Installation of the Attenuator-SATCOM
TASK 23-28-45-400-001-A
Installation of the Attenuator-SATCOM
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 23-28-45-860-050-A ** ON A/C NOT FOR ALL
Subtask 23-28-45-420-050-A ** ON A/C NOT FOR ALL
Subtask 23-28-45-862-050-A ** ON A/C NOT FOR ALL Subtask 23-28-45-410-050-A ** ON A/C NOT FOR ALL
[Rev.9 from 2019]
2026.04.02 06:12:04 UTC
Installation of the Attenuator-SATCOM
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QDB1) | Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 128 | REAR AVIONIC COMPARTMENT |
| 825, 841 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-28-00-740-001-A | BITE Test of the Satellite Communication System |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 23-28-45-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE and the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE are in position at the access doors 841 and 825.
(2) Make sure that the access doors 841 and 825 are open.
(3) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 23-28-45-865-060-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE and the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE are in position at the access doors 841 and 825.
(2) Make sure that the access doors 841 and 825 are open.
(3) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | SATCOM | 102RV1 | K01 |
Subtask 23-28-45-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Attenuator
(1) Do an inspection of the component interfaces and the adjacent area.
(2) Make sure that the electrical connectors are clean and in the correct condition.
(3) Connect the attenuator (3) to the disconnected ends of the cable (4).
(4) Install the clamp (2) with the screw (1), the washers (6) and the nut (5).
14QDB1 Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - .
Subtask 23-28-45-865-061-A ** ON A/C NOT FOR ALL (1) Do an inspection of the component interfaces and the adjacent area.
(2) Make sure that the electrical connectors are clean and in the correct condition.
(3) Connect the attenuator (3) to the disconnected ends of the cable (4).
(4) Install the clamp (2) with the screw (1), the washers (6) and the nut (5).
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(5) Safety the cable (4) with B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 23-28-45-740-050-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | SATCOM | 102RV1 | K01 |
Subtask 23-28-45-862-050-A ** ON A/C NOT FOR ALL Subtask 23-28-45-410-050-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access doors 841 and 825.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access doors 841 and 825.
(3) Remove the access platform(s).
Attenuator (112RV1)