W DOC AIRBUS | AMM A320F

Installation of the Air Inlet


TASK 21-61-51-400-002-A
Installation of the Air Inlet


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 20HM
FIN: 21HM
FIN: 28HH
FIN: 8HH
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06AEA1)
Polysulfide Sealant-Low Adhesion Brushable -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191BB, 191KB, 192FB, 192KB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 21-52-42-000-001-A
Removal of the Water Injector
TASK 21-52-42-400-001-A
Installation of the Water Injector
TASK 21-61-00-710-001-A
Operational Test of the Pack Temperature-Control System
TASK 21-61-51-000-001-A
Removal of the Air-Inlet Flap Actuator
TASK 21-61-51-400-001-A
Installation of the Air-Inlet Flap Actuator
TASK 21-61-51-820-001-A
Adjustment of the Air Inlet Flap
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
F Air Inlet - Component Location ** ON A/C NOT FOR ALL
F Air Inlet - Component Location ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 21-61-51-860-054-A
A. Aircraft Maintenance Configuration
   (1) Make sure that:
     (a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
     (b) On the panel 30VU:
  • the APU BLEED and the ENG BLEED/1(2) pushbutton switches are released and,
  • the warning notice to tell persons not to operate these pushbutton switches is in position.
     (c) On the HP ground connector the warning notice to tell persons not to supply the ground air is in position.
     (d) The access panels are removed (Ref. AMM TASK 53-35-13-000-002).
       1 For the Left air inlet,
  • 191BB and 191KB.
       2 For the Right air inlet,
  • 192FB and 192KB.
Subtask 21-61-51-865-054-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
4. Procedure
Subtask 21-61-51-560-050-A
A. Preparation of the Replacement Component
   (1) From the removed air inlet:
     (a) Remove the water injector (Ref. AMM TASK 21-52-42-000-001).
     (b) Remove the air-inlet flap actuator (Ref. AMM TASK 21-61-51-000-001).
   (2) On the replacement air inlet:
     (a) Install the water injector (Ref. AMM TASK 21-52-42-400-001).
     (b) Install the air-inlet flap actuator (Ref. AMM TASK 21-61-51-400-001).
Subtask 21-61-51-420-051-B ** ON A/C NOT FOR ALL
B. Installation of the Air Inlet
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Install the air inlet:
     (a) For the Left air inlet,
       1 Remove the protective covers from the air inlet (3) and the bellows (5).
       2 Put the air inlet (3) in position and install the washers (1) and the screws (2).
       3 Put the support rod (19) in position in the bracket (23) and install the bolt (18), the washer (20) and the nut (21).
       4 Put the support rods (25) and (29) in position in the bracket (28) and install the bolts (24), the washers (26) and the nuts (27).
       5 Put the support rod (38) in position in the bracket (37) and install the bolt (24), the washer (26) and the nut (27).
NOTE: If it is necessary to replace any, or all of the support rods then you must adjust the support rod/s to make sure that you can install the access panels which are adjacent to the air inlet.
       6 Remove the temporary attachment from the electrical cable (39).
       7 Put the clamps (15) in position on the electrical cable (39) and install the screws (17), the spacers (16), the washers (14) and the nuts (13).
       8 Put the clamps (32) in position on the electrical cable (39) and the clamps (35) in position on the bonding strap (56).
       9 Put the spacers (36) in position and install the bolts (34), the washers (31) and the clamps (32) and (35).
       10 Put the spacers (33) in position and install the bolts (30) and the washers (31) and the clamps (32).
       11 Put the cross beam (7) in position in the brackets (23) and (11) and install the quick-release pins (22) and (9).
       12 Put the clamp (4) and the bellows (5) in position on the air inlet (3).
       13 Make sure that the bellows (5) is in the correct position.
       14 TORQUE the clamp (4) to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in ) T.
       15 Remove the blanking caps from the disconnected electrical connectors.
       16 Make sure that all the electrical connections are clean and in the correct condition.
       17 Connect the electrical connector (58).
       18 Remove the blanking plugs and connect the water injector connector (57).
       19 Make sure that the work area is clean and clear of tools and other items.
     (b) For the Right air inlet,
       1 Remove the protective covers from the air inlet (6) and the bellows (5).
       2 Put the air inlet (6) in position and install the washers (1) and the screws (2).
       3 Put the support rod (47) in position in the bracket (45) and install the bolt (46), the washer (48) and the nut (49).
       4 Put the support rods (54) and (51) in position on the bracket (45) and install the bolt (50), the washer (52) and the nut (53).
       5 Put the support rods (41) and (42) in position in the bracket (43) and install the bolts (24), the washers (26) and the nuts (27).
       6 Put the support rod (40) in position in the bracket (41) and install the bolt (24), the washer (26) and the nut (27).
NOTE: If it is necessary to replace any, or all of the support rods then you must adjust the support rod/s to make sure that you can install the access panels which are adjacent to the air inlet.
       7 Remove the temporary attachment from the electrical cable (55).
       8 Put the clamp (15) in position on the electrical cable (55) and install the screw (17), the spacers (16), the washer (14) and the nut (13).
       9 Put the clamps (32) in position on the electrical cable (55) and the clamps (35) in position on the bonding strap (56).
       10 Put the spacers (36) in position and install the bolts (34), the washers (31) and the clamps (32) and (35).
       11 Put the spacers (33) in position and install the bolts (30) and the washers (31) and the clamps (32).
       12 Put the cross beam (8) in position in the brackets (45) and (12) and install the quick-release pins (44) and (10).
       13 Put the clamp (4) and the bellows (5) in position on the air inlet (6).
       14 Make sure that the bellows (5) is in the correct position.
       15 TORQUE the clamp (4) to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in )
T.
       16 Remove the blanking caps from the disconnected electrical connectors.
       17 Make sure that all the electrical connections are clean and in the correct condition.
       18 Connect the electrical connector (58).
       19 Remove the blanking plugs and connect the water injector connector (57).
       20 Make sure that the work area is clean and clear of tools and other items.
   (4) Do the adjustment of the ram air-inlet flap (
Ref. AMM TASK 21-61-51-820-001).
Subtask 21-61-51-420-051-C ** ON A/C NOT FOR ALL
B. Installation of the Air Inlet
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Install the air inlet:
     (a) For the Left air inlet,
       1 Remove the protective covers from the air inlet (3) and the bellows (5).
       2 Put the air inlet (3) in position and install the washers (1) and the screws (2).
       3 Put the support rod (19) in position in the bracket (23) and install the bolt (18), the washer (20) and the nut (21).
       4 Apply Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) between the contact surfaces of the bracket (60) and the brackets (28) and (37).
       5 Apply a small quantity of Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the bolts (27).
       6 Put the support rods (25) and (29) in position in the bracket (28) and install the bolts (24), the washers (26), the bushing (59), the bracket (60) and the nuts (27).
       7 Put the support rod (38) in position in the bracket (37) and install the bolt (24), the washers (26), the bushing (59), the bracket (60) and the nut (27).
NOTE: If it is necessary to replace any, or all of the support rods then you must adjust the support rod/s to make sure that you can install the access panels which are adjacent to the air inlet.
       8 Remove the temporary attachment from the electrical cable (39).
       9 Put the clamps (15) in position on the electrical cable (39) and install the screws (17), the spacers (16), the washers (14) and the nuts (13).
       10 Put the clamps (32) in position on the electrical cable (39) and the clamps (35) in position on the bonding strap (56).
       11 Put the spacers (36) in position and install the bolts (34), the washers (31) and the clamps (32) and (35).
       12 Put the spacers (33) in position and install the bolts (30) and the washers (31) and the clamps (32).
       13 Put the cross beam (7) in position in the brackets (23) and (11) and install the quick-release pins (22) and (9).
       14 Put the clamp (4) and the bellows (5) in position on the air inlet (3).
       15 Make sure that the bellows (5) is in the correct position.
       16 TORQUE the clamp (4) to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in ) T.
       17 Remove the blanking caps from the disconnected electrical connectors.
       18 Make sure that all the electrical connections are clean and in the correct condition.
       19 Connect the electrical connector (58).
       20 Remove the blanking plugs and connect the water injector connector (57).
       21 Remove the support tool between IGGS pallet (8YA) and frame C34/C35.7.
       22 Make sure that the work area is clean and clear of tools and other items.
     (b) For the Right air inlet,
       1 Remove the protective covers from the air inlet (6) and the bellows (5).
       2 Put the air inlet (6) in position and install the washers (1) and the screws (2).
       3 Put the support rod (47) in position in the bracket (45) and install the bolt (46), the washer (48) and the nut (49).
       4 Put the support rods (54) and (51) in position on the bracket (45) and install the bolt (50), the washer (52) and the nut (53).
       5 Put the support rods (41) and (42) in position in the bracket (43) and install the bolts (24), the washers (26) and the nuts (27).
       6 Put the support rod (40) in position in the bracket (41) and install the bolt (24), the washer (26) and the nut (27).
NOTE: If it is necessary to replace any, or all of the support rods then you must adjust the support rod/s to make sure that you can install the access panels which are adjacent to the air inlet.
       7 Remove the temporary attachment from the electrical cable (55).
       8 Put the clamp (15) in position on the electrical cable (55) and install the screw (17), the spacers (16), the washer (14) and the nut (13).
       9 Put the clamps (32) in position on the electrical cable (55) and the clamps (35) in position on the bonding strap (56).
       10 Put the spacers (36) in position and install the bolts (34), the washers (31) and the clamps (32) and (35).
       11 Put the spacers (33) in position and install the bolts (30) and the washers (31) and the clamps (32).
       12 Put the cross beam (8) in position in the brackets (45) and (12) and install the quick-release pins (44) and (10).
       13 Put the clamp (4) and the bellows (5) in position on the air inlet (6).
       14 Make sure that the bellows (5) is in the correct position.
       15 TORQUE the clamp (4) to between 0.26 and 0.22 m.daN (23.01 and 19.47 lbf.in )
T.
       16 Remove the blanking caps from the disconnected electrical connectors.
       17 Make sure that all the electrical connections are clean and in the correct condition.
       18 Connect the electrical connector (58).
       19 Remove the blanking plugs and connect the water injector connector (57).
       20 Make sure that the work area is clean and clear of tools and other items.
   (4) Do the adjustment of the ram air-inlet flap (
Ref. AMM TASK 21-61-51-820-001).
Subtask 21-61-51-865-074-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 8HH (P1 RAM AIR IN ACTUATOR)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 28HH (P2 RAM AIR IN ACTUATOR)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-61-51-710-051-A
D. Do the operational test of the pack temperature control system (Ref. AMM TASK 21-61-00-710-001).
5. Close-up
Subtask 21-61-51-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panels (Ref. AMM TASK 53-35-13-400-002).
     (a) For the Left air inlet,
     (b) For the Right air inlet,
Subtask 21-61-51-862-052-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).