Removal of the Pack Downstream Check-Valves
TASK 21-52-43-000-001-A
Removal of the Pack Downstream Check-Valves
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-52-43-861-051-A Subtask 21-52-43-865-050-A
Subtask 21-52-43-020-050-A
[Rev.10 from 2021]
2026.04.02 06:47:28 UTC
Removal of the Pack Downstream Check-Valves
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
CAUTION:
YOU MUST CLOSE THE CARGO COMPARTMENT DOORS BEFORE THE WIND SPEED IS MORE THAN 65 KNOTS TO PREVENT DAMAGE TO THE DOOR OR TO THE AIRCRAFT STRUCTURE.
CAUTION:
WHEN YOU OPEN AND CLOSE THE CARGO DOORS, MAKE SURE THAT THE ACCESS PLATFORM IS AT THE CORRECT HEIGHT. IF IT IS TOO HIGH, IT WILL PREVENT FREE MOVEMENT OF THE DOORS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| FOR [15HM] (P1 CHECK VALVE DOWNSTREAM) | ||
| No specific | AR | COVER - PROTECTION |
| FOR [16HM] (P2 CHECK VALVE DOWNSTREAM) | ||
| No specific | AR | COVER - PROTECTION |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 825 | |
| FOR [15HM] (P1 CHECK VALVE DOWNSTREAM) | |
| 131PW, 191BB | |
| FOR [16HM] (P2 CHECK VALVE DOWNSTREAM) | |
| 132PW, 192FB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-52-43-861-051-A Subtask 21-52-43-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-52-43-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 15HM (P1 CHECK VALVE DOWNSTREAM) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 16HM (P2 CHECK VALVE DOWNSTREAM) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
C. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) at forward cargo-compartment door 825.
(Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panels
(Ref. AMM TASK 53-35-13-000-002):
(a) FOR [15HM] (P1 CHECK VALVE DOWNSTREAM)
(b) FOR [16HM] (P2 CHECK VALVE DOWNSTREAM)
(4) Remove the forward cargo-compartment partitions
(Ref. AMM TASK 25-54-12-000-001):
(a) FOR [15HM] (P1 CHECK VALVE DOWNSTREAM)
(b) FOR [16HM] (P2 CHECK VALVE DOWNSTREAM)
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) at forward cargo-compartment door 825.
WARNING:
DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED:
(2) Open forward cargo-compartment door 825 - WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE AIRCRAFT OR EQUIPMENT.
(Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panels
(Ref. AMM TASK 53-35-13-000-002):
(a) FOR [15HM] (P1 CHECK VALVE DOWNSTREAM)
(b) FOR [16HM] (P2 CHECK VALVE DOWNSTREAM)
(4) Remove the forward cargo-compartment partitions
(Ref. AMM TASK 25-54-12-000-001):
(a) FOR [15HM] (P1 CHECK VALVE DOWNSTREAM)
(b) FOR [16HM] (P2 CHECK VALVE DOWNSTREAM)
Subtask 21-52-43-020-050-A
A. Removal of the Pack Downstream Check-Valve
(1) Make sure that you have access from the inside and the outside of the aircraft.
(2) Remove the pack downstream check-valves:
(a) FOR [15HM] (P1 CHECK VALVE DOWNSTREAM)
1 Remove the clamp (7) and carefully disconnect the flange (8).
2 Remove the nut (12), the bolt (9) and the washer (10) and disconnect the bonding strap (11).
3 Remove the clamp (2) and disconnect the bellows (1).
4 Hold the pack downstream check-valve (6) and remove the bolts (3) and the washers (4).
5 Remove the pack downstream check-valve (6) and the seal (5).
6 Put a COVER - PROTECTION on the open ends of the pack downstream check-valve (6), the bellows (1) and the flange (8).
(b) FOR [16HM] (P2 CHECK VALVE DOWNSTREAM)
1 Remove the clamps (27) and (41).
2 Remove the nut (34), the bolt (30) and the washer (31) and disconnect the bonding straps (32) and (33).
3 Remove the nuts (37) and (40) and the washers (36) and (39).
4 Hold the duct assembly (29) and remove the bolts (35) and (38).
5 Disconnect the tie-rods (43) and (44) and safety them to the structure.
6 Carefully disconnect the duct assembly (29) from the flange (42) and the pack downstream check-valve (26).
7 Remove the duct assembly (29).
8 Remove the packing (28).
9 Put a COVER - PROTECTION on the open ends of the duct assembly (29), the pack downstream check-valve (26) and the flange (42).
10 Remove the clamp (23) and carefully disconnect the bellow (21) from the pack downstream check-valve (26).
11 Hold the pack downstream check-valve (26) and remove the bolts (24) and the washers (25).
12 Remove the pack downstream check-valve (26) and the seal (5).
13 Put a COVER - PROTECTION on the open ends of the pack downstream check-valve (26) and the bellows (21).
NOTE: Two persons are necessary for this procedure.
(1) Make sure that you have access from the inside and the outside of the aircraft.
(2) Remove the pack downstream check-valves:
(a) FOR [15HM] (P1 CHECK VALVE DOWNSTREAM)
1 Remove the clamp (7) and carefully disconnect the flange (8).
2 Remove the nut (12), the bolt (9) and the washer (10) and disconnect the bonding strap (11).
3 Remove the clamp (2) and disconnect the bellows (1).
4 Hold the pack downstream check-valve (6) and remove the bolts (3) and the washers (4).
5 Remove the pack downstream check-valve (6) and the seal (5).
6 Put a COVER - PROTECTION on the open ends of the pack downstream check-valve (6), the bellows (1) and the flange (8).
(b) FOR [16HM] (P2 CHECK VALVE DOWNSTREAM)
1 Remove the clamps (27) and (41).
2 Remove the nut (34), the bolt (30) and the washer (31) and disconnect the bonding straps (32) and (33).
3 Remove the nuts (37) and (40) and the washers (36) and (39).
4 Hold the duct assembly (29) and remove the bolts (35) and (38).
5 Disconnect the tie-rods (43) and (44) and safety them to the structure.
6 Carefully disconnect the duct assembly (29) from the flange (42) and the pack downstream check-valve (26).
7 Remove the duct assembly (29).
8 Remove the packing (28).
9 Put a COVER - PROTECTION on the open ends of the duct assembly (29), the pack downstream check-valve (26) and the flange (42).
10 Remove the clamp (23) and carefully disconnect the bellow (21) from the pack downstream check-valve (26).
11 Hold the pack downstream check-valve (26) and remove the bolts (24) and the washers (25).
12 Remove the pack downstream check-valve (26) and the seal (5).
13 Put a COVER - PROTECTION on the open ends of the pack downstream check-valve (26) and the bellows (21).
Pack Downstream Check Valve 15HM (16HM)