W DOC AIRBUS | AMM A320F

Installation of the Ozone Converter Assy


TASK 21-58-42-400-001-A
Installation of the Ozone Converter Assy


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS.
FIN: 5101HM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.38 and 0.28 m.daN (33.63 and 24.78 lbf.in ) T
No specific
Torque wrench: range to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T
No specific
Torque wrench: range to between 0.57 and 0.51 m.daN (50.44 and 45.13 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191BB
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
2
SEAL
AIPC 21-58-03-01-350
10
SEAL
AIPC 21-58-03-01-360
10
SEAL
AIPC 21-58-83-01-060
2
SEAL
AIPC 21-58-83-01-200
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 21-58-00-710-002-A
Operational Test of the Conditioned Service Air System with Bleed Air
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-58-42-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) On the panel 30VU, make sure that:
  • The APU BLEED pushbutton switch is in the off position (the ON legend is off).
  • The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
  • A warning notice is in position to tell persons not to operate these pushbutton switches.
   (3) On the HP ground connector, make sure that a warning notice is in position to tell persons not to supply the ground air.
   (4) Make sure that an access platform is in position at zone 191.
   (5) Make sure that the access panel 191BB is removed (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-58-42-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
4. Procedure
Subtask 21-58-42-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Ozone Converter Assembly
F Ozone Converter (5101HM) ** ON A/C NOT FOR ALL
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Remove the PLUG-BLANKING from each disconnected line end.
   (4) Make sure that a person holds the ozone converter (16) while you install it.
   (5) Put the bearing shells (14), (15) and (18), (19) in position.
   (6) Install the ozone converter (16) with the clamps (13) and (20) on the structure (12) and (21).
NOTE: The clamps (13) and (20) must be sufficiently loose to align the ozone converter (16) with the blanket (1) and the isolation valve (11).
   (7) Put the new AIPC 21-58-03-01-350 SEAL (2) or AIPC 21-58-83-01-200 SEAL (2) in position on the flange of the ozone converter (16).
   (8) Install the ozone converter (16) on the blanket (1) with the clamp (3).
   (9) TORQUE the clamp (3) to between 0.57 and 0.51 m.daN (50.44 and 45.13 lbf.in )
T.
   (10) Put the new
AIPC 21-58-03-01-360 SEAL (10) or AIPC 21-58-83-01-060 SEAL (10) in position on the flange of the ozone converter (16).
   (11) Install the ozone converter (16) on the isolation valve (11) with the clamp (9).
   (12) TORQUE the clamp (9) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
T.
   (13) TORQUE the clamps (13) and (20) to between 0.38 and 0.28 m.daN (33.63 and 24.78 lbf.in )
T.
   (14) Install the screw (7), the washer (6), the bonding strap (8), the washer (5) and the nut (4) (
Ref. AMM TASK 20-28-00-912-802).
   (15) If removed, install the insulation (17) on the ozone converter (16).
Subtask 21-58-42-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAN28
** ON A/C NOT FOR ALL
121VUIGGS/CTRL7YAP28
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 21-58-42-710-050-A ** ON A/C NOT FOR ALL
C. Leak Test
WARNING: PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
   (1) Do the two subsequent steps at the same time.
NOTE: Two persons are necessary to do these steps.
     (a) Do the operational test of the conditioned service air system with bleed air (Ref. AMM TASK 21-58-00-710-002).
     (b) Examine the joints of the ozone converter (16) for signs of air leakage.
   (2) If necessary, repair the leaks.
5. Close-up
Subtask 21-58-42-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel 191BB (Ref. AMM TASK 53-35-13-400-002).
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the access platform(s).
Subtask 21-58-42-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:35 UTC