W DOC AIRBUS | AMM A320F

Installation of the Sensor Duct


TASK 21-58-61-400-803-A
Installation of the Sensor Duct


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS.
CAUTION: BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
ZONE: 191
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06LDG2)
Non Hardening Jointing Putty-High Temp. Area - Structure
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191
AIR CONDITIONING COMPT AND FAIRINGS
191CB, 191DB, 191KB, 192KB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
6
SEAL
AIPC 21-58-03-01-450
6
SEAL
AIPC 21-58-03-01-460
17
PACKING
AIPC 21-58-54-01-220
6
SEAL
AIPC 21-58-83-01-660
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 20-28-00-912-803-A
Bonding Surface Preparation
TASK 21-58-00-710-002-A
Operational Test of the Conditioned Service Air System with Bleed Air
TASK 21-58-11-400-001-A
Installation of the Duct Temperature Sensor
TASK 21-58-12-400-001-A
Installation of the Pressure Sensor
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
F Sensor Duct ** ON A/C NOT FOR ALL
F Sensor Duct ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 21-58-61-860-052-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 21-58-61-865-062-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 21-58-61-941-055-A ** ON A/C NOT FOR ALL
C. Safety Precautions
   (1) In the cockpit, on AIR COND panel 30VU:
     (a) Make sure that the APU BLEED pushbutton switch is released (the OFF legend is on).
     (b) Make sure that the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
     (c) Make sure that the PACK 1 and the PACK 2 pushbutton switches are released (the OFF legends are on).
     (d) Make sure that the HOT AIR pushbutton switch is released (the OFF legend is on).
     (e) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate these pushbutton switches.
   (2) At access doors 191CB and 191DB:
     (a) On the LP and the HP ground connectors, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
Subtask 21-58-61-010-056-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) in position at zone 191.
   (2) Make sure that access panel(s) 191KB and/or 192KB is (are) removed (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-58-61-865-056-A
DELETED
4. Procedure
Subtask 21-58-61-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the Sensor Duct
   (1) Clean the component interfaces and the adjacent area.
   (2) Do a visual inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
   (5) Remove the PLUG-BLANKING from each disconnected line end.
   (6) Apply a small quantity of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the new AIPC 21-58-54-01-220 PACKING (17).
   (7) Put the packing (17) in position on the sensor duct (10).
   (8) Put the sensor duct (10) in position on the temperature control module (1).
   (9) Install the washers (16), the screws (15) and the nuts (18).
   (10) Tighten the nuts (18).
   (11) Install the washers (12), the screws (19) and the nuts (11).
   (12) Tighten the nuts (11).
   (13) Measure the value of dimension A:
  • If the value of dimension A is between 86 mm (3.39 in.) and 87 mm (3.43 in.), install seal (7) 3960-1011.
  • If the value of dimension A is between 85 mm (3.35 in.) and 86 mm (3.39 in.), install seal (7) 3960-1012.
  • If the value of dimension A is between 84 mm (3.31 in.) and 85 mm (3.35 in.), install seal (7) 3960-1013.
   (14) Make sure that the value of dimension of B is between 93 mm (3.66 in.) and 95 mm (3.74 in.).
   (15) Make sure that the value of dimension of C is between 135.5 mm (5.33 in.) and 137.5 mm (5.41 in.).
   (16) Install a new
AIPC 21-58-03-01-450 SEAL (6) or AIPC 21-58-03-01-460 SEAL (6) or AIPC 21-58-83-01-660 SEAL (6) between the ducts (4) and (10).
   (17) Install the seal (7) between the ducts (4) and (10).
   (18) Install the screws (2), washers (3), bonding strap (5) and nuts (9).
   (19) Tighten the nuts (9).
   (20) Do the electrical resistance measurement and the final protection of the bonding point(s)
(
Ref. AMM TASK 20-28-00-912-802).
   (21) Install the pressure sensor (14) (Ref. AMM TASK 21-58-12-400-001).
   (22) Install the duct temperature sensor (13) (Ref. AMM TASK 21-58-11-400-001).
Subtask 21-58-61-865-063-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 21-58-61-865-057-A
DELETED
Subtask 21-58-61-710-052-A ** ON A/C NOT FOR ALL
D. Leak Test
WARNING: PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
   (1) Do the two subsequent steps at the same time.
NOTE: Two persons are necessary to do these steps.
     (a) Do the operational test of the conditioned service air system with bleed air (Ref. AMM TASK 21-58-00-710-002).
     (b) Examine the sensor duct (10) for signs of air leakage.
   (2) If necessary, repair the leak.
5. Close-up
Subtask 21-58-61-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the removed access panel(s) 191KB and/or 192KB (Ref. AMM TASK 53-35-13-400-002).
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the access platform(s).
Subtask 21-58-61-862-053-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).