Operational Test of the Zone-Controller (Back Up Switching) via CFDS/MCDU
TASK 21-63-00-710-002-A
Operational Test of the Zone-Controller (Back Up Switching) via CFDS/MCDU
Refer to the MPD TASK: 216000-02
OPERATIONAL CHECK OF ZONE CONTROLLER (BACK UP SWITCHING) VIA CFDS/MCDU
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 21-63-00-865-057-A ** ON A/C NOT FOR ALL
Subtask 21-63-00-710-053-A ** ON A/C NOT FOR ALL
Subtask 21-63-00-860-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:42 UTC
Operational Test of the Zone-Controller (Back Up Switching) via CFDS/MCDU
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 216000-02
OPERATIONAL CHECK OF ZONE CONTROLLER (BACK UP SWITCHING) VIA CFDS/MCDU
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 21-63-00-865-057-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-63-00-860-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
4. Procedure(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 21-63-00-710-053-A ** ON A/C NOT FOR ALL
A. Operational Test of the Zone-Controller (Back Up Switching) via CFDS/MCDU
5. Close-up| ACTION | RESULT |
|---|---|
1.On the panel 122VU:
| On the ECAM upper display unit, (after apprx. 60 seconds):
|
| 2.On the ECAM control panel 11VU: | |
|
|
| | On the ECAM lower display unit:
|
3.On the panel 122vu:
| On the ECAM lower display unit:
|
| | On the ECAM upper display unit:
|
Subtask 21-63-00-860-051-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).