Installation of the Duct Temperature Sensor
TASK 21-58-11-400-001-A
Installation of the Duct Temperature Sensor
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 21-58-11-860-050-A ** ON A/C NOT FOR ALL
Subtask 21-58-11-420-050-A ** ON A/C NOT FOR ALL
Subtask 21-58-11-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:34 UTC
Installation of the Duct Temperature Sensor
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
FIN: 115HW ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 1.0 and 0.8 m.daN (88.50 and 70.80 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06LDG2) | Non Hardening Jointing Putty-High Temp. Area - Structure |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191KB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | PACKING-PREFORMED | AIPC 21-58-54-01-130 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-58-00-710-002-A | Operational Test of the Conditioned Service Air System with Bleed Air |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 21-58-11-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 30VU, make sure that:
(4) Make sure that an access platform is in position at zone 191.
(5) Make sure that the access panel 191KB is removed (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-58-11-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) On the panel 30VU, make sure that:
- The APU BLEED pushbutton switch is in the off position (the ON legend is off).
- The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
- A warning notice is in position to tell persons not to operate these pushbutton switches.
(4) Make sure that an access platform is in position at zone 191.
(5) Make sure that the access panel 191KB is removed (Ref. AMM TASK 53-35-13-000-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
Subtask 21-58-11-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Temperature Sensor
(1) Clean the component interfaces and the adjacent area.
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Remove the PLUG-BLANKING from each disconnected line end.
(4) Apply a small amount of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the new AIPC 21-58-54-01-130 PACKING-PREFORMED (1).
(5) Put the new packing (1) in position on the duct (4).
(6) Install the temperature sensor (2) in the duct (4).
(7) TORQUE the temperature sensor (2) to between 1.0 and 0.8 m.daN (88.50 and 70.80 lbf.in )
and safety with 14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(8) Connection of the Electrical Connector
(a) Remove the CAP-BLANKING from each electrical connector and receptacle.
(b) Make sure that all the electrical connections are clean and in the correct condition.
(c) Connect the electrical connector (3) to the temperature sensor (2).
Subtask 21-58-11-865-052-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Remove the PLUG-BLANKING from each disconnected line end.
(4) Apply a small amount of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the new AIPC 21-58-54-01-130 PACKING-PREFORMED (1).
(5) Put the new packing (1) in position on the duct (4).
(6) Install the temperature sensor (2) in the duct (4).
(7) TORQUE the temperature sensor (2) to between 1.0 and 0.8 m.daN (88.50 and 70.80 lbf.in )
and safety with (8) Connection of the Electrical Connector
(a) Remove the CAP-BLANKING from each electrical connector and receptacle.
(b) Make sure that all the electrical connections are clean and in the correct condition.
(c) Connect the electrical connector (3) to the temperature sensor (2).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-58-11-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Leak Test
(b) Examine the joint of the temperature sensor (2) for signs of air leakage.
(2) If necessary, repair the leak.
5. Close-upWARNING:
PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
(1) Do the two subsequent steps at the same time. NOTE: Two persons are necessary to do these steps.
(a) Do the operational test of the conditioned service air system with bleed air (Ref. AMM TASK 21-58-00-710-002). (b) Examine the joint of the temperature sensor (2) for signs of air leakage.
(2) If necessary, repair the leak.
Subtask 21-58-11-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 191KB (Ref. AMM TASK 53-35-13-400-002).
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
Subtask 21-58-11-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 191KB (Ref. AMM TASK 53-35-13-400-002).
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
Temperature Sensor (115HW)