Removal of the Pressure Regulating Valve
TASK 21-63-52-000-001-A
Removal of the Pressure Regulating Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-63-52-861-050-A Subtask 21-63-52-865-050-A
Subtask 21-63-52-020-051-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:09:45 UTC
Removal of the Pressure Regulating Valve
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
MAKE SURE THAT THE COMPONENTS OF THE BLEED AIR SYSTEM ARE COOL. HOT COMPONENTS WILL BURN YOU.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
CAUTION:
BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
CAUTION:
DO NOT PUT YOUR WEIGHT ON THE DUCTS. IT IS VERY EASY TO BREAK THEM.
FIN: 14HK
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 21-63-52-861-050-A Subtask 21-63-52-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-63-52-941-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
C. Safety Precautions
(1) On the panel 30VU:
(a) Make sure that:
(2) On the HP and the LP ground connector put a warning notice in position to tell persons not to supply the ground air.
Subtask 21-63-52-010-050-A (1) On the panel 30VU:
(a) Make sure that:
- the APU BLEED pushbutton switch is in the off position (the ON legend is off) and,
- the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(2) On the HP and the LP ground connector put a warning notice in position to tell persons not to supply the ground air.
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the forward cargo-compartment door 825.
(2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panels at partition FR34 (Ref. AMM D/O 06-41-53-00), (Ref. AMM TASK 25-54-12-000-001).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the forward cargo-compartment door 825.
(2) Open the forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panels at partition FR34 (Ref. AMM D/O 06-41-53-00), (Ref. AMM TASK 25-54-12-000-001).
Subtask 21-63-52-020-051-B ** ON A/C NOT FOR ALL
A. Removal of the Pressure Regulating Valve
(1) Disconnect the electrical connectors (1), (2) and (3).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Disconnect the control tube (4) from the pressure regulating valve (30) and from the check valves [7270HM] and [7272HM]
(4) Disconnect the control tube (5) from the pressure regulating valve (30).
(5) Put the PLUG-BLANKING in each disconnected line end.
(6) Remove the nut (10), the washer (9), the screw (6), the washer (7) and disconnect the bonding strap (8).
(7) Remove the clamps (26) and (28) and the duct assembly (27).
(8) Remove and discard the O-ring (25).
(9) Put blanking plugs on the open ends of the duct flange (29) and the duct assembly (27).
(10) Hold the pressure regulating valve (30) and remove the clamp (31).
(11) Remove the pressure regulating valve (30) and the O-ring (25). Discard the O-ring (25).
(12) Put blanking plugs on the open ends of the duct flange (24) and the pressure regulating valve (30).
Subtask 21-63-52-020-051-C ** ON A/C NOT FOR ALL (1) Disconnect the electrical connectors (1), (2) and (3).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Disconnect the control tube (4) from the pressure regulating valve (30) and from the check valves [7270HM] and [7272HM]
(4) Disconnect the control tube (5) from the pressure regulating valve (30).
(5) Put the PLUG-BLANKING in each disconnected line end.
(6) Remove the nut (10), the washer (9), the screw (6), the washer (7) and disconnect the bonding strap (8).
(7) Remove the clamps (26) and (28) and the duct assembly (27).
(8) Remove and discard the O-ring (25).
(9) Put blanking plugs on the open ends of the duct flange (29) and the duct assembly (27).
(10) Hold the pressure regulating valve (30) and remove the clamp (31).
(11) Remove the pressure regulating valve (30) and the O-ring (25). Discard the O-ring (25).
(12) Put blanking plugs on the open ends of the duct flange (24) and the pressure regulating valve (30).
A. Removal of the Pressure Regulating Valve
(1) Disconnect the electrical connectors (1) and (2).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Disconnect the control tube (4) from the pressure regulating valve (30) and from the check valves [7270HM] and [7272HM]
(4) Disconnect the control tube (3) from the pressure regulating valve (30).
(5) Put the PLUG-BLANKING in each disconnected line end.
(6) Remove the nut (9), the washer (8), the screw (5), the washer (6) and disconnect the bonding strap (7).
(7) Remove the clamps (26) and (28) and the duct assembly (27).
(8) Remove and discard the O-ring (25).
(9) Put blanking plugs on the open ends of the duct flange (29) and the duct assembly (27).
(10) Hold the pressure regulating valve (30) and remove the clamp (31).
(11) Remove the pressure regulating valve (30) and the O-ring (25). Discard the O-ring (25).
(12) Put blanking plugs on the open ends of the duct flange (24) and the pressure regulating valve (30).
(1) Disconnect the electrical connectors (1) and (2).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Disconnect the control tube (4) from the pressure regulating valve (30) and from the check valves [7270HM] and [7272HM]
(4) Disconnect the control tube (3) from the pressure regulating valve (30).
(5) Put the PLUG-BLANKING in each disconnected line end.
(6) Remove the nut (9), the washer (8), the screw (5), the washer (6) and disconnect the bonding strap (7).
(7) Remove the clamps (26) and (28) and the duct assembly (27).
(8) Remove and discard the O-ring (25).
(9) Put blanking plugs on the open ends of the duct flange (29) and the duct assembly (27).
(10) Hold the pressure regulating valve (30) and remove the clamp (31).
(11) Remove the pressure regulating valve (30) and the O-ring (25). Discard the O-ring (25).
(12) Put blanking plugs on the open ends of the duct flange (24) and the pressure regulating valve (30).
Pressure Regulating Valve