Installation of the Temperature Control Module
TASK 21-58-54-400-001-A
Installation of the Temperature Control Module
Self explanatory
2. Job Set-up Information
A. Expendable Parts
B. Referenced Information
3. Procedure
Subtask 21-58-54-420-050-B ** ON A/C NOT FOR ALL
Subtask 21-58-54-942-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:08:06 UTC
Installation of the Temperature Control Module
FIN: 110HW ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Expendable Parts
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | BUSHING | AIPC 21-58-03-01-560 |
| 7 | BRACKET | AIPC 21-58-03-01-570 |
| 1 | GASKET | AIPC 21-58-03-01-580 |
| 7 | GASKET | AIPC 21-58-03-01-590 |
| 1 | GASKET | AIPC 21-58-83-01-590 |
| 7 | GASKET | AIPC 21-58-83-01-600 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 20-28-00-912-803-A | Bonding Surface Preparation |
| TASK 21-52-41-400-001-A | Installation of the Air Conditioning Pack |
Subtask 21-58-54-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the Temperature Control Module
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
(3) Put a new AIPC 21-58-03-01-570 BRACKET (7) or AIPC 21-58-03-01-590 GASKET (7) or AIPC 21-58-83-01-600 GASKET (7) and the temperature control module (9) in position on the heat exchanger (2).
(4) Install the bolts (6), the washers (10) and the nuts (11).
(5) Tighten the nuts (11).
(6) Install the plenum (17) as follows:
(a) Put a new AIPC 21-58-03-01-560 BUSHING (1) or AIPC 21-58-03-01-580 GASKET (1) or AIPC 21-58-83-01-590 GASKET (1) and the plenum (17) in position on the heat exchanger (2).
(b) Install the bolts (3), the washers (12) and the nuts (13).
(c) Tighten the nuts (13).
(d) Prepare the surface of the bonding point(s) (Ref. AMM TASK 20-28-00-912-803).
(e) Put the bonding straps (4), (8), (16) and (18) in position and install the bolts (5), the washers (15) and nuts (14).
(f) Tighten the nuts (14).
(g) Do the electrical resistance measurement and the final protection of the bonding point(s) (Ref. AMM TASK 20-28-00-912-802).
(7) Remove the PLUG-BLANKING from each disconnected line end.
(8) Install the air conditioning pack (Ref. AMM TASK 21-52-41-400-001).
Subtask 21-58-54-420-050-A (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
(3) Put a new AIPC 21-58-03-01-570 BRACKET (7) or AIPC 21-58-03-01-590 GASKET (7) or AIPC 21-58-83-01-600 GASKET (7) and the temperature control module (9) in position on the heat exchanger (2).
(4) Install the bolts (6), the washers (10) and the nuts (11).
(5) Tighten the nuts (11).
(6) Install the plenum (17) as follows:
(a) Put a new AIPC 21-58-03-01-560 BUSHING (1) or AIPC 21-58-03-01-580 GASKET (1) or AIPC 21-58-83-01-590 GASKET (1) and the plenum (17) in position on the heat exchanger (2).
(b) Install the bolts (3), the washers (12) and the nuts (13).
(c) Tighten the nuts (13).
(d) Prepare the surface of the bonding point(s) (Ref. AMM TASK 20-28-00-912-803).
(e) Put the bonding straps (4), (8), (16) and (18) in position and install the bolts (5), the washers (15) and nuts (14).
(f) Tighten the nuts (14).
(g) Do the electrical resistance measurement and the final protection of the bonding point(s) (Ref. AMM TASK 20-28-00-912-802).
(7) Remove the PLUG-BLANKING from each disconnected line end.
(8) Install the air conditioning pack (Ref. AMM TASK 21-52-41-400-001).
DELETED
4. Close-upSubtask 21-58-54-942-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(1) Make sure that the work area is clean and clear of tools and other items.
Temperature Control Module