10MH.
Subtask 23-33-00-860-098-A ** ON A/C NOT FOR ALL
B. Put the aircraft back to the serviceable condition.
   (1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:12:06 UTC