W DOC AIRBUS | AMM A320F

Installation of the Solenoid Valve


TASK 21-61-41-400-003-A
Installation of the Solenoid Valve


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the solenoid valves 25HH and 40HH.
FIN: 10HM ** ON A/C NOT FOR ALL
FIN: 11HM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.915 and 0.9 m.daN (80.97 and 79.65 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03PBB1)
Lubricant-Anti Seize High Temp. -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191KB, 192KB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-33-21-618-001-A-01
Pre-conditioning through the HP Ground Connection
TASK 12-33-21-618-001-A-02
Pre-conditioning with the APU
TASK 21-61-00-710-001-A
Operational Test of the Pack Temperature-Control System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-61-41-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the access panel(s) are removed (Ref. AMM TASK 53-35-13-000-002).
     (a) FOR 25HH
     (b) FOR 40HH
Subtask 21-61-41-865-067-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM (PACK 1AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
4. Procedure
Subtask 21-61-41-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Solenoid Valve
   (1) Put the solenoid valve (5) in position and install the screw (4), the washer (6), and the nut (7).
   (2) Remove the blanking plugs from the disconnected line ends.
   (3) Apply a small quantity of Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threaded parts of the connectors (2) and (3).
   (4) At the solenoid valve (5), install the sense line connectors (2) and (3).
   (5) TORQUE the sense line connectors (2) and (3) to between 0.915 and 0.9 m.daN (80.97 and 79.65 lbf.in ) T.
   (6) Remove the blanking caps and connect the electrical connector (1).
Subtask 21-61-41-710-052-A ** ON A/C NOT FOR ALL
B. Leak and Operational Test of the Sense Lines Assembly
   (1) Do the pre-conditioning through the HP ground connector or with the APU (
Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001).
   (2) Do a leak check of the sense line connectors (2) and (3) at the solenoid valve (5).
NOTE: Leaks are not permitted.
   (3) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001).
   (4) Do the operational test of the pack temperature control system (Ref. AMM TASK 21-61-00-710-001).
5. Close-up
Subtask 21-61-41-410-054-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002).
     (a) FOR 25HH
     (b) FOR 40HH
Subtask 21-61-41-862-052-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:39 UTC