Removal of the Pack Controller
TASK 21-61-34-000-001-A
Removal of the Pack Controller
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-61-34-861-050-A ** ON A/C NOT FOR ALL Subtask 21-61-34-865-050-A ** ON A/C NOT FOR ALL
Subtask 21-61-34-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:38 UTC
Removal of the Pack Controller
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121 | AVIONICS COMPARTMENT |
| 122 | AVIONICS COMPARTMENT |
| 811 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
Subtask 21-61-34-861-050-A ** ON A/C NOT FOR ALL Subtask 21-61-34-865-050-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-61-34-010-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 7HH (P1 CONTROLLER) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| FOR FIN: 27HH (P2 CONTROLLER) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
C. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position at the access door 811.
(2) Open the access door 811.
4. Procedure(1) Put the ACCESS PLATFORM 1M(3 FT) in position at the access door 811.
(2) Open the access door 811.
Subtask 21-61-34-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Pack Controller
(1) Loosen the nuts (4).
(2) Lower the nuts (4).
(3) Pull the pack controller (1) on its rack (3) to disconnect the electrical connectors (2).
(4) Remove the pack controller (1) from its rack (3).
(5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(1) Loosen the nuts (4).
(2) Lower the nuts (4).
(3) Pull the pack controller (1) on its rack (3) to disconnect the electrical connectors (2).
(4) Remove the pack controller (1) from its rack (3).
(5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
Pack Controller