Removal of the Emergency Ram Air Inlet Actuator
TASK 21-55-51-000-001-A
Removal of the Emergency Ram Air Inlet Actuator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-55-51-861-050-A Subtask 21-55-51-865-050-A
Subtask 21-55-51-020-050-A
[Rev.10 from 2021]
2026.04.02 06:11:33 UTC
Removal of the Emergency Ram Air Inlet Actuator
FIN: 7HZ
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191AB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
Subtask 21-55-51-861-050-A Subtask 21-55-51-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-55-51-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/RAM/AIR/INLET | 1HZ | D10 |
C. Get Access
(1) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position at the access panel 191AB.
(2) Remove the access panel 191AB.
4. Procedure(1) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position at the access panel 191AB.
(2) Remove the access panel 191AB.
Subtask 21-55-51-020-050-A
A. Removal of the Actuator
(1) Disconnect the bonding strip (9)
(a) Remove the nut (8).
(b) Remove the screw (11) and the washer (10).
(2) Disconnect the electrical connector (16).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove and discard the cotter pins (1).
(5) Remove the nut (13) and the washer (12).
(6) Remove the bolt (14).
(7) Remove the nut (2) and the washer (3).
(8) Hold the actuator (15) and remove the bolt (5) and the washer (4).
(9) Remove the actuator (15), the bushings (6) and the washers (7).
(1) Disconnect the bonding strip (9)
(a) Remove the nut (8).
(b) Remove the screw (11) and the washer (10).
(2) Disconnect the electrical connector (16).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove and discard the cotter pins (1).
(5) Remove the nut (13) and the washer (12).
(6) Remove the bolt (14).
(7) Remove the nut (2) and the washer (3).
(8) Hold the actuator (15) and remove the bolt (5) and the washer (4).
(9) Remove the actuator (15), the bushings (6) and the washers (7).
Emergency Ram Air Inlet Actuator