Installation of the Turbine Bypass Valve
TASK 21-61-53-400-001-A
Installation of the Turbine Bypass Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 21-61-53-860-050-A
Subtask 21-61-53-420-050-A ** ON A/C NOT FOR ALL
Subtask 21-61-53-410-052-A
[Rev.10 from 2021]
2026.04.02 06:11:41 UTC
Installation of the Turbine Bypass Valve
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03QBD1) | Dry lubricant-General Assembly Graphite - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191KB, 192KB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | PACKING | AIPC 21-52-41-27-020 |
| 12 | SEAL | AIPC 21-52-41-27-035 |
| 14 | SEAL | AIPC 21-52-41-27-035 |
| 10 | PACKING | AIPC 21-52-41-27-055 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 21-61-00-710-001-A | Operational Test of the Pack Temperature-Control System |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 21-61-53-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that:
(a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002),
(b) The access panel is removed (Ref. AMM TASK 53-35-13-000-002).
(c) FOR [10HH] (VALVE-TURBINE BYPASS)
191KB.
(d) FOR [30HH] (VALVE-TURBINE BYPASS)
192KB.
Subtask 21-61-53-865-051-A (1) Make sure that:
(a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002),
(b) The access panel is removed (Ref. AMM TASK 53-35-13-000-002).
(c) FOR [10HH] (VALVE-TURBINE BYPASS)
191KB.
(d) FOR [30HH] (VALVE-TURBINE BYPASS)
192KB.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HH (VALVETURBINE BYPASS) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 30HH (VALVETURBINE BYPASS) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
Subtask 21-61-53-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Bypass Valve
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the removed seal and packings are in a good condition. If necessary replace the AIPC 21-52-41-27-020 PACKING (2), the AIPC 21-52-41-27-055 PACKING (10) and/or the AIPC 21-52-41-27-035 SEAL (14).
(3) Apply lubricant:
(4) Remove the blanking plugs from the disconnected line ends.
(5) Clean the component interfaces and the adjacent area.
(6) Put the seal (14) in position on the bypass valve (5).
(7) Put the bypass valve (5) in position in the pipe assembly (8).
(8) Put the packings (2) in position on the air cycle machine flange (6) and the air cycle machine (1).
(9) Put the packing (10 ) in position on the anti-ice valve (3).
(10) Put the bypass valve (5) together with the pipe assembly (8) in position.
(11) Install the clamps (7), (9) and (16) in position but do not tighten them at this time.
(12) Position the bypass valve (5) and the clamp (7).
(a) Actuator Body Radial Position
1 On bypass valve P/N 758A0000-02 and previous:
.
(14) Put the bonding strap (13) in position and install the screw (15), the washer (11) and the nut (12).
(15) TORQUE the nut (12) to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in )
(Ref. AMM TASK 20-28-00-912-802).
(16) Remove the blanking caps and connect the electrical connector (4).
(17) Make sure that the work area is clean and clear of tools and other items.
Subtask 21-61-53-420-050-B ** ON A/C NOT FOR ALL (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the removed seal and packings are in a good condition. If necessary replace the AIPC 21-52-41-27-020 PACKING (2), the AIPC 21-52-41-27-055 PACKING (10) and/or the AIPC 21-52-41-27-035 SEAL (14).
(3) Apply lubricant:
CAUTION:
USE ONLY THE SPECIFIED LUBRICANT TO LUBRICATE THE O-RINGS AND THE PACKINGS. OTHER LUBRICANTS CAN CAUSE SMOKE OR A SMELL IN THE CABIN WHEN THEY BECOME HOT.
(a) Apply a small quantity of Dry lubricant-General Assembly Graphite - (Material No.03QBD1) to the seal (14), the packings (2) and the packing (10). (4) Remove the blanking plugs from the disconnected line ends.
(5) Clean the component interfaces and the adjacent area.
(6) Put the seal (14) in position on the bypass valve (5).
(7) Put the bypass valve (5) in position in the pipe assembly (8).
(8) Put the packings (2) in position on the air cycle machine flange (6) and the air cycle machine (1).
(9) Put the packing (10 ) in position on the anti-ice valve (3).
(10) Put the bypass valve (5) together with the pipe assembly (8) in position.
(11) Install the clamps (7), (9) and (16) in position but do not tighten them at this time.
(12) Position the bypass valve (5) and the clamp (7).
(a) Actuator Body Radial Position
1 On bypass valve P/N 758A0000-02 and previous:
- make sure that when you look in a forward direction the bypass valve actuator body is in the 9 o'clock position (horizontal).
- make sure that when you look in a forward direction the bypass valve actuator body is between the 10 o'clock and 11 o'clock position.
This will make sure that the electrical connector (4) can be correctly installed.
- make sure that when you look in a rearward direction, the nut of the clamp (7) is in the 10 o'clock position.
This will make sure that the clamp (7) will not come in contact with the access panel 191KB (192KB).
. (14) Put the bonding strap (13) in position and install the screw (15), the washer (11) and the nut (12).
(15) TORQUE the nut (12) to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in )
(Ref. AMM TASK 20-28-00-912-802). (16) Remove the blanking caps and connect the electrical connector (4).
(17) Make sure that the work area is clean and clear of tools and other items.
A. Installation of the Bypass Valve
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the removed seal and the packings are in a good condition. If necessary, replace the AIPC 21-52-41-27-020 PACKING (2) and the AIPC 21-52-41-27-035 SEAL (12).
(3) Apply lubricant:
(4) Remove the blanking plugs from the disconnected line ends.
(5) Clean the component interfaces and the adjacent area.
(6) Put the seal (12) in position on the bypass valve (4).
(7) Put the bypass valve (4) in position in the pipe assembly (7).
(8) Put the packings (2) in position on the air cycle machine flange (5) and the air cycle machine (1).
(9) Put the bypass valve (4) together with the pipe assembly (7) in position.
(10) Put the clamps (6) and (8) in position but do not tighten them at this time.
(11) Put the bypass valve (4) and the clamp (6) in position:
(a) Actuator body radial position:
1 At the bypass valve:
.
(13) Put the bonding strap (11) in position and install the screw (13), the washer (10) and the nut (9).
(14) TORQUE the nut (9) to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in )
(Ref. AMM TASK 20-28-00-912-802).
(15) Remove the blanking caps and connect the electrical connector (3).
(16) Make sure that the work area is clean and clear of tools and other items.
Subtask 21-61-53-865-054-A (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the removed seal and the packings are in a good condition. If necessary, replace the AIPC 21-52-41-27-020 PACKING (2) and the AIPC 21-52-41-27-035 SEAL (12).
(3) Apply lubricant:
CAUTION:
USE ONLY THE SPECIFIED LUBRICANT TO LUBRICATE THE O-RINGS AND THE PACKINGS. OTHER LUBRICANTS CAN CAUSE SMOKE OR A SMELL IN THE CABIN WHEN THEY BECOME HOT.
(a) Apply a small quantity of Dry lubricant-General Assembly Graphite - (Material No.03QBD1) to the seal (12) and the packings (2). (4) Remove the blanking plugs from the disconnected line ends.
(5) Clean the component interfaces and the adjacent area.
(6) Put the seal (12) in position on the bypass valve (4).
(7) Put the bypass valve (4) in position in the pipe assembly (7).
(8) Put the packings (2) in position on the air cycle machine flange (5) and the air cycle machine (1).
(9) Put the bypass valve (4) together with the pipe assembly (7) in position.
(10) Put the clamps (6) and (8) in position but do not tighten them at this time.
(11) Put the bypass valve (4) and the clamp (6) in position:
(a) Actuator body radial position:
1 At the bypass valve:
- Make sure that when you look in the forward direction, the bypass valve actuator body is between the 10 o'clock and 11 o'clock position.
- This will make sure that the electrical connector (3) can be correctly installed.
- Make sure that when you look in the rear view, the nut of the clamp (6) is in the 10 o'clock position.
- This will make sure that the clamp (6) does not touch the access panel 191KB ( 192KB).
. (13) Put the bonding strap (11) in position and install the screw (13), the washer (10) and the nut (9).
(14) TORQUE the nut (9) to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in )
(Ref. AMM TASK 20-28-00-912-802). (15) Remove the blanking caps and connect the electrical connector (3).
(16) Make sure that the work area is clean and clear of tools and other items.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-61-53-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HH (VALVETURBINE BYPASS) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 30HH (VALVETURBINE BYPASS) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
C. Test
(1) Do the pre-conditioning through the HP ground connector or with the APU (Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of the bypass valve connections.
(4) Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001).
5. Close-up(1) Do the pre-conditioning through the HP ground connector or with the APU (Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of the bypass valve connections.
NOTE: Leaks are not permitted.
(3) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001). (4) Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001).
Subtask 21-61-53-410-052-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel (Ref. AMM TASK 53-35-13-400-002).
(a) FOR [10HH] (VALVE-TURBINE BYPASS)
191KB.
(b) FOR [30HH] (VALVE-TURBINE BYPASS)
192KB.
Subtask 21-61-53-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel (Ref. AMM TASK 53-35-13-400-002).
(a) FOR [10HH] (VALVE-TURBINE BYPASS)
191KB.
(b) FOR [30HH] (VALVE-TURBINE BYPASS)
192KB.
Bypass Valve