W DOC AIRBUS | AMM A320F

Removal of the Turbine Bypass Valve


TASK 21-61-53-000-001-A
Removal of the Turbine Bypass Valve


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the bypass valves 10HH and 30HH.
FIN: 10HH
FIN: 30HH
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
F Bypass Valve ** ON A/C NOT FOR ALL
F Bypass Valve ** ON A/C NOT FOR ALL
F Bypass Valve ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 21-61-53-861-050-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-61-53-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HH (VALVETURBINE BYPASS)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 30HH (VALVETURBINE BYPASS)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-61-53-010-050-A
C. Get Access
   (1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002).
     (a) FOR [10HH] (VALVE-TURBINE BYPASS)
191KB.
     (b) FOR [30HH] (VALVE-TURBINE BYPASS)
192KB.
4. Procedure
Subtask 21-61-53-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Bypass Valve
   (1) Disconnect the electrical connector (4).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Remove the nut (12), the washer (11), the screw (15) and disconnect the bonding strap (13).
   (4) Remove the clamp (16).
   (5) Hold the bypass valve (5) and remove the clamps (7) and (9).
   (6) Remove the bypass valve (5) together with the pipe assembly (8).
   (7) Remove the bypass valve (5) from the pipe assembly (8).
   (8) Remove the packings (2), the seal (14) and the packing (10).
   (9) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-61-53-020-051-B ** ON A/C NOT FOR ALL
A. Removal of the Bypass Valve
   (1) Disconnect the electrical connector (3).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Remove the nut (9), the washer (10), the screw (13) and disconnect the bonding strap (11).
   (4) Hold the bypass valve (4) and remove the clamps (6) and (8).
   (5) Remove the bypass valve (4) together with the pipe assembly (7).
   (6) Remove the bypass valve (4) from the pipe assembly (7).
   (7) Remove the packings (2) and the seal (12).
   (8) Put the PLUG-BLANKING in each disconnected line end.