W DOC AIRBUS | AMM A320F

Reactivation of the Emergency Ram-Air Inlet


TASK 21-55-00-440-001-A
Reactivation of the Emergency Ram-Air Inlet


FIN: 7HZ
1. Reason for the Job
MMEL 21-55-01A
EMERGENCY RAM AIR INLET
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-55-00-040-001-A
Operational Test of the Emergency Ram-Air Inlet System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-55-00-861-054-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-55-00-010-051-A
B. Get Access
   (1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
   (2) Put the ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position below the access of the emergency ram-air inlet actuator.
Subtask 21-55-00-865-055-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/RAM/AIR/INLET1HZD10
4. Procedure
Subtask 21-55-00-440-050-A
A. Reactivation of the Emergency Ram-Air Inlet
   (1) Make sure that all the electrical connections are clean and in the correct condition.
   (2) Remove the temporary attachment and connect the electrical connector (1).
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 21-55-00-865-054-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/RAM/AIR/INLET1HZD10
Subtask 21-55-00-710-052-A
C. Do the operational test of the emergency ram-air inlet system (Ref. AMM TASK 21-55-00-040-001)
5. Close-up
Subtask 21-55-00-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel (Ref. AMM TASK 53-35-13-400-002)
   (3) Remove the access platform(s).
Subtask 21-55-00-862-054-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002)
[Rev.10 from 2021] 2026.04.02 06:11:32 UTC