W DOC AIRBUS | AMM A320F

Installation of the Zone Controller


TASK 21-63-34-400-001-A
Installation of the Zone Controller


ZONE: 121
FIN: 8HK ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
121
AVIONICS COMPARTMENT
811
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-63-00-710-004-A
Operational Test of the Cockpit and Cabin Temperature Control with CFDS/MCDU
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 21-63-34-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-63-34-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS24HKV20
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS13HKV19
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS22HKV18
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS11HKV17
Subtask 21-63-34-010-051-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the access door 811.
   (2) Make sure that the access door 811 is open.
4. Procedure
Subtask 21-63-34-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Zone Controller
F Zone Controller ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Install the zone controller (1) on its rack (3).
   (6) Push the zone controller (1) on its rack (3) to connect the electrical connectors (2).
   (7) Engage the nuts (4) on the lugs (5) and tighten.
Subtask 21-63-34-865-053-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS24HKV20
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS13HKV19
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS22HKV18
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS11HKV17
Subtask 21-63-34-710-050-A ** ON A/C NOT FOR ALL
C. Do an operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
5. Close-up
Subtask 21-63-34-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 811.
   (3) Remove the access platform(s).
Subtask 21-63-34-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:11:44 UTC