W DOC AIRBUS | AMM A320F

Zone Controller - Deactivation of the Hot-Air Pressure-Regulating Valve


TASK 21-63-00-040-004-A
Zone Controller - Deactivation of the Hot-Air Pressure-Regulating Valve


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: MAKE SURE THAT THE COMPONENTS OF THE BLEED AIR SYSTEM ARE COOL. HOT COMPONENTS WILL BURN YOU.
CAUTION: BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
ZONE: 121
FIN: 8HK ** ON A/C NOT FOR ALL
Task Summary
Access Test Specific Tools Mhr E/T Nb Men
YESNONO0.50.51
1. Reason for the Job
MMEL 21-63-01C
ZONE CONTROLLER CHANNEL
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
121
AVIONICS COMPARTMENT
191CB, 191DB, 825
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-54-12-000-001-A
Removal of the Forward Cargo-Compartment Partition
TASK 25-54-12-400-001-A
Installation of the Forward Cargo-Compartment Partition
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-003-A
Open the FWD or Aft Cargo-Compartment Door with the Hand Pump
TASK 52-30-00-860-004-A
Close the FWD or Aft Cargo-Compartment Door with the Hand Pump
3. Job Set-up
Subtask 21-63-00-861-060-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 21-63-00-941-064-A ** ON A/C NOT FOR ALL
B. Safety Precautions
   (1) In the cockpit, on AIR COND panel 30VU:
     (a) Make sure that the APU BLEED pushbutton switch is released (the OFF legend is on).
     (b) Make sure that the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
     (c) Make sure that the PACK 1 and the PACK 2 pushbutton switches are released (the OFF legends are on).
     (d) Make sure that the HOT AIR pushbutton switch is released (the OFF legend is on).
     (e) Put the WARNING NOTICE(S) in position to tell persons not to operate these pushbutton switches.
   (2) At access doors 191CB and 191DB:
     (a) On the LP and the HP ground connectors, put the WARNING NOTICE(S) in position to tell persons not to supply the ground air.
Subtask 21-63-00-010-054-A ** ON A/C NOT FOR ALL
C. Get Access
WARNING: DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS PRESSURIZED. A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED:
  • WILL CAUSE EXPLOSIVE DECOMPRESSION.
  • CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE AIRCRAFT OR EQUIPMENT.
   (1) Open forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
   (2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at forward cargo-compartment door 825.
   (3) Remove the access panel from partition FR 34 (Ref. AMM TASK 25-54-12-000-001).
Subtask 21-63-00-865-067-A ** ON A/C NOT FOR ALL
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS24HKV20
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS13HKV19
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS22HKV18
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS11HKV17
4. Procedure
Subtask 21-63-00-040-052-A ** ON A/C NOT FOR ALL
A. Deactivation of the Hot-Air Pressure-Regulating Valve
   (1) Turn the manual override lever (3) of the pressure regulating valve (2) in the closed position.
   (2) Disconnect the electrical connector 14HK-C (1) from the pressure regulating valve (2).
   (3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (4) Temporarily attach the disconnected electrical connector 14HK-C (1) to the aircraft structure.
5. Close-up
Subtask 21-63-00-410-054-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel at partition FR 34 (Ref. AMM TASK 25-54-12-400-001).
   (3) Remove the access platform(s).
   (4) Close forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
   (5) Remove the WARNING NOTICE(S).
   (6) Make an entry in the logbook.
Subtask 21-63-00-865-082-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS24HKV20
122VUAIR COND/ZONE TEMP CTL/28VDC/SYS13HKV19
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS22HKV18
122VUAIR COND/ZONE TEMP CTL/115VAC/SYS11HKV17
Subtask 21-63-00-862-057-A ** ON A/C NOT FOR ALL
C. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:42 UTC