W DOC AIRBUS | AMM A320F

Removal of the Ram-Air Outlet


TASK 21-61-52-000-003-A
Removal of the Ram-Air Outlet


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the left ram-air outlet and the right ram-air outlet.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191KB, 192KB, 195AB, 196AB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
3. Job Set-up
Subtask 21-61-52-861-051-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-61-52-865-060-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 9HH
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 29HH
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-61-52-010-054-A
C. Get Access
   (1) Remove the access panel/s (Ref. AMM TASK 53-35-13-000-002).
     (a) For the left ram-air outlet,
     (b) For the right ram-air outlet,
Subtask 21-61-52-941-050-A
D. Safety Precautions
   (1) On the panel 30VU:
     (a) Make sure that the APU BLEED and the ENG BLEED/1(2) pushbutton switches are released.
     (b) Put a warning notice to tell persons not to operate these pushbutton switches.
   (2) On the HP ground connector put a warning notice to tell persons not to supply the ground air.
4. Procedure
Subtask 21-61-52-020-052-B
A. Removal of the Ram-Air Outlet
   (1) Remove the clamp (2) and disconnect the sleeve (1).
   (2) Remove the screws (6) and the washers (7).
   (3) Hold the ram-air outlet (5) and:
     (a) For the left ram-air outlet,
       1 Remove the bolts (12), (13), (15), (16) and (18) and the washers (4).
NOTE: Identify the bolts for use in the installation procedure.
     (b) For the right ram-air outlet,
       1 Remove the bolts (12), (14), (15), (17) and (18) and the washers (4).
NOTE: Identify the bolts for use in the installation procedure.
   (4) Put the PLUG-BLANKING in each disconnected line end.
   (5) Remove the ram-air outlet (5).
[Rev.10 from 2021] 2026.04.02 06:48:33 UTC