W DOC AIRBUS | AMM A320F

Installation of the Anti-Ice Valve Sense-Lines Assembly


TASK 21-61-41-400-002-A
Installation of the Anti-Ice Valve Sense-Lines Assembly


FIN: 10HM ** ON A/C NOT FOR ALL
FIN: 11HM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.915 and 0.9 m.daN (80.97 and 79.65 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03PBB1)
Lubricant-Anti Seize High Temp. -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [10HM] (PACK 1-AIR CONDITIONING)
191BB, 191KB
FOR [11HM] (PACK 2-AIR CONDITIONING)
192FB, 192KB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-33-21-618-001-A-01
Pre-conditioning through the HP Ground Connection
TASK 12-33-21-618-001-A-02
Pre-conditioning with the APU
TASK 21-61-00-710-001-A
Operational Test of the Pack Temperature-Control System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-61-41-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the access panel(s) are removed (Ref. AMM TASK 53-35-13-000-002).
     (a) FOR [10HM] (PACK 1-AIR CONDITIONING)
     (b) FOR [11HM] (PACK 2-AIR CONDITIONING)
Subtask 21-61-41-865-064-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM (PACK 1AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
4. Procedure
Subtask 21-61-41-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Sense Lines Assembly
   (1) Remove the blanking plugs from the disconnected line ends.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Apply a small quantity of Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threaded parts of the connectors (2), (4), (5), (6), (7), (11), (12) and (13).
   (4) Put the sense lines assembly in position.
   (5) At the condensor (14) install the sense line connectors (11), (12), and (13).
   (6) At the air cycle machine (1) install the sense line connector (2).
   (7) At the anti-ice valve (3) install the sense line connectors (4), (5), (6) and (7).
   (8) TORQUE the sense line connectors (2), (4), (5), (6), (7), (11), (12) and (13) to between 0.915 and 0.9 m.daN (80.97 and 79.65 lbf.in ) T.
Subtask 21-61-41-420-051-B ** ON A/C NOT FOR ALL
A. Installation of the Sense Lines Assembly
   (1) Remove the blanking plugs from the disconnected line ends.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Apply a small quantity of Lubricant-Anti Seize High Temp. - (Material No.
03PBB1) to the threaded parts of the connectors (2), (4), (6), (7), (8), (9), (10), (11), (12) and (13).
   (4) Put the sense lines assembly in position.
   (5) At the condensor (14) install the sense line connectors (11), (12), and (13).
   (6) At the air cycle machine (1) install the sense line connector (2).
   (7) At the anti-ice valve (3) install the sense line connectors (7), (8), (9) and (10).
   (8) At the solenoid (5) install the sense line connectors (4) and (6).
   (9) TORQUE the sense line connectors (2), (4), (5), (6), (7), (8), (9), (10), (11), (12) and (13) to between 0.915 and 0.9 m.daN (80.97 and 79.65 lbf.in ) T.
Subtask 21-61-41-865-065-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM (PACK 1AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
Subtask 21-61-41-710-051-A ** ON A/C NOT FOR ALL
C. Leak and Operational Test of the Sense Lines Assembly
   (1) Do the pre-conditioning through the HP ground connector or with the APU (
Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001).
   (2) Do a leak check of the anti-ice valve sense line connections at the anti-ice valve (7), the air cycle machine (2) and the condensor (7).
NOTE: Leaks are not permitted.
   (3) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) (Ref. AMM TASK 12-33-21-618-001).
   (4) Do the operational test of the pack temperature control system (Ref. AMM TASK 21-61-00-710-001).
5. Close-up
Subtask 21-61-41-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002).
     (a) FOR [10HM] (PACK 1-AIR CONDITIONING)
     (b) FOR [11HM] (PACK 2-AIR CONDITIONING)
Subtask 21-61-41-862-051-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:39 UTC