1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
811
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-58-00-710-001-A
Operational Test of the Conditioned Service Air System without Bleed Air
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 21-58-34-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-58-34-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
Subtask 21-58-34-010-051-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the access door 811.
   (2) Make sure that the access door 811 is open.
4. Procedure
Subtask 21-58-34-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the CSAS Control Unit
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Install the CSAS control unit (4) on its rack (6).
   (6) Carefully push the handle (3) until the CSAS control unit (4) connects to the rack electrical connector (5).
   (7) Install the knurled nut (1) on the stud (2).
   (8) Tighten the knurled nut (1).
Subtask 21-58-34-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VUCSAS / CTRL1HWU17
Subtask 21-58-34-710-050-A ** ON A/C NOT FOR ALL
C. Do an operational test of the conditioned service air system without bleed air (Ref. AMM TASK 21-58-00-710-001).
5. Close-up
Subtask 21-58-34-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 811.
   (3) Remove the access platform(s).
Subtask 21-58-34-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).